Loading...
HomeMy WebLinkAboutTHE HUB ON CAMPUS - FDP - FDP180011 - SUBMITTAL DOCUMENTS - ROUND 2 - CITY STAFFWORD\DATA\FORMS\C-1.DOC REV.February 14, 2017 COMMERCIAL SERVICE INFORMATION FORM (C-1) City of Ft. Collins Electric Utility  700 Wood St.  P.O. Box 580  Ft. Collins, CO 80522 (970)221-6700 or fax (970)221-6619 Service voltages available are (not all voltages are available at all locations):  120/240 V. 1 phase, 3 wire  120/208 V. 3 phase, 4 wire  120/208 V. 1 phase, 3 wire (network)  277/480 V. 3 phase, 4 wire  Primary 13,200 V. Grd Y /7620  120/240 V. 3 phase, 4 wire (special utility permission required) For CT’d meters, Light and Power will provide the meter socket and CT’s to the electrical contractor. CT’s cannot be placed in the transformer, but may be located in a building mounted cabinet (provided by owner) or in the owner’s switchgear. In no case, can meters be mounted on the transformer. • Cold sequencing is required for all commercial services that are direct metered. • If CT’d metering, the owner must provide and install a - 1” conduit from the CT location to the electric meter. +Please complete the following completely and legibly: Date Submitted: _____________________________________ Voltage Requested: _____/_____  1 phase OR  3 phase Building Main (not fuse) Size: ____________________ Amps Number of Conduits: _______ Size of Conduits:_________ Number of Cables: ________ Size of Cables: ___________ Electric Heat:  Yes _________kW  No Business Name: ____________________________________ Site Address: ______________________________________ Owners Name: _____________________________________ Mail Address: ______________________________________ City: ______________________________________________ State & Zip: ________________________________________ Phone: ____________________________________________ General Contractor: _________________________________ Individual: _________________________________________ Mail Address: ______________________________________ City: ______________________________________________ State & Zip: ________________________________________ Phone: ____________________________________________ Electrical Contractor: ________________________________ Mail Address: ______________________________________ City: ______________________________________________ State & Zip: ________________________________________ Phone: ____________________________________________ Firm: ______________________________________________ Number of CT’d meters: __________ at ___________Amps each Number of Self-Contained meters: _____ at ________Amps each Largest Motor: ________ H.P. 1 Phase __________ H.P. 3 Phase Will any generating system (including photo-voltaics) be installed?  Yes (contact utility for requirements)  No If Yes, this will be for:  emergency service  parallel generation Will a fire pump be installed? □ Yes □ No Form Completed by: Name: ________________________________________________ Company:_____________________________________________ Mail Address: _________________________________________ City: _________________________________________________ State & Zip: ___________________________________________ Phone: _______________________________________________ For Office Use Only Transformer Size: _________________________________kVA Fault Current at Transformer: _______________________Amps 100% Construction - Cont. # ____________ Paid: ____________ A.T.E. Date: _____________________ Engineering Approval by: ______________ Date: _____________ Metering Approval by: _________________ Date: _____________ 120 208 X 4000A 11 3 1/2" 500MCM X 4/SET MANUEL HERNANDEZ RTM & ASSOCIATES 650 E. ALGONQUIN RD, SUITE 250 SCHAUMBURG IL, 60173 (847)-713-1034 ONE / APARTMENT AT 150A-3PH + 800A RESTAURANT + HOUSE X X X