HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD FOURTH 2545 RESEARCH BLVD - Filed CS-COMMENT SHEETS - 2016-05-20Fort Collins
/0*�
July 10, 2012
Angela Milewski
Fort Collins, CO
RE: 2545 Research Blvd -Addition, MA120065, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
kgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter.
Comment Summary:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: Construction Drawings
Comment Number: 1
Comment Originated: 07/06/2012
07/06/2012: The two following notes need to be added to the overall utility plan sheet:
• Limits of street cut are approximate. Final limits are to be determined in the field by the
City Engineering Inspector. All repairs to be in accordance with City street repair standards.
Added to Sheet 4
• Damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored in like kind at the Developer's expense prior to the
acceptance of completed improvements and/or prior to the issuance of the first Certificate of
Occupancy. The limits of the repairs will be identified in the field by the City Engineering
Inspector prior to and over the course of the project and will not be shown on the plans.
Added to Sheet 4
Comment Number: 2 Comment Originated: 07/06/2012
07/06/2012: Detail 1601 also needs to be added to the utility plans.
Added to Sheet 7
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 06/27/2012
06/27/2012: There is a 13,000 volt power line under the proposed addition that serves the
adjacent building (2537 Research Blvd.). Also, there is a 13,000 volt power line serving 2545
Research Blvd. that is under the corner of the proposed addition. The builder will be
responsible for coordinating with Light & Power Engineering (221-6700) the relocation of these
lines and the associated cost. If the electric capacity of the building will change, Light & Power
Engineering will need a Commercial Service Information (C-1) form completed.
Shown on Sheet 4
Comment Number: 2 Comment Originated: 06/27/2012
06/27/2012: Please send an AutoCad (version 2008) drawing of the final utility plan to Terry Cox
at TCOX @ FCGOV.COM.
Sent on July 24th
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/09/2012
07/09/2012: A cleanout is suggested for the 8-inch storm pipe at the 45 degree bend.
Added as requested and shown on Sheet 4
Comment Number: 2 Comment Originated: 07/09/2012
07/09/2012: Please add in the drainage letter that water quality is provided for the new building
by letting most of the roof drainage flow and infiltrate into the proposed landscaping and turf
lawn.
See revised drainage letter
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty�fcgov.com
Topic: Building Elevations
Comment Number: 3
07/06/2012: No comments.
Topic: Construction Drawings
Comment Number: 4
07/06/2012: No comments.
Topic: Landscape Plans
Comment Number: 2
07/06/2012: No comments.
Topic: Site Plan
Comment Originated: 07/06/2012
Comment Originated: 07/06/2012
Comment Originated: 07/06/2012
Comment Number: 1 Comment Originated: 07/06/2012
07/06/2012: No comments.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: General
Comment Number: 1
07/09/2012: No comments.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1
07/03/2012: Site plan shall include the trash enclosure location.
Added to sheet L 1
Comment Originated: 07/09/2012
Comment Originated: 07/03/2012
Land Use Code (LUC) 3.2.5 Trash/recycling enclosures shall be located on a concrete cement
pad and designed with walk-in access without having to open the main service gate. The
proposed enclosure does not identify a concrete cement pad nor does it have a walk-in
access.
Concrete pad and walk-in access have been added to sheet L1
Comment Number: 2
Comment Originated: 07/03/2012
07/03/2012: Please provide accurate existing parking spaces and proposed parking spaces
counts on site plan.
Added to Sheet L 1
LUC 3.2.2(K)(5) Vehicle accessibility spaces are required with 151 spaces 6 of those are
required to be accessibility spaces (if total spaces are between 101-150 then only 5 required
accessibility spaces) and at least one of the of the six needs also to be van accessible.
The approved parking lot configuration and quantities shall remain in place. Since we are not
adding new spaces, but actually 3 spaces will become unusable because of the addition of a trash
enclosure, no additional handicap spaces should be required for a Minor Amendment.
These spaces shall be located as close as possible to the primary entrances of the building
and be designated by a sign.
Comment Number: 3 Comment Originated: 07/03/2012
07/03/2012: LUC 3.2.2(C) Bike racks are required please identify locations and number of
bikes spaces at each location. These locations shall be located near the primary entrances of
the buildings.
Bike rack locations and quantities have been added to sheet L 1.
Comment Number: 4 Comment Originated: 07/03/2012
07/03/2012: LUC 3.2.4 Requires a lighting plan see section for standards, the lighting plan shall
include fixture types.
The approved lighting plan shall remain in place. We have included the electrical plan showing
additional light bollards being provided.
Sincerely,