Loading...
HomeMy WebLinkAboutFTC EAST DALE, WTE (VERIZON) - BASIC DEVELOPMENT REVIEW - BDR180016 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Routing Sheet New: X Revision: Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): Labels Received Y/N: N/A (Staff will create) n/a D n/a n/a n/a n/a n/a n/a n/a D n/a RETURN ALL REDLINES 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 19 0 17 12 0 5 0 0 0 0 0 0 0 0 1 0 0 0 0 19 Revised: 1-29-2016 CD CD CD CD CD CD CD T.I.A.(letter or full report) Utility Plans 6/22/2018 Planning Objectives Comment Response Letter Site Plan Landscape Plan New projects: APO labels & list: Kai Kleer Spencer Smith Wetland Delineation Ecological Study (ECS) Hazmat Review Soils Study- New/Update Digital copy of all materials Drainage Report Building Materials Exhibit Easements (As Needed) SWMP (Erosion Report) Photo-Simulations Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry (Digital Copies) GIS Historic Preservation CFC Light & Power Env. Services- Jonathon N (Digital Copies) Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Outside Agency Water District: Transportation Capital Expansion Fee P Technical Services (Digital Copies) Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: Railroad: ___________________ School District Other: 1 Total: Format Required: (P)aper, Digital (CD) Xcel Energy City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) (Digital Cop Outside Agency Sanitation Dist: Lighting Plan Plat Building Elevations Lighting Plan Drainage Report Turnaround Time: Comments Due: FTC East Dale - Wireless Telecommunication Equipment Basic Development Review BDR