Loading...
HomeMy WebLinkAboutBOUTON HOUSE - Filed GC-GENERAL CORRESPONDENCE - 2016-05-18GLENN KONEN 121 North StorwoOd Street Fort CoMM. Colorado S0521 April 14, 2015 TO: Randy Everret RE: Permission to Construct with Restoration We grant permission for your contractor to remove a portion of our shared driveway pan and excavate in our shared driveway for the new sewer line to the barn. We understand that the pipe will be installed on your side of the property fine but the trench excavation may possibly extend on to our side of the line for a short distance. VW assume that you will be responsible for the following restoration procedures. 1. Proper compaction of the trench. and sidewalk. The new concrete finish should 2. Replacing the removed concrete pan match the existing as close as possible. 3. Restoring the gravel surface of the driveway to match the existing. 4. Restoring any future settlement that takes place as a result of the construction. Sincerely, Glenn Konen fog-fi�— Kathleen Konen