HomeMy WebLinkAboutFOX GROVE PHASE 2 - PDP190002 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 2 Recent peak hour traffic volumes at the Mulberry/Carriage-Camino del Mundo intersection are shown in Figure 3. The traffic counts were obtained in January 2019. Raw traffic data is provided in Appendix B. The Mulberry/Carriage-Camino del Mundo intersection was evaluated and the peak hour operation is displayed in Table 1. Calculation forms are provided in Appendix C. The Mulberry/Carriage-Camino del Mundo intersection meets the Fort Collins operational criteria with the existing control and geometry. The intersections were evaluated using techniques provided in the Highway Capacity Manual, 6th Edition, ITE (2016 HCM). A description of level of service from signalized intersections from the 2016 HCM and a table showing the Fort Collins Motor Vehicle LOS Standards (intersections) are also provided in Appendix C. Acceptable operation at signalized intersections during the peak hours is defined as level of service E or better for each movement and leg, and level of service D or better overall. Signal timing was obtained in the field. Since the minor street traffic volumes are so low, it was difficult to determine the exact signal timing. In addition to this, the Mulberry/Carriage-Camino del Mundo intersection may be coordinated with the Mulberry/East Frontage Road intersection. Therefore, the minor street phases and the eastbound/westbound left-turn phase were set at 10 seconds. The amount of green time for Mulberry Street was dependent upon keeping the v/c ratio under 1.0. It was determined that an overall signal timing of 90 seconds was adequate for the Mulberry/Carriage-Camino del Mundo intersection. PROPOSAL AND TRIP GENERATION The site plan for the proposed Fox Grove, Phase 2 development is shown in Figure 4. The Fox Grove, Phase 2 development will consist of 47 single family dwelling units. Access to the site will be via Fox Grove Drive to Carriage Parkway. The trip generation was calculated using the reference document Trip Generation, 10th Edition, ITE. Table 2 shows the expected trip generation on a daily and peak hour basis for full development of Fox Grove, Phase 2. The trip generation for Fox Grove, Phase 2 resulted in: 444 daily trip ends, 35 morning peak hour trip ends, and 46 afternoon peak hour trip ends. TRIP DISTRIBUTION/SITE TRAFFIC ASSIGMENT Given the street network in the area and the site location in Fort Collins, it is expected that the trip distribution will be as depicted in Figure 5. The trip distribution was agreed to in the scoping discussions. Figure 6 shows the site generated peak hour traffic at the Mulberry/Carriage-Camino del Mundo intersection. BACKGROUND AND TOTAL TRAFFIC FORECASTS Figure 7 shows the short range (2024) background traffic forecasts. The short range background traffic was developed by factoring the volumes on Mulberry Street by the adjusted CDOT 20-year factor (1.53) of 1.1325. The background traffic growth was agreed DELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 3 to in base assumptions packet. In addition to this, the traffic related to the remaining dwelling units in the Fox Grove, Phase 1 development was added to the background forecasts. Figure 8 shows the short range (2024) total (site assignment plus background) peak hour traffic at the Mulberry/ Carriage-Camino del Mundo intersection. AUXILIARY LANE EVAULATION The existing intersection geometry at the Mulberry/Carriage-Camino del Mundo intersection will be adequate and can remain. OPERATIONS ANALYSIS The operations analyses were performed at the Mulberry/Carriage-Camino del Mundo intersection. The operations analyses were conducted for the short range future reflecting a 2024 condition. Using the traffic volumes shown in Figure 7, the Mulberry/Carriage-Camino del Mundo intersection will operate in the short range background traffic condition as indicated in Table 3. Calculation forms are provided in Appendix D. The Mulberry/Carriage-Camino del Mundo intersection will meet the Fort Collins operational criteria during the peak hours. Table 4 shows the short range (2024) total peak hour operation at the Mulberry/ Carriage-Camino del Mundo intersection using the volumes in Figure 8. The Mulberry/ Carriage-Camino del Mundo intersection will meet the Fort Collins operational criteria during the peak hours. Calculation forms are provided in Appendix E. PEDESTRIAN LEVEL OF SERVICE Appendix F shows a map of the area that is within 1320 feet of Fox Grove, Phase 2. The land uses on the west side of Interstate 25 are not considered destinations since there is no possible pedestrian connection except using Mulberry Street. As shown in Appendix F, two potential pedestrian destinations within 1320 feet of the Fox Grove, Phase 2 site were identified: 1) Fox Grove, Phase 1/existing residential; 2) the residential neighborhood to the northeast of the site (Sunflower Active Adult Community); and 3) the commercial area to the north of the site. Appendix F contains a graphic depicting the pedestrian influence area and these three pedestrian destinations. A pedestrian level of service worksheet is also provided in Appendix F. There are sidewalks adjacent to all developed properties. The minimum level of service for “other” is C for all categories. The Pedestrian LOS will be achieved in the short range (2024) future, except for the directness category to the Sunflower Active Adult Community, and the directness and continuity categories for the commercial area to the north of the site. Since the Sunflower Active Adult Community is gated and has fencing around the perimeter of the property, it is unlikely that a pedestrian DELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 4 connection will be provided. While the commercial area is within the 1320 feet, it is not likely that sidewalks would be built through land not under control of this developer. In addition to this, sidewalks are not complete within the commercial area itself. There is nothing that can be done to mitigate these issues. BICYCLE LEVEL OF SERVICE There are no designated bicycle lanes along Mulberry Street. Carriage Parkway is wide enough to have bicycle lanes, although not striped as such. Local streets are not required to have bicycle lanes. The base level of service is B for the bicycle destinations. It is concluded that level of service B is achieved. TRANSIT LEVEL OF SERVICE Currently this area of Fort Collins is not served by Transfort. SUMMARY It is concluded that the Mulberry/Carriage-Camino del Mundo intersection will meet the Fort Collins operational criteria. This development will generate approximately 444 daily trip ends, 35 morning peak hour trip ends, and 46 afternoon peak hour trip ends. The existing intersection geometry at the Mulberry/Carriage-Camino del Mundo intersection will be adequate. If necessary/appropriate, Carriage Parkway can be striped as a collector street per the Larimer County Urban Area Street Standards. AIRPARK DOWNTOWN FORT COLLINS BURLINGTON NORTHERN RAILRO 25 Mulberry 14 Carriage Fox Grove Camino del Mundo SCALE: 1"=2000' SITE LOCATION Figure 1 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 5 EXISTING INTERSECTION GEOMETRY Figure 2 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 6 Mulberry (SH14) Carriage Camino del Mundo - Denotes Lane AM/PM RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 7 Mulberry (SH14) Carriage Camino del Mundo 94/52 1/2 6/8 34/10 1/1 4/2 11/33 437/860 23/53 0/1 892/604 3/6 DELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 8 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Mulberry/Carriage-Camino del Mundo (signal) EB LT B A EB T A B EB RT A A EB APPROACH A B WB LT A B WB T C B WB RT A A WB APPROACH C B NB LT D D NB T/RT D D NB APPROACH D D SB LT C C SB T/RT D D SB APPROACH D D OVERALL B B SCALE: 1"=200' SITE PLAN Figure 4 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 9 DELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 10 TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 210 Single Family Detached 47 D.U. 9.44 444 0.19 9 0.55 26 0.62 29 0.37 17 Mulberry 14 Carriage Fox Grove 90% 10% SCALE: 1"=500' TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 11 AM/PM SITE GENERATED PEAK HOUR TRAFFIC Figure 6 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 12 Mulberry (SH14) Carriage Camino del Mundo 1/3 8/26 23/15 3/2 AM/PM SHORT RANGE (2024) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 13 Mulberry (SH14) Carriage Camino del Mundo 126/74 1/2 10/10 34/10 1/1 4/2 11/33 495/974 35/90 0/1 1010/684 4/10 AM/PM SHORT RANGE (2024) TOTAL PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Page 14 Mulberry (SH14) Carriage Camino del Mundo 149/89 1/2 13/12 34/10 1/1 4/2 11/33 495/974 43/116 0/1 1010/684 5/13 DELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 15 TABLE 3 Short Range (2024) Background Peak Hour Operation Intersection Movement Level of Service AM PM Mulberry/Carriage-Camino del Mundo (signal) EB LT C A EB T B C EB RT A A EB APPROACH B C WB LT A B WB T D B WB RT A A WB APPROACH D B NB LT D D NB T/RT D D NB APPROACH D D SB LT C C SB T/RT D D SB APPROACH D D OVERALL C C DELICH Fox Grove, Phase 2 TIS, February 2019 ASSOCIATES Page 16 TABLE 4 Short Range (2024) Total Peak Hour Operation Intersection Movement Level of Service AM PM Mulberry/Carriage-Camino del Mundo (signal) EB LT C A EB T B C EB RT A A EB APPROACH B C WB LT A B WB T D B WB RT A A WB APPROACH D B NB LT D D NB T/RT D D NB APPROACH D D SB LT C C SB T/RT D D SB APPROACH D D OVERALL C C APPENDIX A APPENDIX B DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 1/30/2019 Observer: Vickie Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Mulberry (SH14)/Carriage-Camino del Mundo S = straight L = left turn Time Northbound: Carriage Southbound: Camino del Mundo: Total Eastbound: Mulberry Westbound: Mulberry Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 23 0 2 25 0 0 6 6 31 1 135 6 142 2 220 0 222 364 395 7:45 31 1 3 35 3 1 14 18 53 2 109 5 116 1 268 0 269 385 438 8:00 17 0 0 17 0 0 11 11 28 4 102 9 115 0 223 0 223 338 366 8:15 23 0 1 24 1 0 3 4 28 4 91 3 98 0 181 0 181 279 307 7:30-8:30 94 1 6 101 4 1 34 39 140 11 437 23 471 3 892 0 895 1366 1506 PHF 0.76 0.25 0.5 0.72 0.33 0.25 0.61 0.54 0.69 0.81 0.64 0.83 0.38 0.83 n/a 0.83 0.86 4:30 5 0 0 5 0 1 4 5 10 5 178 13 196 3 126 0 129 325 335 4:45 15 2 3 20 1 0 4 5 25 11 216 11 238 2 138 0 140 378 403 5:00 15 0 5 20 1 0 1 2 22 8 220 13 241 1 182 1 184 425 447 5:15 17 0 0 17 0 0 1 1 18 9 246 16 271 0 158 0 158 429 447 4:30-5:30 52 2 8 62 2 1 10 13 75 33 860 53 946 6 604 1 611 1557 1632 PHF 0.76 0.25 0.4 0.78 0.5 0.25 0.63 0.65 0.75 0.87 0.83 0.87 0.5 0.83 0.25 0.83 0.91 APPENDIX C HCM 6th Signalized Intersection Summary Recent AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates recent am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 11 437 23 3 892 0 94 164134 Future Volume (veh/h) 11 437 23 3 892 0 94 164134 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 13 508 0 3 1037 0 109 10510 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 222222222222 Cap, veh/h 295 1185 1004 641 1185 1004 277 104 0 277 104 0 Arrive On Green 0.07 0.63 0.00 0.07 0.63 0.00 0.07 0.06 0.00 0.07 0.06 0.00 Sat Flow, veh/h 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Grp Volume(v), veh/h 13 508 0 3 1037 0 109 10510 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Q Serve(g_s), s 0.2 12.3 0.0 0.0 41.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.2 12.3 0.0 0.0 41.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 Lane Grp Cap(c), veh/h 295 1185 1004 641 1185 1004 277 104 0 277 104 0 V/C Ratio(X) 0.04 0.43 0.00 0.00 0.88 0.00 0.39 0.01 0.00 0.02 0.01 0.00 Avail Cap(c_a), veh/h 315 1185 1004 661 1185 1004 297 104 0 297 104 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 13.7 8.3 0.0 4.9 13.6 0.0 37.4 40.2 0.0 34.8 40.2 0.0 Incr Delay (d2), s/veh 0.1 1.1 0.0 0.0 9.2 0.0 0.9 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 4.1 0.0 0.0 15.5 0.0 2.3 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.7 9.4 0.0 4.9 22.8 0.0 38.3 40.2 0.0 34.9 40.2 0.0 LnGrp LOS BAAACADDACDA Approach Vol, veh/h 521 1040 110 6 Approach Delay, s/veh 9.5 22.7 38.4 35.8 Approach LOS A C D D Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 62.0 9.0 10.0 9.0 62.0 9.0 10.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 54.0 6.0 4.0 6.0 54.0 6.0 4.0 Max Q Clear Time (g_c+I1), s 2.0 14.3 2.0 2.0 2.2 43.1 2.0 2.0 Green Ext Time (p_c), s 0.0 3.0 0.1 0.0 0.0 5.4 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 19.7 HCM 6th LOS B Timing Report, Sorted By Phase Recent AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates recent am.syn Phase Number 12345678 Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize Yes Yes Yes Yes Recall Mode Min C-Max Min Min Min C-Max Min Min Maximum Split (s) 10 60 10 10 10 60 10 10 Maximum Split (%) 11.1% 66.7% 11.1% 11.1% 11.1% 66.7% 11.1% 11.1% Minimum Split (s) 9.5 22.5 9.5 10 9.5 22.5 9.5 10 Yellow Time (s) 34343434 All-Red Time (s) 12121212 Minimum Initial (s) 55545554 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 4 4 Flash Dont Walk (s) 11 11 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 12.5 22.5 2.5 82.5 12.5 22.5 2.5 82.5 End Time (s) 22.5 82.5 12.5 2.5 22.5 82.5 12.5 2.5 Yield/Force Off (s) 18.5 76.5 8.5 86.5 18.5 76.5 8.5 86.5 Yield/Force Off 170(s) 18.5 65.5 8.5 86.5 18.5 65.5 8.5 86.5 Local Start Time (s) 80 0 70 60 80 0 70 60 Local Yield (s) 86 54 76 64 86 54 76 64 Local Yield 170(s) 86 43 76 64 86 43 76 64 Intersection Summary Cycle Length 90 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 22.5 (25%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Splits and Phases: 3: Carriage/Camino del Mundo & Mulberry (SH14) Queues Recent AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates recent am.syn Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Lane Group Flow (vph) 13 508 27 3 1037 109 8 5 41 v/c Ratio 0.06 0.44 0.03 0.00 0.90 0.44 0.08 0.02 0.33 Control Delay 3.5 10.5 0.0 3.0 27.8 38.9 27.1 30.2 21.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.5 10.5 0.0 3.0 27.8 38.9 27.1 30.2 21.3 Queue Length 50th (ft) 2 136 0 0 459 54 1 2 1 Queue Length 95th (ft) 5 193 0 2 #730 97 14 11 30 Internal Link Dist (ft) 819 874 233 225 Turn Bay Length (ft) 150 225 100 60 25 Base Capacity (vph) 223 1153 1030 619 1150 253 96 253 126 Starvation Cap Reductn 000000000 Spillback Cap Reductn 000000000 Storage Cap Reductn 000000000 Reduced v/c Ratio 0.06 0.44 0.03 0.00 0.90 0.43 0.08 0.02 0.33 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary Recent PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates recent pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 33 860 53 6 604 1 52 282110 Future Volume (veh/h) 33 860 53 6 604 1 52 282110 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 945 0 7 664 0 57 20210 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 222222222222 Cap, veh/h 532 1185 1004 352 1185 1004 277 104 0 276 104 0 Arrive On Green 0.07 0.63 0.00 0.07 0.63 0.00 0.07 0.06 0.00 0.07 0.06 0.00 Sat Flow, veh/h 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Grp Volume(v), veh/h 36 945 0 7 664 0 57 20210 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Q Serve(g_s), s 0.6 33.7 0.0 0.1 18.2 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.6 33.7 0.0 0.1 18.2 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 Lane Grp Cap(c), veh/h 532 1185 1004 352 1185 1004 277 104 0 276 104 0 V/C Ratio(X) 0.07 0.80 0.00 0.02 0.56 0.00 0.21 0.02 0.00 0.01 0.01 0.00 Avail Cap(c_a), veh/h 551 1185 1004 372 1185 1004 297 104 0 296 104 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 6.1 12.2 0.0 10.5 9.4 0.0 36.2 40.2 0.0 34.8 40.2 0.0 Incr Delay (d2), s/veh 0.1 5.6 0.0 0.0 1.9 0.0 0.4 0.1 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 12.1 0.0 0.0 6.1 0.0 1.2 0.0 0.0 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 6.1 17.9 0.0 10.5 11.3 0.0 36.5 40.3 0.0 34.8 40.2 0.0 LnGrp LOS ABABBADDACDA Approach Vol, veh/h 981 671 59 3 Approach Delay, s/veh 17.4 11.3 36.7 36.6 Approach LOS B B D D Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 62.0 9.0 10.0 9.0 62.0 9.0 10.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 54.0 6.0 4.0 6.0 54.0 6.0 4.0 Max Q Clear Time (g_c+I1), s 2.1 35.7 2.0 2.0 2.6 20.2 2.0 2.1 Green Ext Time (p_c), s 0.0 6.3 0.0 0.0 0.0 4.3 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 15.7 HCM 6th LOS B Timing Report, Sorted By Phase Recent PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates recent pm.syn Phase Number 12345678 Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize Yes Yes Yes Yes Recall Mode Min C-Max Min Min Min C-Max Min Min Maximum Split (s) 10 60 10 10 10 60 10 10 Maximum Split (%) 11.1% 66.7% 11.1% 11.1% 11.1% 66.7% 11.1% 11.1% Minimum Split (s) 9.5 22.5 9.5 10 9.5 22.5 9.5 10 Yellow Time (s) 34343434 All-Red Time (s) 12121212 Minimum Initial (s) 55545554 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 4 4 Flash Dont Walk (s) 11 11 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 12.5 22.5 2.5 82.5 12.5 22.5 2.5 82.5 End Time (s) 22.5 82.5 12.5 2.5 22.5 82.5 12.5 2.5 Yield/Force Off (s) 18.5 76.5 8.5 86.5 18.5 76.5 8.5 86.5 Yield/Force Off 170(s) 18.5 65.5 8.5 86.5 18.5 65.5 8.5 86.5 Local Start Time (s) 80 0 70 60 80 0 70 60 Local Yield (s) 86 54 76 64 86 54 76 64 Local Yield 170(s) 86 43 76 64 86 43 76 64 Intersection Summary Cycle Length 90 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 22.5 (25%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Splits and Phases: 3: Carriage/Camino del Mundo & Mulberry (SH14) Queues Recent PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates recent pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 36 945 58 7 664 1 57 11 2 12 v/c Ratio 0.07 0.82 0.06 0.02 0.58 0.00 0.23 0.11 0.01 0.12 Control Delay 3.3 20.8 0.1 3.2 12.9 0.0 34.0 27.5 30.0 25.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.3 20.8 0.1 3.2 12.9 0.0 34.0 27.5 30.0 25.5 Queue Length 50th (ft) 4 374 0 1 204 0 28 1 1 1 Queue Length 95th (ft) 11 581 0 4 307 0 61 18 7 18 Internal Link Dist (ft) 819 874 233 225 Turn Bay Length (ft) 150 225 100 150 60 25 Base Capacity (vph) 496 1155 1032 293 1149 1027 253 99 253 99 Starvation Cap Reductn 0000000000 Spillback Cap Reductn 0000000000 Storage Cap Reductn 0000000000 Reduced v/c Ratio 0.07 0.82 0.06 0.02 0.58 0.00 0.23 0.11 0.01 0.12 Intersection Summary SIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 20 C > 20 and < 35 D > 35 and < 55 E > 55 and < 80 F > 80 Table 4-3 Fort Collins (GMA and City Limits) Motor Vehicle LOS Standards (Intersections) Overall Any Approach Leg Any Movement Signalized D1 E E2 Unsignalized E3 F4 Arterial/Arterial Collector/Collector Unsignalized D3 F4 Arterial/Collector Arterial/Local Collector/Local Local/Local Roundabout E3,5 E5,4 E5 1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable 2 Applicable with at least 5% of total entering volume 3 Use weighed average to identify overall delay 4 Mitigation may be required 5 Apply unsignalized delay value thresholds to determine LOS APPENDIX D HCM 6th Signalized Intersection Summary Short Bkgrd AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates sb am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 11 495 35 4 1010 0 126 1 10 4 1 34 Future Volume (veh/h) 11 495 35 4 1010 0 126 1 10 4 1 34 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 13 576 0 5 1174 0 147 10510 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 222222222222 Cap, veh/h 206 1185 1004 592 1185 1004 277 104 0 277 104 0 Arrive On Green 0.07 0.63 0.00 0.07 0.63 0.00 0.07 0.06 0.00 0.07 0.06 0.00 Sat Flow, veh/h 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Grp Volume(v), veh/h 13 576 0 5 1174 0 147 10510 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Q Serve(g_s), s 0.2 14.7 0.0 0.1 55.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.2 14.7 0.0 0.1 55.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 Lane Grp Cap(c), veh/h 206 1185 1004 592 1185 1004 277 104 0 277 104 0 V/C Ratio(X) 0.06 0.49 0.00 0.01 0.99 0.00 0.53 0.01 0.00 0.02 0.01 0.00 Avail Cap(c_a), veh/h 226 1185 1004 612 1185 1004 297 104 0 297 104 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 21.7 8.7 0.0 5.3 16.2 0.0 37.9 40.2 0.0 34.8 40.2 0.0 Incr Delay (d2), s/veh 0.1 1.4 0.0 0.0 24.1 0.0 1.6 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 4.9 0.0 0.0 24.9 0.0 3.1 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.9 10.2 0.0 5.3 40.4 0.0 39.5 40.2 0.0 34.9 40.2 0.0 LnGrp LOS C B A A D A D D A C D A Approach Vol, veh/h 589 1179 148 6 Approach Delay, s/veh 10.4 40.2 39.5 35.8 Approach LOS B D D D Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 62.0 9.0 10.0 9.0 62.0 9.0 10.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 54.0 6.0 4.0 6.0 54.0 6.0 4.0 Max Q Clear Time (g_c+I1), s 2.1 16.7 2.0 2.0 2.2 57.6 2.0 2.0 Green Ext Time (p_c), s 0.0 3.6 0.1 0.0 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 31.0 HCM 6th LOS C Timing Report, Sorted By Phase Short Bkgrd AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates sb am.syn Phase Number 12345678 Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize Yes Yes Yes Yes Recall Mode Min C-Max Min Min Min C-Max Min Min Maximum Split (s) 10 60 10 10 10 60 10 10 Maximum Split (%) 11.1% 66.7% 11.1% 11.1% 11.1% 66.7% 11.1% 11.1% Minimum Split (s) 9.5 22.5 9.5 10 9.5 22.5 9.5 10 Yellow Time (s) 34343434 All-Red Time (s) 12121212 Minimum Initial (s) 55545554 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 4 4 Flash Dont Walk (s) 11 11 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 12.5 22.5 2.5 82.5 12.5 22.5 2.5 82.5 End Time (s) 22.5 82.5 12.5 2.5 22.5 82.5 12.5 2.5 Yield/Force Off (s) 18.5 76.5 8.5 86.5 18.5 76.5 8.5 86.5 Yield/Force Off 170(s) 18.5 65.5 8.5 86.5 18.5 65.5 8.5 86.5 Local Start Time (s) 80 0 70 60 80 0 70 60 Local Yield (s) 86 54 76 64 86 54 76 64 Local Yield 170(s) 86 43 76 64 86 43 76 64 Intersection Summary Cycle Length 90 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 22.5 (25%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Splits and Phases: 3: Carriage/Camino del Mundo & Mulberry (SH14) Queues Short Bkgrd AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates sb am.syn Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Lane Group Flow (vph) 13 576 41 5 1174 147 13 5 41 v/c Ratio 0.06 0.50 0.04 0.01 1.02 0.59 0.13 0.02 0.33 Control Delay 3.5 11.5 0.1 3.0 51.6 44.3 24.8 30.0 21.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.5 11.5 0.1 3.0 51.6 44.3 24.8 30.0 21.3 Queue Length 50th (ft) 2 165 0 1 ~718 75 1 2 1 Queue Length 95th (ft) 5 230 0 3 #893 126 18 11 30 Internal Link Dist (ft) 819 874 233 225 Turn Bay Length (ft) 150 225 100 60 25 Base Capacity (vph) 223 1150 1028 563 1148 253 100 253 126 Starvation Cap Reductn 000000000 Spillback Cap Reductn 000000000 Storage Cap Reductn 000000000 Reduced v/c Ratio 0.06 0.50 0.04 0.01 1.02 0.58 0.13 0.02 0.33 Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary Short Bkgrd PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates sb pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 33 974 90 10 684 1 74 2 10 2 1 10 Future Volume (veh/h) 33 974 90 10 684 1 74 2 10 2 1 10 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 1070 43 11 752 0 81 20210 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 222222222222 Cap, veh/h 474 1185 1004 271 1185 1004 277 104 0 276 104 0 Arrive On Green 0.07 0.63 0.63 0.07 0.63 0.00 0.07 0.06 0.00 0.07 0.06 0.00 Sat Flow, veh/h 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Grp Volume(v), veh/h 36 1070 43 11 752 0 81 20210 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Q Serve(g_s), s 0.6 44.1 0.5 0.2 22.2 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.6 44.1 0.5 0.2 22.2 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 Lane Grp Cap(c), veh/h 474 1185 1004 271 1185 1004 277 104 0 276 104 0 V/C Ratio(X) 0.08 0.90 0.04 0.04 0.63 0.00 0.29 0.02 0.00 0.01 0.01 0.00 Avail Cap(c_a), veh/h 493 1185 1004 291 1185 1004 297 104 0 296 104 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 7.0 14.1 1.7 15.1 10.1 0.0 36.8 40.2 0.0 34.8 40.2 0.0 Incr Delay (d2), s/veh 0.1 11.3 0.1 0.1 2.6 0.0 0.6 0.1 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 17.1 0.3 0.1 7.6 0.0 1.7 0.0 0.0 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 7.1 25.4 1.7 15.2 12.7 0.0 37.4 40.3 0.0 34.8 40.2 0.0 LnGrp LOS A C ABBADDACDA Approach Vol, veh/h 1149 763 83 3 Approach Delay, s/veh 24.0 12.8 37.5 36.6 Approach LOS C B D D Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 62.0 9.0 10.0 9.0 62.0 9.0 10.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 54.0 6.0 4.0 6.0 54.0 6.0 4.0 Max Q Clear Time (g_c+I1), s 2.2 46.1 2.0 2.0 2.6 24.2 2.0 2.1 Green Ext Time (p_c), s 0.0 4.5 0.1 0.0 0.0 5.1 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 20.3 HCM 6th LOS C Timing Report, Sorted By Phase Short Bkgrd PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates sb pm.syn Phase Number 12345678 Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize Yes Yes Yes Yes Recall Mode Min C-Max Min Min Min C-Max Min Min Maximum Split (s) 10 60 10 10 10 60 10 10 Maximum Split (%) 11.1% 66.7% 11.1% 11.1% 11.1% 66.7% 11.1% 11.1% Minimum Split (s) 9.5 22.5 9.5 10 9.5 22.5 9.5 10 Yellow Time (s) 34343434 All-Red Time (s) 12121212 Minimum Initial (s) 55545554 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 4 4 Flash Dont Walk (s) 11 11 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 12.5 22.5 2.5 82.5 12.5 22.5 2.5 82.5 End Time (s) 22.5 82.5 12.5 2.5 22.5 82.5 12.5 2.5 Yield/Force Off (s) 18.5 76.5 8.5 86.5 18.5 76.5 8.5 86.5 Yield/Force Off 170(s) 18.5 65.5 8.5 86.5 18.5 65.5 8.5 86.5 Local Start Time (s) 80 0 70 60 80 0 70 60 Local Yield (s) 86 54 76 64 86 54 76 64 Local Yield 170(s) 86 43 76 64 86 43 76 64 Intersection Summary Cycle Length 90 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 22.5 (25%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Splits and Phases: 3: Carriage/Camino del Mundo & Mulberry (SH14) Queues Short Bkgrd PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates sb pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 36 1070 99 11 752 1 81 13 2 12 v/c Ratio 0.08 0.93 0.10 0.05 0.66 0.00 0.33 0.13 0.01 0.12 Control Delay 3.4 31.2 0.9 3.5 14.6 0.0 36.0 26.3 30.0 25.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.4 31.2 0.9 3.5 14.6 0.0 36.0 26.3 30.0 25.5 Queue Length 50th (ft) 4 493 0 1 250 0 40 1 1 1 Queue Length 95th (ft) 11 #836 10 5 377 0 81 20 7 18 Internal Link Dist (ft) 819 874 233 225 Turn Bay Length (ft) 150 225 100 150 60 25 Base Capacity (vph) 428 1152 1030 223 1148 1027 253 100 253 99 Starvation Cap Reductn 0000000000 Spillback Cap Reductn 0000000000 Storage Cap Reductn 0000000000 Reduced v/c Ratio 0.08 0.93 0.10 0.05 0.66 0.00 0.32 0.13 0.01 0.12 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. APPENDIX E HCM 6th Signalized Intersection Summary Short Total AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates st am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 11 495 43 5 1010 0 149 1 13 4 1 34 Future Volume (veh/h) 11 495 43 5 1010 0 149 1 13 4 1 34 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 13 576 0 6 1174 0 173 10510 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 222222222222 Cap, veh/h 206 1185 1004 592 1185 1004 277 104 0 277 104 0 Arrive On Green 0.07 0.63 0.00 0.07 0.63 0.00 0.07 0.06 0.00 0.07 0.06 0.00 Sat Flow, veh/h 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Grp Volume(v), veh/h 13 576 0 6 1174 0 173 10510 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Q Serve(g_s), s 0.2 14.7 0.0 0.1 55.6 0.0 0.2 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.2 14.7 0.0 0.1 55.6 0.0 0.2 0.0 0.0 0.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 Lane Grp Cap(c), veh/h 206 1185 1004 592 1185 1004 277 104 0 277 104 0 V/C Ratio(X) 0.06 0.49 0.00 0.01 0.99 0.00 0.63 0.01 0.00 0.02 0.01 0.00 Avail Cap(c_a), veh/h 226 1185 1004 612 1185 1004 297 104 0 297 104 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 21.7 8.7 0.0 5.3 16.2 0.0 38.1 40.2 0.0 34.8 40.2 0.0 Incr Delay (d2), s/veh 0.1 1.4 0.0 0.0 24.1 0.0 3.7 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 4.9 0.0 0.0 24.9 0.0 3.8 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.9 10.2 0.0 5.3 40.4 0.0 41.8 40.2 0.0 34.9 40.2 0.0 LnGrp LOS C B A A D A D D A C D A Approach Vol, veh/h 589 1180 174 6 Approach Delay, s/veh 10.4 40.2 41.8 35.8 Approach LOS B D D D Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 62.0 9.0 10.0 9.0 62.0 9.0 10.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 54.0 6.0 4.0 6.0 54.0 6.0 4.0 Max Q Clear Time (g_c+I1), s 2.1 16.7 2.2 2.0 2.2 57.6 2.0 2.0 Green Ext Time (p_c), s 0.0 3.6 0.2 0.0 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 31.3 HCM 6th LOS C Timing Report, Sorted By Phase Short Total AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates st am.syn Phase Number 12345678 Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize Yes Yes Yes Yes Recall Mode Min C-Max Min Min Min C-Max Min Min Maximum Split (s) 10 60 10 10 10 60 10 10 Maximum Split (%) 11.1% 66.7% 11.1% 11.1% 11.1% 66.7% 11.1% 11.1% Minimum Split (s) 9.5 22.5 9.5 10 9.5 22.5 9.5 10 Yellow Time (s) 34343434 All-Red Time (s) 12121212 Minimum Initial (s) 55545554 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 4 4 Flash Dont Walk (s) 11 11 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 12.5 22.5 2.5 82.5 12.5 22.5 2.5 82.5 End Time (s) 22.5 82.5 12.5 2.5 22.5 82.5 12.5 2.5 Yield/Force Off (s) 18.5 76.5 8.5 86.5 18.5 76.5 8.5 86.5 Yield/Force Off 170(s) 18.5 65.5 8.5 86.5 18.5 65.5 8.5 86.5 Local Start Time (s) 80 0 70 60 80 0 70 60 Local Yield (s) 86 54 76 64 86 54 76 64 Local Yield 170(s) 86 43 76 64 86 43 76 64 Intersection Summary Cycle Length 90 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 22.5 (25%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Splits and Phases: 3: Carriage/Camino del Mundo & Mulberry (SH14) Queues Short Total AM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates st am.syn Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Lane Group Flow (vph) 13 576 50 6 1174 173 16 5 41 v/c Ratio 0.06 0.50 0.05 0.01 1.03 0.68 0.16 0.02 0.33 Control Delay 3.5 11.5 0.1 3.0 52.6 49.8 23.6 30.0 21.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.5 11.5 0.1 3.0 52.6 49.8 23.6 30.0 21.3 Queue Length 50th (ft) 2 165 0 1 ~718 89 1 2 1 Queue Length 95th (ft) 5 230 0 3 #893 #155 20 11 30 Internal Link Dist (ft) 819 874 233 225 Turn Bay Length (ft) 150 225 100 60 25 Base Capacity (vph) 223 1147 1026 561 1145 253 103 253 126 Starvation Cap Reductn 000000000 Spillback Cap Reductn 000000000 Storage Cap Reductn 000000000 Reduced v/c Ratio 0.06 0.50 0.05 0.01 1.03 0.68 0.16 0.02 0.33 Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary Short Total PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates st pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 33 974 115 13 684 1 89 2 12 2 1 10 Future Volume (veh/h) 33 974 115 13 684 1 89 2 12 2 1 10 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 1070 70 14 752 0 98 20210 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 222222222222 Cap, veh/h 474 1185 1004 269 1185 1004 277 104 0 276 104 0 Arrive On Green 0.07 0.63 0.63 0.07 0.63 0.00 0.07 0.06 0.00 0.07 0.06 0.00 Sat Flow, veh/h 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Grp Volume(v), veh/h 36 1070 70 14 752 0 98 20210 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1781 1870 1585 1781 1870 0 1781 1870 0 Q Serve(g_s), s 0.6 44.1 0.8 0.2 22.2 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.6 44.1 0.8 0.2 22.2 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 Lane Grp Cap(c), veh/h 474 1185 1004 269 1185 1004 277 104 0 276 104 0 V/C Ratio(X) 0.08 0.90 0.07 0.05 0.63 0.00 0.35 0.02 0.00 0.01 0.01 0.00 Avail Cap(c_a), veh/h 493 1185 1004 289 1185 1004 297 104 0 296 104 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 7.0 14.1 1.7 15.2 10.1 0.0 37.2 40.2 0.0 34.8 40.2 0.0 Incr Delay (d2), s/veh 0.1 11.3 0.1 0.1 2.6 0.0 0.8 0.1 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 17.1 0.5 0.1 7.6 0.0 2.1 0.0 0.0 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 7.1 25.4 1.8 15.3 12.7 0.0 38.0 40.3 0.0 34.8 40.2 0.0 LnGrp LOS A C ABBADDACDA Approach Vol, veh/h 1176 766 100 3 Approach Delay, s/veh 23.4 12.8 38.0 36.6 Approach LOS C B D D Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 62.0 9.0 10.0 9.0 62.0 9.0 10.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 54.0 6.0 4.0 6.0 54.0 6.0 4.0 Max Q Clear Time (g_c+I1), s 2.2 46.1 2.0 2.0 2.6 24.2 2.0 2.1 Green Ext Time (p_c), s 0.0 4.5 0.1 0.0 0.0 5.1 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 20.2 HCM 6th LOS C Timing Report, Sorted By Phase Short Total PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates st pm.syn Phase Number 12345678 Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize Yes Yes Yes Yes Recall Mode Min C-Max Min Min Min C-Max Min Min Maximum Split (s) 10 60 10 10 10 60 10 10 Maximum Split (%) 11.1% 66.7% 11.1% 11.1% 11.1% 66.7% 11.1% 11.1% Minimum Split (s) 9.5 22.5 9.5 10 9.5 22.5 9.5 10 Yellow Time (s) 34343434 All-Red Time (s) 12121212 Minimum Initial (s) 55545554 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 4 4 Flash Dont Walk (s) 11 11 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 12.5 22.5 2.5 82.5 12.5 22.5 2.5 82.5 End Time (s) 22.5 82.5 12.5 2.5 22.5 82.5 12.5 2.5 Yield/Force Off (s) 18.5 76.5 8.5 86.5 18.5 76.5 8.5 86.5 Yield/Force Off 170(s) 18.5 65.5 8.5 86.5 18.5 65.5 8.5 86.5 Local Start Time (s) 80 0 70 60 80 0 70 60 Local Yield (s) 86 54 76 64 86 54 76 64 Local Yield 170(s) 86 43 76 64 86 43 76 64 Intersection Summary Cycle Length 90 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 22.5 (25%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Splits and Phases: 3: Carriage/Camino del Mundo & Mulberry (SH14) Queues Short Total PM 3: Carriage/Camino del Mundo & Mulberry (SH14) Fox Grove, Phase 2 02/01/2019 Synchro 10 Light Report Delich Associates st pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 36 1070 126 14 752 1 98 15 2 12 v/c Ratio 0.08 0.93 0.12 0.06 0.66 0.00 0.40 0.15 0.01 0.12 Control Delay 3.5 31.5 1.5 3.6 14.7 0.0 37.6 25.4 30.0 25.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.5 31.5 1.5 3.6 14.7 0.0 37.6 25.4 30.0 25.5 Queue Length 50th (ft) 4 493 0 2 250 0 49 1 1 1 Queue Length 95th (ft) 11 #836 18 6 377 0 94 21 7 18 Internal Link Dist (ft) 819 874 233 225 Turn Bay Length (ft) 150 225 100 150 60 25 Base Capacity (vph) 428 1150 1028 223 1147 1026 253 102 253 99 Starvation Cap Reductn 0000000000 Spillback Cap Reductn 0000000000 Storage Cap Reductn 0000000000 Reduced v/c Ratio 0.08 0.93 0.12 0.06 0.66 0.00 0.39 0.15 0.01 0.12 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. APPENDIX F 25 Mulberry 14 Fox Grove SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Fox Grove, Phase 2 TIS, February 2019 Pedestrian LOS Worksheet Project Location Classification: Other Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Fox Grove, Phase 1 Residential Minimum C C C C C 1 Actual A B A B B Proposed A B A B B Residential uses northeast of the site Residential Minimum C C C C C 2 Actual F B B B B Proposed F B B B B Commercial uses north of the site Commercial Minimum C C C C C 3 Actual F D B B B Proposed F D B B B Minimum 4 Actual Proposed Minimum 5 Actual Proposed Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed