HomeMy WebLinkAboutNORTHFIELD FILING 1 EXPANDED - FDP190012 - SUBMITTAL DOCUMENTS - ROUND 3 - EROSION CONTROL LETTER/REPORTEROSION CONTROL REPORT FOR Northfield Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: Landmark Real Estate Holdings, LLC 6341 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 October 15, 2019 Job Number 18-1000-00 6355 FAIRGROUNDS AVE, SUITE 100, WINDSOR, COLORADO 80550 | PHONE 970.674.7550 October 15, 2019 Mr. Jesse Schlam City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 RE: Erosion Control Report/Stormwater Management Plan for Northfield Dear Jesse, We are pleased to submit for your review, this Erosion Control Report/Stormwater Management Plan for the Northfield subdivision. This report provides the City with an erosion control plan for the proposed development that addresses the topics outlined in the City Erosion Control Report Requirements. This plan mimics the State of Colorado General Permit and Stormwater Management Plan requirements. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Jason T. Claeys, P.E., LEED AP Highland Development Services Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................. i General Description and Location .................................................................................................. 1 Site Description and Location ...................................................................................................... 1 Site Soils ....................................................................................................................................... 1 BMPs for Stormwater Pollution Prevention ................................................................................... 5 Erosion and Sediment Controls ................................................................................................... 5 Materials Handling and Spill Prevention ..................................................................................... 7 Stormwater Management Controls ................................................................................................ 9 SWMP Administrator ................................................................................................................... 9 Identification of Potential Pollution Sources ............................................................................... 9 Final Stabilization and Long-term Stormwater Management ...................................................... 11 Inspection and Maintenance ........................................................................................................ 12 SWMP Implementation................................................................................................................. 13 Appendix ....................................................................................................................................... 14 Appendix A – BMP Details ........................................................................................................... A Appendix B – Drainage & Erosion Control Plans ......................................................................... B Appendix C – Construction Sequence ......................................................................................... C Appendix D – Erosion Control Escrow Calculation ...................................................................... D Appendix E – Soil Information ..................................................................................................... E Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION Northfield is located in the Southeast Quarter of Section 1, Township 7 North, Range 67 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, within the State of Colorado. More specifically, Northfield is located north of the ALTA Vista Subdivision, west of N. Lemay Avenue, and southeast of the Lake Canal irrigation ditch. The project site is approximately 55.26 acres and is currently undeveloped agricultural land. The site appears to be vegetated with grasses harvested for livestock feed. The site generally slopes from the northwest to the southeast at about 0.5% slope. There are no existing surface improvements currently on the property. The property is proposed to be subdivided into multiple single-family lots and condominium tracts. Northfield will consist of 139 single family attached (fee simple) units and 301 condominium units, a mixed-use building with a combination of retail and apartments, and a community clubhouse. SITE SOILS The Northfield site consists of Loveland clay loam and Nunn clay loam and are classified as Type C hydrologic group. According to USDA/Natural Resource Conservation Group, this soil has a slow infiltration rate when thoroughly wet. These soils consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. SOIL TYPE PERCENT OF SITE HYDROLOGIC SOIL GROUP1 K FACTOR2 WIND GROUP3 Loveland clay loam, 0-1% slopes 20.9% C 0.20 6 Nunn clay loam, 0-1% slopes 29.2% C 0.32 6 Nunn clay loam, wet, 1-3% slopes 49.9% C 0.24 6 1Hydrologic soil groups range from A to D with group A having a high infiltration rate and D having a very slow infiltration rate 2K factors range from 0.02 to 0.69. The higher value, the more susceptible the soil is to sheet and rill erosion by water. 3Soils assigned to wind group 1 are the most susceptible to wind erosion, soils assigned to wind group 8 are the least susceptible. 2 Overall, the soils on site can be classified as moderately erodible and thus the project must implement an adequate erosion control strategy to control sediment migration from leaving the site. Please refer to Appendix E for the detailed on-site soil information from the NRCS Soil Survey of Larimer County. The anticipated sequence of construction shall progress as follows: 1) Installation of perimeter and offsite erosion control measures (mainly outlet protection at the detention pond outlet structures). Other measures as required for erosion control will be constructed throughout the project. 2) Clearing, stripping and grading 3) Utility installation 4) Sub-grade preparation for the parking areas, drives and sidewalks 5) Curb, gutter, and sidewalks 6) Paving 7) Building construction (this may occur simultaneously with items 5 through 7) 8) Final grading and landscaping. All disturbed ground will be impervious (concrete, asphalt, or building), seeded and mulched, sodded or xeriscaped to permanently stabilize the site. The run-off coefficients associated with this project for onsite sub-basins are as follows: TRIBUTARY SUB-BASIN AREA (acres) RUNOFF COEFFIECENT C2 C100 A1 0.66 0.90 1.00 A2 0.20 0.94 1.00 A3 1.53 0.76 0.95 A4 0.88 0.74 0.93 A5 0.35 0.92 1.00 A6 1.14 0.86 1.00 A7 0.69 0.74 0.92 A8 0.76 0.76 0.95 A9 0.54 0.78 0.98 A10 1.31 0.86 1.00 A11 0.51 0.88 1.00 A12 1.25 0.54 0.67 A13 0.56 0.92 1.00 A14 0.52 0.85 1.00 3 A15 2.48 0.65 0.82 A16 0.80 0.86 1.00 A17 0.90 0.30 0.38 A18 3.02 0.37 0.46 A Total 18.10 B1 2.13 0.54 0.67 B2 1.30 0.79 0.99 B3 1.07 0.72 0.90 B4 1.32 0.89 1.00 B5 0.50 0.88 1.00 B6 0.52 0.94 1.00 B7 0.27 0.85 1.00 B8 0.40 0.80 1.00 B9 2.29 0.85 1.00 B10 0.48 0.69 0.87 B11 2.47 0.78 0.98 B12 0.41 0.26 0.33 B13 0.38 0.89 1.00 B14 0.36 0.87 1.00 B15 0.89 0.84 1.00 B16 0.54 0.93 1.00 B17 0.35 0.84 1.00 B18 0.43 0.70 0.87 B19 0.43 0.72 0.90 B20 2.94 0.36 0.45 B Total 19.48 C1 1.30 0.48 0.60 C2 0.14 0.53 0.67 C3 0.83 0.25 0.31 C4 0.25 0.70 0.88 C5 1.15 0.73 0.91 C Total 3.67 D1 0.58 0.46 0.58 D2 0.65 0.89 1.00 D3 1.30 0.25 0.31 D4 0.16 0.61 0.76 D5 0.43 0.87 1.00 D6 0.10 0.70 0.87 D7 0.09 0.73 0.92 D8 0.72 0.63 0.78 D9 0.61 0.83 1.00 D10 0.16 0.65 0.81 D11 0.88 0.89 1.00 D12 0.76 0.87 1.00 D13 0.28 0.67 0.83 D14 2.50 0.31 0.39 D15 0.44 0.72 0.90 D Total 9.65 4 E1 0.48 0.28 0.35 E2 0.66 0.82 1.00 E3 1.55 0.85 1.00 E4 1.95 0.84 1.00 E5 0.58 0.76 0.95 E6 0.56 0.83 1.00 E7 0.75 0.83 1.00 E8 0.60 0.75 0.93 E9 0.39 0.71 0.89 E10 0.24 0.81 1.00 E Total 7.79 Overall 58.69 No outside sources of pollution currently exist on this site. Potential pollutant sources brought onto the site during construction will be discussed (along with spill prevention) below. The anticipated non-stormwater components of discharge with this project are landscape irrigation return flows. Runoff from the site will flow toward the detention ponds and through the below grade infiltration galleries and then be conveyed through a storm pipe network to the existing North East College Corridor Outfall (NECCO) storm drain system in Suniga Road. 5 BMPS FOR STORMWATER POLLUTION PREVENTION EROSION AND SEDIMENT CONTROLS STRUCTURAL PRACTICES: Structural practices for the site will consist mainly of vehicle tracking pads, concrete washout areas, temporary sediment basins at the proposed infiltration gallery outlet structures and rain gardens, inlet protection, silt fencing, and sediment control logs which are described in detail in the following paragraphs. Detail drawings of these BMPs are also included in Appendix A. These BMPs are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMPs are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. All BMPs shall be inspected and repaired or replaced as described further in this report and as required to satisfy the conditions of the Permit. Project is anticipated to be constructed in two phases, with Phase 1 representing the majority of the site area including Suniga Road, Lemay Avenue and all storm drainage and detention facilities. Phase 2 includes the area south of Suniga Road and west of Pond D, refer to the plans for phase limits. Refer to Erosion & Sedimentation Control Plans for detailed BMP sequencing and maintenance plans for the project through all stages of construction. Vehicle tracking pads are intended to trap mud and sediment within coarse grain material and provide clean access to public roadways. Wherever construction vehicle access routes intersect paved public roads a vehicle tracking control pad shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Pads shall be maintained and refurbished when necessary to obtain their intended result. Concrete washout area is intended to contain washout liquids and solids that result from the cleaning of concrete trucks and pumps. Washouts should be placed near the area where the concrete is being poured and 50 ft from any stormwater or drainage course. Three below grade infiltration galleries are proposed for the site to meet Low Impact Development requirements for water quality treatment. These galleries are located in Ponds A2, B2, & B3. In addition to their function as treatment facilities, the galleries will be 6 constructed with a surrounding underdrain set 12” below the bottom of the infiltration chambers that serve as part of the permanent groundwater dewatering system for the site. As such, the galleries, outlet structures, and underdrains will need to be installed early in the construction sequence. To protect the chambers from sedimentation during construction, the outlet pipe to the galleries will be blocked and a temporary opening provided in the outlet structure for flows to bypass. Additionally, a temporary sediment basin will be constructed around the outlet structures to facilitate sediment removal prior to entering structure. When contributing areas are stabilized, outlet pipe to the galleries will be unblocked and temporary opening grouted. Rain gardens will also be utilized on this site for LID treatment. Rain gardens are to be installed at the conclusion of construction activities and concurrent with landscape installation. Necessary erosion control protection will be placed to minimize risk of native soils migrating to the rain garden growing media. The rain garden grading may be utilized as a sediment trap prior to the installation of the drainage course and growing media. Inlet protection, silt fencing, and sediment control logs prevent sediment from entering storm drainage systems prior to permanent stabilization of the disturbed site area via ponding and settling of sediment. Sediment control logs or gravel bags shall be placed at existing and proposed inlets on and near the site as inlet protection. Inlet protection must be inspected and maintained after every rainfall event that produces runoff. Sediment must be removed and rocks replaced. Silt fencing and sediment control logs will also be used as perimeter protection at the toe of slopes and landscaped areas. Silt fencing and sediment control logs shall be installed immediately upon completion of over-lot grading. NON-STRUCTURAL PRACTICES: All low sloped areas exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. All steep sloped areas exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall have slope protection. The contractor shall use a "tracked" vehicle, run perpendicular to slope so that the tracking runs on the contour to inhibit rill/gully erosion; the contractor may use other windrow-type methods as necessary. No soil shall remain exposed by land disturbing activity for more than thirty (30) days. At that time temporary or permanent erosion control seed/mulch, landscaping, etc. is required. 7 Additional Non-Structural Practices are strongly encouraged such as minimizing the disturbance of soils and vegetation, providing educational materials on disposal /recycling, spill prevention / clean up, identification and elimination of illicit discharges, promotion of street sweeping and the development of public education programs. THE CONTRACTOR SHALL ADD ANY AND ALL BMP’S AND DETAILS NEEDED FOR SEDIMENT/EROSION CONTROL. MATERIALS HANDLING AND SPILL PREVENTION Potential impacts from significant materials and their handling are as follows: Chemicals, cleaning substances, and petroleum products related to the construction will be stored within the construction trailer or storage shed where it will not be in contact with precipitation. No storage of these materials will be allowed outside. Fueling and maintenance of equipment shall take place at the construction staging area. Fueling will be accomplished with fueling trucks on an as needed basis. Absorbent (kitty litter) will be in the construction trailer and applied on any spill immediately and the dry material disposed of properly and legally. All construction waste shall be disposed of in the available dumpsters throughout the workday. Liquid wastes will be hauled off site and disposed of properly and legally. Any cleaning or maintenance of small equipment will be required to be done within a containment device (horse trough or small “kiddy pool”) and the liquid disposed of properly and legally. In the event of any spill, the SWMP Administrator shall be immediately notified. Spills can be broken into three categories. Their definitions and the procedures required to address the spills are as follow: MINOR SPILL – A spill generally of less than 5 gallons which is unlikely to reach adjacent waters (i.e. equipment leak). Procedure: a. Stop the source of the spill. b. Contain the spillage. c. Contact the SWMP Administrator. d. Clean up the spill with on-site absorbent material (kitty litter) e. Dispose of the dry material properly or legally. 8 f. Document the spill and the response in the SWMP including dates and times – verify that the pollutants are completely cleaned up. g. Include incident in the following training meeting. h. Provide information to the City of Fort Collins at the next regular inspection. SIGNIFICANT SPILL – A spill of pollutants or oils of any size that will likely or has reached adjacent waters, may endanger health or the environment, or which may exceed a water quality standard. Procedure: a. Stop the source of the spill. b. Contain the spillage. c. Contact the SWMP Administrator. d. Clean up the spill with on-site absorbent material (kitty litter) e. Dispose of the dry material properly or legally. f. Document the spill and the response in the SWMP – verify that the pollutants are completely cleaned up. g. Notify the City of Fort Collins (970) 221-6700 and the Colorado Department of Public Health and Environment spill reporting line (877) 518-5608 of the spill. h. Notify the same two entities above with a written submission (outlined within the permit) within 5 calendar days. i. Include incident in the following training meeting. HAZARDOUS SPILL – A spill of a dangerous substance requiring expert cleanup. Procedure: a. Secure the area – do not approach the spill. b. Offer first aid to any injured parties. c. Call 911 and describe the nature of the spill and any injuries. d. If possible, isolate downstream areas from the spill (for example, cover an inlet that is downstream and a safe distance from the spill with plastic and soil). e. Contact the SWMP Administrator. f. Document the spill and the response in the SWMP g. Notify the City of Fort Collins (970) 221-6700 and the Colorado Department of Public Health and Environment spill reporting line (877) 518-5608 of the spill. h. Notify the same two entities above with a written submission (outlined within the permit) within 5 calendar days. i. Include incident in the following training meeting. 9 STORMWATER MANAGEMENT CONTROLS SWMP ADMINISTRATOR The Local Contact and SWMP Administrator is (INSERT CONTACT NAME, POSITION, COMPANY, and PHONE NUMBER). (INSERT CONTACT) will be responsible for developing, implementing, maintaining, and revising the SWMP. (INSERT CONTACT) will also be responsible for required inspections and coordinating and documenting changes or repairs resulting from inspections. (INSERT CONTACT) will be responsible for the training and enforcement aspects of the SWMP and he is the first point of contact for any stormwater issues. IDENTIFICATION OF POTENTIAL POLLUTION SOURCES The permit identifies 13 potential sources that must be evaluated for their potential to contribute pollutants to stormwater discharge. These items have been evaluated below for this project: 1. Disturbed and stored soil – YES – The construction will require that areas be disturbed exposing soil including foundation construction, paving and repaving, slope construction, and utility installation, and demolition required as shown on the plans. BMPs will include silt fence and sediment control logs and inlet protection on existing and proposed inlets, minimizing disturbance of existing vegetation and hard surfaces, and slope roughening and tracking of slopes after disturbance and prior to landscaping, paving, or building will be implemented. 2. Vehicle tracking of sediment – YES – The construction will require that subgrade be prepared for pavement and that vehicles drive on unpaved surfaces to the proposed buildings and utility improvement locations. BMPs will include a policy that vehicles be clean prior to entering the site and, if they become muddy during construction or earthwork activities, mud is removed by hand from the vehicle prior to departing the site in an area near the vehicle tracking pad. Any soil that is tracked from the site is to be disposed of in the trash dumpster by sweeping or scraping the material off the street. Any muddy vehicle will use the vehicle tracking pad prior to leaving the site. 3. Management of contaminated soil – NO – To our knowledge, there is not any existing soil contamination on-site. 4. Loading and unloading operations – YES – Chemicals and petroleum products will be brought to the site. Anytime these are being transported, they will be in a sealed container. 5. Outdoor storage activities – YES – Inert materials such as wood and stone will be stored outside and will likely be covered with tarps or plastic but are not pollutant sources and are not covered by the permit. Chemicals and petroleum 10 products will be stored within the construction trailer or storage shed. Cement and mortar bags (if not contained in a vehicle or storage shed) will be completely covered with plastic to avoid contact with precipitation. 6. Vehicle and equipment maintenance and fueling – YES – Vehicle maintenance and fueling, associated with construction of the proposed improvements, will take place. No fuel will be stored on site. 7. Significant dust or particulate generating processes – YES – Most of the 58 acre site will be exposed from the over-lot grading of the project. In order to control the dust or particulate generating process a water truck or similar watering device will be available at all times. The disturbed ground will be watered as needed to control dust from leaving the site. The area of heavy construction is very limited and none of the operations are expected to generate significant dust. All dust control measures shall be completed in reference to the City’s Fugitive Dust Ordinance (Ordinance No. 044, 2016) and Dust Prevention and Control Manual. 8. Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, etc. – YES – Fertilizers and pesticides will not be used. Any cleaning or maintenance of small equipment will be required to be done within a containment device (horse trough or small “kiddy pool” and the liquid disposed of properly and legally. 9. On-site waste management – YES – The building and site construction will result in construction waste. A dumpster for trash and a dumpster for bulk recycling will be on the site. Waste will be hauled to the dumpsters by hand or in loaders. Dumpsters will be hauled off as needed. No construction waste will be left outside overnight without being located in a dumpster. No construction debris (including broken concrete) may be buried on the site. 10. Concrete truck/equipment washing – YES – A concrete washout will be provided on site. This will be used for trucks and for any masonry / concrete tools. 11. Dedicated asphalt of concrete batch plants – NO – None on this project. 12. Non-structural waste sources such as worker trash and portable toilets – YES – Trash dumpster will be available for worker’s trash and will be located near the construction trailer and emptied weekly. Portable toilets will be staked on site near the construction trailer. 13. Other areas where potential spills can occur – NO – The above 12 items are adequate for the anticipated construction process. CONTRACTOR TO UPDATE THE ABOVE INFORMATION WITH EXACT LOCATIONS OF THE CONSTRUCTION TRAILER, VEHICLE TRACKING PAD, CONCRETE WASHOUT, DUMPSTERS, AND PORTABLE TOILETS PRIOR TO COMMENCEMENT OF CONSTRUCTION AND UPDATED AS NECESSARY THROUGHOUT THE CONSTRUCTION SEQUENCE. 11 FINAL STABILIZATION AND LONG-TERM STORMWATER MANAGEMENT Final stabilization shall be considered achieved once all proposed site improvements are in place, all vegetation is established as identified on the landscape plan, all temporary BMPs are removed, and the downstream conveyances are inspected and certified to be clean and free from any construction debris resulting from the construction. Areas controlled by grass sod will be considered established upon the completion of the sod installation. Areas of seeding will be considered established at a vegetative density of 70%. After stabilization, there are no other long term, permanent BMPs proposed within the site other than routine maintenance of the site (landscape mowing, permeable paver maintenance, pavement maintenance, etc.). 12 INSPECTION AND MAINTENANCE Site inspections will be performed to effectively address maintenance, repair, and adequacy of BMPs. The site inspections will be performed by the SWMP Administrator or his designee a minimum of once every fourteen (14) calendar days on active construction sites and within 24 hours after a significant storm event (event causing erosion). As part of the site inspections the inspector will keep documentation of all inspections and BMP maintenance, including updated Site Maps indicating new BMPs or the removal of BMPs since the previous inspection. Blank Site Maps will be utilized and will be redlined by the SWMP Administrator throughout construction to note all BMPs, pollutant sources, storage locations, etc. Any maintenance, repair, or necessary installation of BMPs that are noted during the inspection must begin immediately. The modifications shall be noted in the SWMP and the action taken as a result of the inspection shall be noted and certified on or attached to the original inspection report (date and time that the repair or change was started and finished and a certification that it was done properly). 13 SWMP IMPLEMENTATION It is the responsibility of the contractor to operate and maintain all facilities and systems of treatment and control which are installed to achieve compliance with the conditions of the permit. This includes effective performance, adequate funding, adequate staffing and training, etc. (see permit). All personnel on the construction site who will be in a position to affect or be affected by the SWMP shall be trained prior to beginning work. These individuals will be given general orientation information regarding the project and SWMP, shown where the SWMP is physically located, the SWMP will be explained to them and available for their review, and the enforcement policy will be reviewed. Throughout the construction, as a part of a weekly safety meeting, the SWMP will be reviewed with all attendees and any incidents discussed. All attendees shall be logged. 14 APPENDIX Appendix A – BMP Details Appendix B – Vicinity Map, Phasing Plan, and Drainage & Erosion Control Plans Appendix C – Construction Sequence Appendix D – Erosion Control Escrow Calculation Appendix E – Soil Information Appendix A APPENDIX A – BMP DETAILS CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD EROSION CONTROL DETAILS 10/15/19 N/A N/A JTC JTC 18-1000-00 ---- 102 112 CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD EROSION CONTROL DETAILS 10/15/19 N/A N/A JTC JTC 18-1000-00 ---- 103 112 Appendix B APPENDIX B – VICINITY MAP AND DRAINAGE & EROSION CONTROL PLANS SITE Vicinity Map PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #43-97 ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF THE INTERSECTION OF LEMAY AVENUE. AND CONIFER STREET ELEV= 4960.11 CITY OF FORT COLLINS BENCHMARK #12-07 SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH LEMAY AVENUE ELEV= 4947.86 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED = 4960.11 (NAVD88) - 3.17 NGVD UNADJUSTED = 4947.81 (NAVD88) - 3.18 NTS LAKE CANAL DITCH DRY CREEK LAKE CANAL DITCH N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD LANDMARK WAY N. LEMAY AVENUE SCHLAGEL STREET Pond B3 Pond A2 Pond B1 Pond A1 Pond D Pond C Pond B2 BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 0 100' 100 50 100 200 SCALE: 1" = N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU AE AG AH AG AE AH AF LAKE CANAL DITCH MATCHLINE SEE SHEET 14 MATCHLINE SEE SHEET 13 N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD LANDMARK WAY Tract F (Drainage, Utility, & Access Easement) Tract A (Drainage, Utility, & Access Easement) SCHLAGEL STREET 4956.38 FEET 4956.38 FEET STA: 139+11 STA: 139+11 4954.08 FEET STA: 127+80 4954.08 FEET STA: 127+80 4952.98 FEET STA: 122+37 4951.84 FEET STA: 118+01 4951.84 FEET STA: 118+01 Block 2 Block 1 Block 3 Block 7 Block 6 Block 5 Block 8 Block 14 Block 22 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 AH AI AI AJ AJ AK AI AH LAKE CANAL DITCH DRY CREEK E. SUNIGA ROAD MATCHLINE SEE SHEET 12 MATCHLINE SEE SHEET 14 STEELEY DRIVE REDWOOD STREET Tract S (Drainage, Utility, & Access Easement) Tract N (Drainage, Utility, & Access Easement) Tract U (Drainage, Utility, & Access Easement) 4956.38 FEET STA: 139+11 4960.48 FEET STA: 144+91 4960.48 FEET STA: 144+91 4960.77 FEET STA: 147+32 4961.25 FEET STA: 149+48 4956.38 FEET STA: 139+11 A A B B Block 21 Lot 1 Lot 1 Lot 2 Lot 3 Lot 4 Block 20 Pond C Tract T (Drainage, Utility, & Access Easement) MANGOLD LN BIRDWHISTLE LN MANGOLD LN SCHLAGEL STREET Bldg 2b Bldg 1b Bldg 14a AE AF AG E. SUNIGA ROAD MATCHLINE SEE SHEET 12 MATCHLINE SEE SHEET 13 LANDMARK WAY N. LEMAY AVENUE RAIN GARDEN D1 Tract W (Drainage, Utility, & Access Easement) Tract T (Drainage, Utility, & Access Easement) Tract H (Drainage, Utility, & Access Easement) Tract V (Drainage, Utility, & Access Easement) 4952.98 FEET STA: 122+37 4951.84 FEET STA: 118+01 FUTURE SUNIGA ROAD Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 20 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Block 16 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 17 Lot 1 N. LEMAY AVENUE N. LEMAY AVENUE REDWOOD STREET FUTURE SUNIGA ROAD E. SUNIGA ROAD POTENTIAL STOCKPILE AREA 0 100' 100 50 100 200 SCALE: 1" = N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # N. LEMAY AVENUE N. LEMAY AVENUE REDWOOD STREET FUTURE SUNIGA ROAD E. SUNIGA ROAD Pond B3 Pond A2 Pond B1 Pond A1 Pond D Pond C Pond B2 POTENTIAL STOCKPILE AREA NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD EROSION & SEDIMENTATION CONTROL PLANS PHASE 2 - INFRASTRUCTURE 10/15/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 16 112 PHASE 2 - INFRASTRUCTURE PHASE NOTES 1. CONTRACTOR SHALL GRADE AND INSTALL SEDIMENT BASINS BEFORE PROCEEDING WITH ANY PHASE 2 INFRASTRUCTURE CONSTRUCTION ACTIVITIES. 2. DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION, TEMPORARY SEEDING AND MULCHING. 3. ONSITE & OFFSITE INLET PROTECTIONS SHALL BE COMPLETED PROTECTED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. INFILTRATION GALLERIES TO BE CONSTRUCTED CONCURRENT WITH STORM SYSTEM INFRASTRUCTURE. OUTLET PIPE IN MODIFIED TYPE D OUTLET STRUCTURE TO THE GALLERIES SHALL BE TEMPORARILY BLOCKED UNTIL SITE IS STABILIZED. CONSTRUCT TEMPORARY SEDIMENT BASIN AROUND OUTLET STRUCTURE TO PROTECT FROM SEDIMENT LOADING. SEE DETAIL SHEET 109. 5. RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND GROWING MEDIA. 6. CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE CONSTUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER MANAGEMENT PLAN. E. SUNIGA ROAD N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD STEELEY DRIVE LANDMARK WAY N. LEMAY AVENUE REDWOOD STREET SCHLAGEL STREET FUTURE SUNIGA ROAD E. SUNIGA ROAD Pond B3 Pond A2 Pond B1 Pond A1 Pond D Pond C Pond B2 POTENTIAL STOCKPILE AREA ag NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD EROSION & SEDIMENTATION CONTROL PLANS PHASE 3 - VERTICAL CONSTRUCTION 10/15/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 17 112 PHASE 3 - VERTICAL CONSTRUCTION PHASE NOTES 1. DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO INLET PROTECTION, SEDIMENT BASINS, PROTECTION, AND TEMPORARY SEEDING. 2. ANY COMMISSIONED STORM SEWER SYSTEM SHALL INLET AND OUTLET PROTECTION INSTALLED FOR ALL PHASE 3 OPERATIONS. 3. INLET PROTECTION SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION. 5. PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED LANDSCAPING AS APPROVED BY THE CITY OF FORT COLLINS E. SUNIGA ROAD N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD STEELEY DRIVE LANDMARK WAY N. LEMAY AVENUE REDWOOD STREET SCHLAGEL STREET FUTURE SUNIGA ROAD E. SUNIGA ROAD Pond B3 Pond A2 Pond B1 Pond A1 Pond D Pond C Pond B2 (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) Appendix C APPENDIX C – CONSTRUCTION SEQUENCE (Construction Phases) Mobilization Demolition Grading Utilities Installation Flat work Installation Vertical Installation Landscape Demobilization Best Management Practices (BMPs) Structural "Installation" Silt Fence Barriers* Contour Furrows (Ripping / Disking) Sediment Trap / Filter* Vehicle Tracking Pad* Flow Barriers (Wattles)* Inlet protection* Any prior inlets that could use protecting Rock Bags* Any prior inlets that could use protecting Terracing Rip Rap Collecting Asphalt / Concrete Saw Cutting Waste *All BMPs to be Removed once Construction is Complete, with the exception of silt fencing, which shall remain in place until seeded areas are established. Vegetative Temporary Seeding Planting Any time the site will sit dorment longer than 30 Days. Mulching/Sealant Any time the site will sit dorment longer than 30 Days. Permanent Seeding Planting Sod Installation Rolled Products : Netting/Blankets/Mats Any time the site will sit dorment longer than 30 Days. See additional sequencing details on Erosion & Sedimentation Control Plans Appendix D APPENDIX D – EROSION CONTROL ESCROW CALCULATION 8/28/2019 Project: Disturbed Acres: 51.20 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F. 4500 $2.50 $11,250.00 each 40 $150.00 $6,000.00 L.F. 1200 $2.00 $2,400.00 each 2 $500.00 $1,000.00 each 27 $300.00 $8,100.00 each 6 $800.00 $4,800.00 LS 1 $7,500.00 $7,500.00 Sub-Total: $41,050.00 1.5 x Sub-Total: $61,575.00 Amount of security: $61,575.00 AC 51.2 $2,000.00 $102,400.00 Sub-Total: $102,400.00 1.5 x Sub-Total: $153,600.00 Amount to Re-seed: $153,600.00 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $153,600.00 Miniumum Escrow Amount Northfield Subdivision - PHASE 1 Seeding “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Rock Sock Vehicle Tracking Control Pad Final Escrow Amount (Maximum between BMP, Reseeding and Minimum Escrow) Outlet Protection Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence Inlet Protection Street Sweeping and Cleaning Reseeding Amount Sediment Control Log 8/28/2019 11:12 AM G:\Projects\18-1000-00 Northfield\03 Design Documents\Drainage\EC Report\Northfield Erosion Control Escrow (2019-6-25).xls 8/28/2019 Project: Disturbed Acres: 6.80 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F. 1000 $2.50 $2,500.00 each 30 $150.00 $4,500.00 L.F. 500 $2.00 $1,000.00 each 1 $500.00 $500.00 each 10 $300.00 $3,000.00 each 2 $800.00 $1,600.00 LS 1 $2,500.00 $2,500.00 Sub-Total: $15,600.00 1.5 x Sub-Total: $23,400.00 Amount of security: $23,400.00 AC 6.8 $2,000.00 $13,600.00 Sub-Total: $13,600.00 1.5 x Sub-Total: $20,400.00 Amount to Re-seed: $20,400.00 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $23,400.00 Seeding Miniumum Escrow Amount Final Escrow Amount (Maximum between BMP, Reseeding and Minimum Escrow) “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Vehicle Tracking Control Pad Inlet Protection Outlet Protection Street Sweeping and Cleaning Reseeding Amount Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins Northfield Subdivision - PHASE 2 BMP Amount Silt Fence Rock Sock Sediment Control Log 8/28/2019 11:12 AM G:\Projects\18-1000-00 Northfield\03 Design Documents\Drainage\EC Report\Northfield Erosion Control Escrow (2019-6-25).xls Appendix E APPENDIX E – SOIL INFORMATION Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 1 of 4 4494130 4494220 4494310 4494400 4494490 4494580 4494670 4494130 4494220 4494310 4494400 4494490 4494580 4494670 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 40° 36' 11'' N 105° 4' 2'' W 40° 36' 11'' N 105° 3' 23'' W 40° 35' 52'' N 105° 4' 2'' W 40° 35' 52'' N 105° 3' 23'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,140 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 64 Loveland clay loam, 0 to 1 percent slopes C 11.9 20.9% 73 Nunn clay loam, 0 to 1 percent slopes C 16.6 29.2% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 28.3 49.9% Totals for Area of Interest 56.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 4 of 4 K Factor, Whole Soil—Larimer County Area, Colorado (Northfield) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2019 Page 1 of 3 4494130 4494220 4494310 4494400 4494490 4494580 4494670 4494130 4494220 4494310 4494400 4494490 4494580 4494670 494340 494430 494520 494610 494700 494790 494880 494970 495060 495150 494340 494430 494520 494610 494700 494790 494880 494970 495060 495150 40° 36' 10'' N 105° 4' 2'' W 40° 36' 10'' N 105° 3' 24'' W 40° 35' 52'' N 105° 4' 2'' W 40° 35' 52'' N 105° 3' 24'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:4,090 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons .02 .05 .10 .15 .17 .20 .24 .28 .32 .37 .43 .49 .55 .64 Not rated or not available Soil Rating Lines .02 .05 .10 .15 .17 .20 .24 .28 .32 .37 .43 .49 .55 .64 Not rated or not available Soil Rating Points .02 .05 .10 .15 .17 .20 .24 .28 .32 .37 .43 .49 .55 .64 Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads K Factor, Whole Soil Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 64 Loveland clay loam, 0 to 1 percent slopes .20 11.3 20.2% 73 Nunn clay loam, 0 to 1 percent slopes .32 16.8 30.0% 76 Nunn clay loam, wet, 1 to 3 percent slopes .24 27.7 49.7% Totals for Area of Interest 55.7 100.0% Description Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Layer Options (Horizon Aggregation Method): Surface Layer (Not applicable) K Factor, Whole Soil—Larimer County Area, Colorado Northfield Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2019 Page 3 of 3 Wind Erodibility Group—Larimer County Area, Colorado (Northfield) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2019 Page 1 of 3 4494130 4494220 4494310 4494400 4494490 4494580 4494670 4494130 4494220 4494310 4494400 4494490 4494580 4494670 494340 494430 494520 494610 494700 494790 494880 494970 495060 495150 494340 494430 494520 494610 494700 494790 494880 494970 495060 495150 40° 36' 10'' N 105° 4' 2'' W 40° 36' 10'' N 105° 3' 24'' W 40° 35' 52'' N 105° 4' 2'' W 40° 35' 52'' N 105° 3' 24'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:4,090 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 1 2 3 4 4L 5 6 7 8 Not rated or not available Soil Rating Lines 1 2 3 4 4L 5 6 7 8 Not rated or not available Soil Rating Points 1 2 3 4 4L 5 6 7 8 Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Wind Erodibility Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 64 Loveland clay loam, 0 to 1 percent slopes 6 11.3 20.2% 73 Nunn clay loam, 0 to 1 percent slopes 6 16.8 30.0% 76 Nunn clay loam, wet, 1 to 3 percent slopes 6 27.7 49.7% Totals for Area of Interest 55.7 100.0% Description A wind erodibility group (WEG) consists of soils that have similar properties affecting their susceptibility to wind erosion in cultivated areas. The soils assigned to group 1 are the most susceptible to wind erosion, and those assigned to group 8 are the least susceptible. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Lower Wind Erodibility Group—Larimer County Area, Colorado Northfield Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2019 Page 3 of 3 Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 13, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Wind Erodibility Group—Larimer County Area, Colorado (Northfield) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2019 Page 2 of 3 Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 13, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. K Factor, Whole Soil—Larimer County Area, Colorado (Northfield) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2019 Page 2 of 3 of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 12, Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 2 of 4 (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) POTENTIAL STOCKPILE AREA (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) (Remove) NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD EROSION & SEDIMENTATION CONTROL PLANS PHASE 4 - PERMANENT BMP & FINAL STABILIZATION 10/15/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 18 112 PHASE 4 - PERMANENT BMP AND FINAL STABILIZATION NOTES 1. LOTS AND BLOCKS ANTICIPATING CONSTRUCTION MAY UTILIZE SLOPE PROTECTION IN LIEU OF TEMPORARY SEEDING AND MULCHING AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 2. INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 3. CONTRACTOR SHALL REMOVE ALL TEMPORARY BMPS PRIOR TO FINAL DEMOBILIZATION OR AS DIRECTED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION. 5. PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED LANDSCAPING AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 6. CONTRACTOR TO INSTALL PROPOSED PERMANENT OUTLET PROTECTION WHEN FINALIZING STORM SEWER CONSTRUCTION WHICH MAY HAVE OCCURRED IN EARLIER PHASES. 7. CONTRACTOR TO CLEAN AND LEGALLY DISPOSE OF ALL SEDIMENT COLLECTED ONSITE DURING CONSTRUCTION PRIOR TO FINAL ACCEPTANCE. 8. PROVIDE AND MAINTAIN ACCESS TO THE NORTHERN SCHLAGEL PROPERTIES THROUGHOUT ALL OF CONSTRUCTION. 0 100' 100 50 100 200 SCALE: 1" = N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA ROUGH CUT STREET CONSTRUCTION SEEDING & MULCHING LIMITS OF DISTRUBANCE COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3. CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT AND EROSION CONTROL REPORT. 9. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 10. PROVIDE AND MAINTAIN ADEQUATE ACCESS TO THE NORTHERN SCHLAGEL PROPERTIES THROUGHOUT ALL OF CONSTRUCTION. EROSION CONTROL INSPECTOR. 6. PROVIDE AND MAINTAIN ACCESS TO THE NORTHERN SCHLAGEL PROPERTIES THROUGHOUT ALL OF CONSTRUCTION. 0 100' 100 50 100 200 SCALE: 1" = N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA ROUGH CUT STREET CONSTRUCTION SEEDING & MULCHING LIMITS OF DISTRUBANCE COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3. CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT AND EROSION CONTROL REPORT. 9. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 10. PROVIDE AND MAINTAIN ADEQUATE ACCESS TO THE NORTHERN SCHLAGEL PROPERTIES THROUGHOUT ALL OF CONSTRUCTION. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 0 100' 100 50 100 200 SCALE: 1" = N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA ROUGH CUT STREET CONSTRUCTION SEEDING & MULCHING LIMITS OF DISTRUBANCE COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3. CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT AND EROSION CONTROL REPORT. 9. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 10. PROVIDE AND MAINTAIN ADEQUATE ACCESS TO THE NORTHERN SCHLAGEL PROPERTIES THROUGHOUT ALL OF CONSTRUCTION. SCALE (V) NORTHFIELD EROSION & SEDIMENTATION CONTROL PLANS PHASE 1 - GRADING 10/15/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 15 112 PHASE 1 - GRADING PHASE NOTES 1. THIS PLAN IS A LIVING DOCUMENT THAT MAY CHANGE AS WORK PROGRESSES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING THESE EROSION CONTROL PLANS AS NEEDED DURING CONSTRUCTION ACTIVITIES TO REFLECT ACTUAL BMPS USED ONSITE, REASONS FOR CHANGES AND ANY DISTURBED AREAS. 2. DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION AND TEMPORARY SEEDING. 3. THE CONTRACTOR MAY USE SUCH BMPS AS SILT FENCE OR COMPACTED EARTH BERM AS FORMAL CONSTRUCTION MARKER PERIMETER CONTROL AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. OFFSITE INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 5. ALL PERIMETER CONTROL BMPS SHALL INSTALLED IN PHASE 1. CONTRACTOR SHALL NOT PROCEED WITH CONSTRUCTION ACTIVITIES UNTIL ALL PHASE 1 BMPS ARE INSTALLED, INSPECTED, AND APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 6. CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE CONSTUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 7. CONTRACTOR MAY INSTALL STOCKPILE AREA AS DEPICTED IN THE PLANS. ALL STOCKPILED MATERIAL MUST UTILIZE PERIMETER SILT PROTECTION MEASURES REGARDLESS OF PHASE OR LOCATION. DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA ROUGH CUT STREET CONSTRUCTION SEEDING & MULCHING LIMITS OF DISTRUBANCE COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3. CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT AND EROSION CONTROL REPORT. 9. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 10. PROVIDE AND MAINTAIN ADEQUATE ACCESS TO THE NORTHERN SCHLAGEL PROPERTIES THROUGHOUT ALL OF CONSTRUCTION. Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 15 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 18 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Block 19 Pond A2 Pond A1 Pond B1 Pond D Pond D RAIN GARDEN B1 4954.08 FEET STA: 127+80 BIRDWHISTLE LN BOLDOR LN MANGOLD LN CATHERINE LN BIRDWHISTLE LN EMMALENE LN BASSANO LN Bldg 10a Bldg 11a Bldg 12a Bldg 1d Bldg 2d Bldg 3d Bldg 4d Bldg 5d Bldg 6d Bldg 2c Bldg 1c Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c Bldg 9c Bldg 7c Bldg 13a KEY MAP NTS N W E S NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD GRADING & DRAINAGE PLAN 10/15/19 1" = 50' N/A KRB JTC 18-1000-00 ---- 14 112 CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date 0 50' 50 25 50 100 SCALE: 1" = N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R AH NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND GROWING MEDIA. 9. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT. 10. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 11. REFER TO EROSION & SEDIMENTATION CONTROL PHASING PLANS SHEETS 15 - 18 FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THIS DRAINAGE FACILITY WITH SEDIMENT DURING CONSTRUCTION. 12. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT. 13. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL. FLOODPLAIN NOTES 1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019. 2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY: 2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN 2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN. 3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE). COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) POND SPILL LOCATION (REFER TO DRAINAGE REPORT) Bldg 4a Bldg 3a Bldg 1a Bldg 6a Bldg 7a Bldg 8a Bldg 9a Bldg 1d Bldg 2a Bldg 5a KEY MAP NTS N W E S REGIONAL TRAIL SECTION A-A 4950 4955 4960 4965 4970 4950 4955 4960 4965 4970 -0+25 0+00 0+50 1+00 1+25 REGIONAL TRAIL SECTION B-B HORIZ. SCALE: 1"=50' VERT. SCALE: 1"=10' 4950 4955 4960 4965 4970 4950 4955 4960 4965 4970 -0+25 0+00 0+50 1+00 1+25 NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD GRADING & DRAINAGE PLAN 10/15/19 1" = 50' N/A KRB JTC 18-1000-00 ---- 13 112 0 50' 50 25 50 100 SCALE: 1" = CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R N W E S NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND GROWING MEDIA. 9. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT. 10. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 11. REFER TO EROSION & SEDIMENTATION CONTROL PHASING PLANS SHEETS 15 - 18 FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING. 12. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT. 13. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL. 14. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. FLOODPLAIN NOTES 1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019. 2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY: 2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN 2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN. 3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE). COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. AH BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) POND SPILL LOCATION (REFER TO DRAINAGE REPORT) Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 4 Block 9 Block 10 Block 11 L ot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 12 Block 13 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Pond B3 Pond A2 Pond B2 Tract O (Drainage, Utility, & Access Easement) Tract R (Drainage, Utility, & Access Easement) ABBOTT LN ABBOTT LN COONTS LN BOLDOR LN CATHERINE LN COONTS LN STEARLEY LN BASSANO LN CATHERINE LN ABBOTT LN EMMALENE LN EMMALENE LN BASSANO LN Bldg 5b Bldg 4b Bldg 3b Bldg 2b Bldg 15a Bldg 16a Bldg 17a Bldg 2c Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c Bldg 9c Bldg 12c Bldg 13c Bldg 14c Bldg 15c Bldg 10c Bldg 11c Bldg 7d Bldg 19d Bldg 20d Bldg 15d Bldg 18d Bldg 16d Bldg 17d Bldg 8d Bldg 9d Bldg 10d Bldg 12d Bldg 11d Bldg 13d Bldg 14d COMMUNITY CLUBHOUSE KEY MAP NTS N W E S NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD GRADING & DRAINAGE PLAN 10/15/19 1" = 50' N/A KRB JTC 18-1000-00 ---- 12 112 0 50' 50 25 50 100 SCALE: 1" = CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date AH BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND GROWING MEDIA. 9. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT. 10. REFERENCE SHEETS 102 - 103 FOR EROSION CONTROL DETAILS. 11. REFER TO EROSION & SEDIMENTATION CONTROL PHASING PLANS SHEETS 15 - 18 FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THIS DRAINAGE FACILITY WITH SEDIMENT DURING CONSTRUCTION. 12. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT. 13. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL. 14. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R FLOODPLAIN NOTES 1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019. 2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY: 2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN 2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN. 3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE). COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. POND SPILL LOCATION (REFER TO DRAINAGE REPORT) DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD OVERALL GRADING & DRAINAGE PLAN 10/15/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 11 112 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO)