HomeMy WebLinkAboutPLATTE RIVER POWER AUTHORITY CAMPUS - PDP - PDP170040 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Platte River Power Authority TIS, November 2017 ASSOCIATES has dual eastbound left-turn lanes, a westbound left-turn lane, two through lanes in each direction, and an eastbound and westbound right-turn lane. At the Horsetooth/Automation-PRPA Access intersection, Horsetooth Road has an eastbound and westbound left-turn lane and two through lanes in each direction. The Horsetooth/Automation-PRPA Access intersection has stop sign control on Automation Way and the PRPA Access. The posted speed limit in this area of Horsetooth Road is 40 mph. There are sidewalks with a landscape parkway along both sides of Horsetooth Road. There are bicycle lanes along Horsetooth Road. Danfield Court is to the north of the proposed Platte River Power Authority site. It is an east-west street classified as a local street according to the Fort Collins Master Street Plan. Currently, Danfield Court has a two-lane cross section in this area. Danfield Court is the west leg of the Timberline/Danfield-Lambkin intersection. At the Timberline/Danfield-Lambkin intersection, Danfield Court has all eastbound movements combined into a single lane. There is no posted speed limit on Danfield Court. There are sidewalks along both sides of Danfield Court. There are no bicycle lanes along Danfield Court. Lambkin Way is to the east of the proposed Platte River Power Authority site. It is an east-west street classified as a local street according to the Fort Collins Master Street Plan. Currently, Lambkin Way has a two-lane cross section in this area. Lambkin Way is the east leg of the Timberline/Danfield-Lambkin intersection. At the Timberline/Danfield-Lambkin intersection, Lambkin Way has a westbound left- turn/through lane and a westbound right-turn lane. There is no posted speed limit on Lambkin Way. There are no sidewalks along Lambkin Way. There are no bicycle lanes along Lambkin Way. Vermont Drive is to the north of the proposed Platte River Power Authority site. It is an east-west street classified as a two-lane collector street, east of Timberline Road, and a local street, west of Timberline Road, according to the Fort Collins Master Street Plan. Currently, Vermont Drive has a two-lane cross section in this area. At the Timberline/Vermont intersection, Vermont Drive has an eastbound left-turn lane, an eastbound through/right-turn lane, a westbound left-turn/through lane, and a westbound right-turn lane. The posted speed limit in this area of Vermont Drive is 25 mph. There are sidewalks along both sides of Vermont Drive. There are bicycle lanes along Vermont Drive, east of Timberline Road. Automation Way is to the south of the proposed Platte River Power Authority site. It is a northwest-southeast street classified as a local arterial street according to the Fort Collins Master Street Plan. Currently, Automation Way has a two-lane cross section in this area. Automation Way is the south leg of the Horsetooth/Automation-PRPA Access intersection. At the Horsetooth/Automation-PRPA Access intersection, Automation Way is not striped. However, it was observed to operate as a northbound left-turn/through lane and a right-turn lane. The posted speed limit in this area of Automation Way is 25 mph. There are sidewalks along both sides of Automation Way. There are no bicycle lanes along Automation Way. DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES The Platte River Power Authority Access is the north leg of the Horsetooth/Automation-PRPA Access intersection. At the Horsetooth/Automation- PRPA Access intersection, the PRPA Access has all southbound movements combined into a single lane. Figure 3 shows recent peak hour counts at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. The traffic volumes at the Timberline/Horsetooth intersection were collected in May 2017 by the City of Fort Collins. The traffic volumes at the Timberline/Danfield-Lambkin intersection were collected in October 2017. The traffic volumes at the Timberline/Vermont intersection were collected in June 2017. The traffic volumes at the Horsetooth/Automation-PRPA Access intersection were collected in June 2017. Raw traffic data is provided in Appendix B. Since the counts at the Timberline/Vermont and Horsetooth/Automation-PRPA Access were done when school was not in session, the counts were adjusted/balanced. The adjusted/balanced recent peak hour traffic is shown in Figure 4. Table 1 shows the current morning and afternoon peak hour operation of the Timberline/Horsetooth, Timberline/Danfield- Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. The Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections currently meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with existing control and geometry. At the Timberline/Danfield-Lambkin intersection, the calculated delay for the westbound approach was commensurate with level of service F. At the Horsetooth/Automation-PRPA Access intersection, the calculated delay for the northbound and southbound approach was commensurate with level of service F in the afternoon peak hour. Typically, the minor street movements operate at level of service E or F in an urban environment at unsignalized intersections along arterial streets during the peak hours. Calculation forms are provided in Appendix C. A description of level of service for signalized and unsignalized intersection from the 2010 Highway Capacity Manual is provided in Appendix C. Table 4-3 showing the Fort Collins Motor Vehicle LOS Standards (Intersections) is also provided in Appendix C. Acceptable overall operation at signalized intersections during the peak hours is defined as level of service D or better. At signalized intersections, acceptable operation of any leg and any movement is level of service E. At arterial/arterial and collector/collector stop sign controlled intersections, acceptable operation is considered to be at level of service E, overall and level of service F, for any approach leg. At arterial//collector, arterial/local, collector/local, and local/local stop sign controlled intersections, acceptable operation is considered to be at level of service D, overall and level of service F, for any approach leg. Figure 5 shows the site plan for the Platte River Power Authority. Platte River Power Authority is a redesign of the existing building with a 24,000 square expansion. The current headquarters building will be razed with Platte River Power Authority development. The right-in/right-out access to/from Horsetooth Road and the right- in/right-out access to/from Timberline Road will be removed. Access to the site will be via the existing full movement access to/from Horsetooth Road and an access to Eastbrook Drive. Trip generation is important in considering the impact of a development DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES such as this upon the existing and proposed street system. Single Tenant Office (Code 715) contain in Trip Generation, 9th Edition, ITE was used to estimate the trips that would be generated by the proposed/expected use at a site. A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows the expected trip generation on a daily and peak hour basis. The trip generation of the existing Platte River Power Authority development resulted in 490 daily trip ends; 73 morning peak; and 71 after peak hour trip ends. The trip generation of the expansion of Platte River Power Authority development resulted in 168 daily trip ends; 26 morning peak hour trip ends; and 25 afternoon peak hour trip ends. The total trip generation of the new Platte River Power Authority development resulted in 658 daily trip ends; 99 morning peak hour trip ends; and 96 afternoon peak hour trip ends. Directional distribution of the generated trips was determined for Platte River Power Authority development and is shown in Figure 6. Figure 7 shows the site generated peak hour traffic assignment of the Platte River Power Authority development. Figure 8 shows the short range (2022) background morning and afternoon peak hour traffic at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. Background traffic volume forecasts for the short range (2022) future were obtained by reviewing traffic studies for other developments in this area and reviewing historic counts in the area. Traffic volumes at the Timberline/Horsetooth, Timberline/Danfield- Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections were increased at a rate of 2.0 percent per year. Table 3 shows the short range (2022) background morning and afternoon peak hour operation at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. Calculation forms are provided in Appendix D. The Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections will meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with the existing control and geometry in the short range (2022) future. At the Timberline/Danfield-Lambkin intersection, the calculated delay for the westbound approach was commensurate with level of service F. At the Horsetooth/Automation- PRPA Access intersection, the calculated delay for the northbound approach was commensurate with level of service F in the afternoon peak hour. Figure 9 shows the short range (2021) total morning and afternoon peak hour traffic at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. Table 4 shows the short range (2022) total morning and afternoon peak hour operation at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. Calculation forms are provided in Appendix E. The Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections will meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with the existing control and geometry. At the Timberline/Danfield-Lambkin intersection, the calculated delay for the westbound approach was commensurate with level of service F. DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES The recommended short range (2022) geometry is shown in Figure 10. This is the existing geometry at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections. A northbound right-turn lane is required at the Timberline/Horsetooth, Timberline/Danfield- Lambkin, and Timberline/Vermont intersections based on Figure 8-4 in LCUASS. According to Figure 8-4 in LCUASS, an eastbound right-turn lane is required at the Horsetooth/Automation-PRPA Access intersection. However, this project does not add traffic to these movements. According to Figure 8-4 in LCUASS, a southbound right- turn lane is required at the Timberline/Vermont intersection. This is required with the existing traffic volumes. Installing this southbound right-turn lane would require moving a signal pole and utilities. Typically at constrained locations, when turn lanes are shown to be required based on existing volumes and the impact of the development is minimal, they are not built unless the operation at the subject intersection is determined to be unacceptable. The Platte River Power Authority site is in an area within which the City requires pedestrian and bicycle level of service evaluations. Appendix F shows a map of the area that is within 1320 feet of the Platte River Power Authority site. The Platte River Power Authority site is located within an area termed as “school walking area,” which sets the pedestrian level of service threshold at LOS B for all measured categories, except for Visual Interest and Amenity at LOS C. There are five destination areas within 1320 feet of the proposed development at Platte River Power Authority: 1) the residential neighborhood to the west and Powerline Trail, 2) the commercial/residential area to the north, 3) Fort Collins High School to the east, 4) the residential neighborhood to the southeast, and 5) the commercial area to the south. The pedestrian level of service will be met for all categories, except Street Crossing to the east and southeast. Crossing Timberline Road requires crossing 6 lanes and this cannot be mitigated. Appendix F contains a Pedestrian LOS Worksheet. Based upon Fort Collins Bicycle LOS criteria, there are two destinations within 1320 feet of the Platte River Power Authority site: 1) Fort Collins High School to the east and 2) the Powerline Trail to the west. Appendix F contains a Bicycle LOS Worksheet. The bicycle level of service will be met. Currently, this area is served by Transfort Route 12. The nearest stop is at the Horsetooth/Automation-PRPA Access and Timberline/Horsetooth intersections. Accident data was not available at the time of submittal. A memorandum will be submitted with discussion on safety and whether movements at the Horsetooth/Automation-PRPA Access intersection should be restricted. It is concluded that, with development of Platte River Power Authority, the future level of service at the Timberline/Horsetooth, Timberline/Danfield-Lambkin, Timberline/Vermont, and Horsetooth/Automation-PRPA Access intersections will meet the City of Fort Collins Motor Vehicle LOS Standards during the peak hours. Acceptable level of service is achieved for alternative transportation modes, except for street crossings in pedestrian LOS. Crossing Timberline Road requires crossing 6 lanes and this cannot be mitigated. SCALE: 1"=500' SITE LOCATION Figure 1 DELICH ASSOCIATES Platte River Power Authority TIS, Novmeber 2017 Automation Way Timberline Road Danfield Court Vermont Drive Horsetooth Road EXISTING GEOMETRY Figure 2 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way PRPA Access Danfield Court Lambkin Way Vermont Drive - Denotes Lane RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way 16/107 0/0 18/115 7/7 0/0 1/9 5/7 851/963 158/50 3/1 688/1174 26/9 196/300 1093/948 56/62 257/335 810/1002 120/174 408/402 396/468 237/286 197/155 386/511 128/87 81/29 1439/1520 125/23 6/3 1167/1507 41/14 0/0 0/0 25/86 39/13 0/0 20/9 PRPA Access Danfield Court Lambkin Way AM/PM 40/11 1190/1417 48/70 60/11 944/1366 109/119 13/78 0/6 ADJUST/BALANCED RECENT PEAK HOUR TRAFFIC Figure 4 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way 16/107 0/0 18/115 7/7 0/0 1/9 5/7 1022/1032 158/50 3/1 810/1136 26/9 196/300 1093/948 56/62 257/335 810/1002 120/174 408/402 396/468 237/286 197/155 386/511 128/87 81/29 1439/1520 125/23 6/3 1167/1507 41/14 0/0 0/0 25/86 39/13 0/0 20/9 PRPA Access Danfield Court Lambkin Way AM/PM 40/11 1377/1452 61/70 60/11 1128/1425 125/119 13/78 DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Timberline/Horsetooth (signal) EB LT E E EB T D D EB RT A A EB APPROACH D D WB LT D D WB T D E WB RT A A WB APPROACH D E NB LT D B NB T/RT C C NB APPROACH D C SB LT D B SB T D A SB RT A A SB APPROACH D A OVERALL D C Timberline/Danfield-Lambkin (stop sign) EB LT/T/RT B C WB LT/T F F WB RT C C WB APPROACH F F NB LT B C SB LT C C OVERALL B A Timberline/Vermont (signal) EB LT D D EB T/RT A D EB APPROACH D D WB LT/T D D WB RT D D WB APPROACH D D NB LT A A NB T/RT A A NB APPROACH A A SB LT A A SB T/RT A A SB APPROACH A A OVERALL A A Horsetooth/Automation-PRPA Access (stop sign) EB LT B B WB LT B B NB LT/T E F NB RT B C NB APPROACH D F SB LT/T/RT C F OVERALL A A SITE PLAN Figure 5 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out Existing 715 Single Tenant Office 140 Emp 3.70 518 0.47 66 0.06 8 0.08 11 0.43 60 715 Single Tenant Office 39.8 KSF 11.65 460 1.60 64 0.20 8 0.26 10 1.48 59 Existing Averaged 490 65 8 11 60 Expansion 715 Single Tenant Office 40 Emp 3.70 148 0.47 19 0.06 2 0.08 3 0.43 17 715 Single Tenant Office 16.2 KSF 11.65 188 1.60 26 0.20 3 0.26 4 1.48 24 Expansion Averaged 168 23 3 4 21 Total 658 88 11 15 81 SCALE: 1"=500' TRIP DISTRIBUTION Figure 6 DELICH ASSOCIATES Platte River Power Authority TIS, Novmeber 2017 Automation Way Timberline Road Danfield Court Vermont Drive Horsetooth Road 45% 20% 15% 20% SITE GENERATED PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way 5/33 0/0 1/5 36/6 4/1 26/4 0/4 14/2 3/1 1/4 1/13 2/10 4/1 0/2 1/3 2/0 11/2 9/2 11/2 1/0 3/27 PRPA Access Danfield Court Lambkin Way AM/PM 6/1 12/2 2/16 Vermont Drive SHORT RANGE (2022) BACKGROUND PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way 16/107 0/0 18/115 0/0 0/0 0/0 0/0 1131/1162 158/50 0/0 900/1256 26/9 216/331 1207/1047 62/68 284/370 894/1106 132/192 450/444 437/517 262/316 217/171 426/564 141/96 81/29 1589/1678 125/23 6/3 1288/1664 41/14 0/0 0/0 25/86 39/13 0/0 20/9 PRPA Access Danfield Court Lambkin Way AM/PM 40/11 1527/1610 61/70 60/11 1249/1582 125/119 13/78 DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES TABLE 3 Short Range (2022) Background Peak Hour Operation Intersection Movement Level of Service AM PM Timberline/Horsetooth (signal) EB LT E E EB T D D EB RT A A EB APPROACH E D WB LT D D WB T E E WB RT A A WB APPROACH D E NB LT D B NB T/RT D C NB APPROACH D C SB LT E B SB T D A SB RT A A SB APPROACH D A OVERALL D C Timberline/Danfield-Lambkin (stop sign) EB LT/T/RT C D WB LT/T F F WB RT C C WB APPROACH F F NB LT B C SB LT C C OVERALL C A Timberline/Vermont (signal) EB LT D D EB T/RT A D EB APPROACH D D WB LT/T D D WB RT D D WB APPROACH D D NB LT A A NB T/RT A A NB APPROACH A A SB LT A A SB T/RT A A SB APPROACH A A OVERALL A A Horsetooth/Automation-PRPA Access (stop sign) EB LT A A WB LT B B NB LT/T E F NB RT C C NB APPROACH D F SB LT/T/RT A A OVERALL A A SHORT RANGE (2022) TOTAL PEAK HOUR TRAFFIC Figure 9 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way 16/107 0/0 18/115 33/5 0/0 1/5 36/6 1135/1163 158/50 36/6 904/1256 26/9 230/333 1210/1048 62/68 289/370 895/1119 134/202 454/445 437/519 263/319 219/171 437/566 141/96 90/31 1589/1678 125/23 17/5 1289/1664 41/14 0/0 0/0 32/109 39/13 0/0 20/9 PRPA Access Danfield Court Lambkin Way AM/PM 40/11 1527/1610 61/70 66/12 1261/1584 125/119 15/94 DELICH Platte River Power Authority TIS, November 2017 ASSOCIATES TABLE 4 Short Range (2022) Total Peak Hour Operation Intersection Movement Level of Service AM PM Timberline/Horsetooth (signal) EB LT E E EB T D D EB RT A A EB APPROACH E D WB LT D D WB T E E WB RT A A WB APPROACH D E NB LT D B NB T/RT D C NB APPROACH D C SB LT E B SB T D A SB RT A A SB APPROACH D A OVERALL D C Timberline/Danfield-Lambkin (stop sign) EB LT/T/RT C D WB LT/T F F WB RT C C WB APPROACH F F NB LT C C SB LT C C OVERALL C A Timberline/Vermont (signal) EB LT D D EB T/RT A D EB APPROACH D D WB LT/T D D WB RT D D WB APPROACH D D NB LT A A NB T/RT A A NB APPROACH A A SB LT A A SB T/RT A A SB APPROACH A A OVERALL A A Horsetooth/Automation-PRPA Access (stop sign) EB LT B B WB LT B B NB LT/T F F NB RT C C NB APPROACH D F SB LT/T/RT D F OVERALL A A SHORT RANGE (2022) GEOMETRY Figure 10 DELICH ASSOCIATES Platte River Power Authority TIS, November 2017 Horsetooth Road Timberline Road Automation Way PRPA Access Danfield Court Lambkin Way Vermont Drive - Denotes Lane APPENDIX A 1 2 SCALE: 1"=500' SITE LOCATION/TRIP DISTRIBUTION Figure 1 DELICH ASSOCIATES Platte River Power Authority TIS, Novmeber 2017 Page 3 Automation Way Timberline Road Danfield Court Vermont Drive Horsetooth Road 45% 20% 15% 20% 3 G G G G EXISTING SIDEWALK TO REMAIN SITE WALL 290'-5" 25'-8" 41' 8' 60' 10' 26' 17' 7' P.A. P.A. P.A. PA P.A. P.A. P.A. EXISTING SIDEWALK TO REMAIN MONUMENT SIGN RAISED CROSSWALK HEADQUARTERS BUILDING 13 PA PA 5 5 9 8 13 15 13 POOL CAR GARAGE VISITOR PARKING (29 SPACES) 15 14 EMPLOYEE PARKING (81 SPACES) EMPLOYEE PARKING (77 SPACES) MICROWAVE BUILDING WAREHOUSE MAINTENANCE SHOP/ TRUCK WASH 9 13 10 5 12 5 5 9 9 EXISTING PARKING LOT TO REMAIN (EQUIPMENT LAYDOWN AREA) SUBSTATION GARAGE VEHICLE PARKING GARAGE A Square Foot Comparisons - Programming to SD 10/25/2017 Delta (SF) Programming (GSF) Schematic Design (GSF) DD 5/19/17 (GSF) Current (GSF) SD - Current % Delta HQ Building 54,650 57,129 56,700 54,187 -2,942 -5.4% Level 1 27,559 Level 2 26,628 Pool Car Garage 2,824 4,711 2,960 2,870 -1,841 -65.2% Warehouse 9,534 8,432 8,340 9,800 1,368 14.3% Warehouse Storage 8,141 6,942 Level 1 6,580 Facilities Offices 1,143 1,196 Level 2 3,220 Facilities Kitchenette 250 294 Maintenance Shop/Truck Wash 5,612 4,471 6,517 6,580 2,109 37.6% Substation Garage 6,588 6,318 6,258 6,335 17 0.3% Fleet Parking A 9,176 7,143 5,832 7,545 402 4.4% Fleet Parking B 4,706 6,700 6,772 5,100 -1,600 -34.0% 5 DELICH Platte River Power Authority TIS, October 2017 ASSOCIATES TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out Existing 715 Single Tenant Office 140 Emp 3.70 518 0.47 66 0.06 8 0.08 11 0.43 60 39.8 KSF 11.65 460 1.60 64 0.20 8 0.26 10 1.48 59 Existing Averaged 490 65 8 11 60 Expansion 715 Single Tenant Office 40 Emp 3.70 148 0.47 19 0.06 2 0.08 3 0.43 17 16.2 KSF 11.65 188 1.60 26 0.20 3 0.26 4 1.48 24 Expansioin Averaged 168 23 3 4 21 Total 658 6 APPENDIX B 7 8 9 10 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 10/4/2017 Observer: Vickie Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Timberline/Danfield-Lambkin S = straight L = left turn Time Northbound: Timberline Southbound: Timberline Total Eastbound: Danfield Westbound: Lambkin Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 18 404 43 465 10 296 3 309 774 007 7 5015 20 27 801 7:45 32 343 64 439 19 342 0 361 800 0011 11 7016 23 34 834 8:00 16 339 12 367 10 286 2 298 665 004 4 506 11 15 680 8:15 15 353 6 374 2 243 1 246 620 003 3 302 5 8 628 7:30-8:30 81 1439 125 1645 41 1167 6 1214 2859 0 0 25 25 20 0 39 59 84 2943 PHF 0.63 0.89 0.49 0.88 0.54 0.85 0.5 0.84 n/a n/a 0.57 0.57 0.71 n/a 0.61 0.64 0.88 4:30 11 322 7 340 1 317 2 320 660 0019 19 205 7 26 686 4:45 11 374 2 387 4 374 1 379 766 0017 17 002 2 19 785 5:00 3 403 5 411 6 391 0 397 808 0032 32 202 4 36 844 5:15 4 421 9 434 3 425 0 428 862 0018 18 504 9 27 889 4:30-5:30 29 1520 23 1572 14 1507 3 1524 3096 0 0 86 86 9 0 13 22 108 3204 PHF 0.66 0.9 0.64 0.91 0.58 0.89 0.38 0.89 n/a n/a 0.67 0.67 0.45 n/a 0.65 0.61 0.9 11 12 13 14 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 6/22/2017 Observer: Vickie Day: Thrusday Jurisdiction: Fort Collins R = right turn Intersection: Horsetooth/Automation-PRPA Access S = straight L = left turn Time Northbound: Automation Southbound: PRPA Access Total Eastbound: Horsetooth Westbound: Horsetooth Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 403 7 101 2 9 4 213 30 247 1 156 1 158 405 414 7:45 703 10 005 5 15 0 254 64 318 12 181 1 194 512 527 8:00 009 9 000 0 9 1 172 33 206 5 162 1 168 374 383 8:15 503 8 001 1 9 0 212 31 243 8 189 0 197 440 449 7:30-8:30 16 0 18 34 1 0 7 8 42 5 851 158 1014 26 688 3 717 1731 1773 PHF 0.57 n/a 0.5 0.85 0.25 n/a 0.35 0.4 0.31 0.84 0.62 0.8 0.54 0.91 0.75 0.91 0.84 4:30 28 0 33 61 000 0 61 3 218 13 234 2 276 0 278 512 573 4:45 14 0 21 35 301 4 39 1 209 15 225 3 284 1 288 513 552 5:00 36 0 31 67 303 6 73 3 277 10 290 2 326 0 328 618 691 5:15 29 0 30 59 303 6 65 0 259 12 271 2 288 0 290 561 626 4:30-5:30 107 0 115 222 9 0 7 16 238 7 963 50 1020 9 1174 1 1184 2204 2442 PHF 0.74 n/a 0.87 0.83 0.75 n/a 0.58 0.67 0.58 0.87 0.83 0.88 0.75 0.9 0.25 0.9 0.88 15 APPENDIX C 16 HCM 2010 Signalized Intersection Summary 95: Timberline & Horsetooth recent am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 408 396 237 128 386 197 196 1093 56 120 810 257 Future Volume (veh/h) 408 396 237 128 386 197 196 1093 56 120 810 257 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1824 1863 1863 1863 Adj Flow Rate, veh/h 464 450 0 145 439 0 223 1242 61 136 920 0 Adj No. of Lanes 221121220221 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 222222222222 Cap, veh/h 532 870 389 306 548 245 324 1581 78 227 1532 685 Arrive On Green 0.15 0.25 0.00 0.06 0.15 0.00 0.09 0.46 0.46 0.02 0.14 0.00 Sat Flow, veh/h 3442 3539 1583 1774 3539 1583 3442 3431 168 3442 3539 1583 Grp Volume(v), veh/h 464 450 0 145 439 0 223 640 663 136 920 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1583 1774 1770 1583 1721 1770 1830 1721 1770 1583 Q Serve(g_s), s 14.5 12.1 0.0 7.0 13.2 0.0 6.9 33.6 33.7 4.3 26.8 0.0 Cycle Q Clear(g_c), s 14.5 12.1 0.0 7.0 13.2 0.0 6.9 33.6 33.7 4.3 26.8 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 1.00 Lane Grp Cap(c), veh/h 532 870 389 306 548 245 324 816 843 227 1532 685 V/C Ratio(X) 0.87 0.52 0.00 0.47 0.80 0.00 0.69 0.78 0.79 0.60 0.60 0.00 Avail Cap(c_a), veh/h 532 901 403 306 579 259 563 816 843 282 1532 685 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 45.4 35.8 0.0 36.8 44.8 0.0 48.3 25.0 25.1 52.4 38.2 0.0 Incr Delay (d2), s/veh 14.7 0.5 0.0 1.1 7.6 0.0 2.6 7.5 7.3 2.5 1.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 8.0 5.9 0.0 0.5 7.0 0.0 3.4 18.0 18.7 2.1 13.5 0.0 LnGrp Delay(d),s/veh 60.2 36.3 0.0 37.9 52.4 0.0 50.8 32.5 32.4 54.9 40.0 0.0 LnGrp LOS E D D D DCCDD Approach Vol, veh/h 914 584 1526 1056 Approach Delay, s/veh 48.4 48.8 35.1 41.9 Approach LOS DDDD Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 14.4 52.6 11.0 32.0 11.3 55.7 21.0 22.0 Change Period (Y+Rc), s 5.0 6.0 5.0 6.0 5.0 6.0 5.0 6.0 Max Green Setting (Gmax), s 17.0 38.0 6.0 27.0 8.0 47.0 16.0 17.0 Max Q Clear Time (g_c+I1), s 8.9 28.8 9.0 14.1 6.3 35.7 16.5 15.2 Green Ext Time (p_c), s 0.5 5.8 0.0 2.9 0.1 6.8 0.0 0.7 Intersection Summary HCM 2010 Ctrl Delay 41.8 HCM 2010 LOS D Notes 17 Timing Report, Sorted By Phase 95: Timberline & Horsetooth recent am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 5 Phase Number 12345678 Movement NBL SBT WBL EBT SBL NBT EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 22 44 11 33 13 53 21 23 Maximum Split (%) 20.0% 40.0% 10.0% 30.0% 11.8% 48.2% 19.1% 20.9% Minimum Split (s) 11 29 11 30 11 32.5 11 29 Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5 All-Red Time (s) 2 1.5 2 1.5 2 1.5 2 1.5 Minimum Initial (s) 4 10 4 10 4 10 4 10 Vehicle Extension (s) 33333333 Minimum Gap (s) 33343334 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 16 17 19 16 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes No Yes Yes Yes No Start Time (s) 12.5 34.5 78.5 89.5 12.5 25.5 78.5 99.5 End Time (s) 34.5 78.5 89.5 12.5 25.5 78.5 99.5 12.5 Yield/Force Off (s) 29.5 72.5 84.5 6.5 20.5 72.5 94.5 6.5 Yield/Force Off 170(s) 29.5 56.5 84.5 99.5 20.5 53.5 94.5 100.5 Local Start Time (s) 50 72 6 17 50 63 6 27 Local Yield (s) 67 0 12 44 58 0 22 44 Local Yield 170(s) 67 94 12 27 58 91 22 28 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 105 Offset: 72.5 (66%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow Splits and Phases: 95: Timberline & Horsetooth 18 HCM 2010 Signalized Intersection Summary 95: Timberline & Horsetooth recent pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 402 468 286 87 511 155 300 948 62 174 1002 336 Future Volume (veh/h) 402 468 286 87 511 155 300 948 62 174 1002 336 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1824 1863 1863 1863 Adj Flow Rate, veh/h 423 493 0 92 538 0 316 998 61 183 1055 0 Adj No. of Lanes 221121220221 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 222222222222 Cap, veh/h 502 904 404 295 615 275 804 1635 100 587 1634 731 Arrive On Green 0.15 0.26 0.00 0.06 0.17 0.00 0.08 0.48 0.48 0.11 0.92 0.00 Sat Flow, veh/h 3442 3539 1583 1774 3539 1583 3442 3385 207 3442 3539 1583 Grp Volume(v), veh/h 423 493 0 92 538 0 316 522 537 183 1055 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1583 1774 1770 1583 1721 1770 1822 1721 1770 1583 Q Serve(g_s), s 14.4 14.5 0.0 5.0 17.8 0.0 5.4 25.9 25.9 3.2 6.8 0.0 Cycle Q Clear(g_c), s 14.4 14.5 0.0 5.0 17.8 0.0 5.4 25.9 25.9 3.2 6.8 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 1.00 Lane Grp Cap(c), veh/h 502 904 404 295 615 275 804 855 880 587 1634 731 V/C Ratio(X) 0.84 0.55 0.00 0.31 0.87 0.00 0.39 0.61 0.61 0.31 0.65 0.00 Avail Cap(c_a), veh/h 516 904 404 314 619 277 1055 855 880 911 1634 731 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 49.9 38.7 0.0 36.9 48.3 0.0 13.7 22.7 22.7 16.5 2.7 0.0 Incr Delay (d2), s/veh 11.8 0.7 0.0 0.6 13.2 0.0 0.3 3.2 3.1 0.3 2.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 7.6 7.1 0.0 2.5 9.8 0.0 2.6 13.4 13.8 1.5 3.1 0.0 LnGrp Delay(d),s/veh 61.8 39.3 0.0 37.5 61.5 0.0 14.0 26.0 25.9 16.8 4.7 0.0 LnGrp LOS E D D E B C C B A Approach Vol, veh/h 916 630 1375 1238 Approach Delay, s/veh 49.7 58.0 23.2 6.5 Approach LOS D E C A Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 12.2 60.4 11.7 35.6 9.7 63.0 21.5 25.8 Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 5.0 6.0 Max Green Setting (Gmax), s 17.0 45.0 8.0 29.0 17.0 45.0 17.0 20.0 Max Q Clear Time (g_c+I1), s 7.4 8.8 7.0 16.5 5.2 27.9 16.4 19.8 Green Ext Time (p_c), s 0.8 10.8 0.0 3.4 0.5 8.2 0.1 0.1 Intersection Summary HCM 2010 Ctrl Delay 29.3 HCM 2010 LOS C Notes 19 Timing Report, Sorted By Phase 95: Timberline & Horsetooth recent pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 5 Phase Number 12345678 Movement NBL SBTL WBL EBT SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 21 51 13 35 21 51 22 26 Maximum Split (%) 17.5% 42.5% 10.8% 29.2% 17.5% 42.5% 18.3% 21.7% Minimum Split (s) 11 29 11 30 11 32.5 11 29 Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5 All-Red Time (s) 1 1.5 2 1.5 1 1.5 2 1.5 Minimum Initial (s) 4 10 4 10 4 10 4 10 Vehicle Extension (s) 33333333 Minimum Gap (s) 33343334 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 16 17 19 16 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 87.5 108.5 39.5 52.5 87.5 108.5 39.5 61.5 End Time (s) 108.5 39.5 52.5 87.5 108.5 39.5 61.5 87.5 Yield/Force Off (s) 104.5 33.5 47.5 81.5 104.5 33.5 56.5 81.5 Yield/Force Off 170(s) 104.5 17.5 47.5 64.5 104.5 14.5 56.5 65.5 Local Start Time (s) 54 75 6 19 54 75 6 28 Local Yield (s) 71 0 14 48 71 0 23 48 Local Yield 170(s) 71 104 14 31 71 101 23 32 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 85 Offset: 33.5 (28%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 95: Timberline & Horsetooth 20 HCM 2010 TWSC 8: Timberline & Danfield/Lambkin recent am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 12.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 25 20 0 39 81 1439 125 41 1167 6 Future Vol, veh/h 0 0 25 20 0 39 81 1439 125 41 1167 6 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 0 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 28 23 0 44 92 1635 142 47 1326 7 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2425 3384 666 2646 3316 889 1333 0 0 1777 0 0 Stage 1 1423 1423 - 1890 1890 - - - - - - - Stage 2 1002 1961 - 756 1426 - - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 17 7 402 ~ 11 8 286 513 - - 346 - - Stage 1 143 200 - 72 117 - - - - - - - Stage 2 260 108 - 366 199 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 11 5 402 ~ 8 6 286 513 - - 346 - - Mov Cap-2 Maneuver 11 5 - ~ 8 6 - - - - - - - Stage 1 117 173 - 59 96 - - - - - - - Stage 2 180 89 - 294 172 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 14.6 $ 600.7 0.7 0.6 HCM LOS B F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 513 - - 402 8 286 346 - - HCM Lane V/C Ratio 0.179 - - 0.071 2.841 0.155 0.135 - - HCM Control Delay (s) 13.5 - - 14.$6 1733.4 19.9 17 - - HCM Lane LOS B - - B F C C - - HCM 95th %tile Q(veh) 0.6 - - 0.2 4 0.5 0.5 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 21 HCM 2010 TWSC 7: Timberline & Danfield/Lambkin recent pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 4.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 86 9 0 13 29 1520 23 14 1507 3 Future Vol, veh/h 0 0 86 9 0 13 29 1520 23 14 1507 3 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 0 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 96 10 0 14 32 1689 26 16 1674 3 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2616 3486 839 2634 3475 857 1678 0 0 1714 0 0 Stage 1 1707 1707 - 1766 1766 - - - - - - - Stage 2 909 1779 - 868 1709 - - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 12 6 309 11 6 301 378 - - 366 - - Stage 1 95 145 - 87 135 - - - - - - - Stage 2 296 133 - 314 145 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 10 5 309 ~ 7 5 301 378 - - 366 - - Mov Cap-2 Maneuver 10 5 - ~ 7 5 - - - - - - - Stage 1 87 139 - 80 124 - - - - - - - Stage 2 258 122 - 207 139 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 21.8 $ 500.8 0.3 0.1 HCM LOS C F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 378 - - 309 7 301 366 - - HCM Lane V/C Ratio 0.085 - - 0.309 1.429 0.048 0.043 - - HCM Control Delay (s) 15.4 - - 21.$8 1198.7 17.6 15.3 - - HCM Lane LOS C - - C F C C - - HCM 95th %tile Q(veh) 0.3 - - 1.3 2.1 0.2 0.1 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 22 HCM 2010 Signalized Intersection Summary 137: Timberline & Vermont recent am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 13 73 7 111 40 1377 61 125 1128 60 Future Volume (veh/h) 13 0 13 73 7 111 40 1377 61 125 1128 60 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 0.97 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1824 1824 1937 1937 1863 1863 1824 1863 1863 1824 Adj Flow Rate, veh/h 15 0 0 85 8 32 47 1601 71 145 1312 67 Adj No. of Lanes 110011120120 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 222222222222 Cap, veh/h 138 210 0 216 14 181 355 2498 110 367 2524 129 Arrive On Green 0.11 0.00 0.00 0.11 0.11 0.11 0.07 1.00 1.00 0.05 0.74 0.74 Sat Flow, veh/h 1352 1863 0 1357 128 1603 1774 3449 152 1774 3427 175 Grp Volume(v), veh/h 15 0 0 93 0 32 47 818 854 145 677 702 Grp Sat Flow(s),veh/h/ln 1352 1863 0 1485 0 1603 1774 1770 1832 1774 1770 1832 Q Serve(g_s), s 1.2 0.0 0.0 6.5 0.0 2.0 0.7 0.0 0.0 2.2 17.9 18.0 Cycle Q Clear(g_c), s 7.7 0.0 0.0 6.5 0.0 2.0 0.7 0.0 0.0 2.2 17.9 18.0 Prop In Lane 1.00 0.00 0.91 1.00 1.00 0.08 1.00 0.10 Lane Grp Cap(c), veh/h 138 210 0 230 0 181 355 1282 1327 367 1304 1349 V/C Ratio(X) 0.11 0.00 0.00 0.40 0.00 0.18 0.13 0.64 0.64 0.40 0.52 0.52 Avail Cap(c_a), veh/h 299 432 0 407 0 372 419 1282 1327 553 1304 1349 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.8 0.0 0.0 46.2 0.0 44.2 4.5 0.0 0.0 3.0 6.2 6.2 Incr Delay (d2), s/veh 0.3 0.0 0.0 1.1 0.0 0.5 0.2 2.4 2.4 0.7 1.5 1.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.0 2.8 0.0 0.9 0.3 0.9 0.9 1.1 9.2 9.5 LnGrp Delay(d),s/veh 50.2 0.0 0.0 47.3 0.0 44.6 4.6 2.4 2.4 3.7 7.7 7.6 LnGrp LOS D D D AAAAAA Approach Vol, veh/h 15 125 1719 1524 Approach Delay, s/veh 50.2 46.6 2.5 7.3 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.0 86.0 16.9 8.4 84.7 16.9 Change Period (Y+Rc), s 4.0 6.0 5.5 4.0 6.0 5.5 Max Green Setting (Gmax), s 7.0 63.0 24.5 16.0 54.0 24.5 Max Q Clear Time (g_c+I1), s 2.7 20.0 9.7 4.2 2.0 8.5 Green Ext Time (p_c), s 0.0 20.2 0.3 0.3 21.7 0.3 Intersection Summary HCM 2010 Ctrl Delay 6.5 HCM 2010 LOS A 23 Timing Report, Sorted By Phase 137: Timberline & Vermont recent am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 7 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 69 30 20 60 30 Maximum Split (%) 10.0% 62.7% 27.3% 18.2% 54.5% 27.3% Minimum Split (s) 11 23 28.5 11 23 29.5 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 1 1.5 2.5 1 1.5 2.5 Minimum Initial (s) 4 10 2 4 10 4 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 16 10 17 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 47 58 17 47 67 17 End Time (s) 58 17 47 67 17 47 Yield/Force Off (s) 54 11 41.5 63 11 41.5 Yield/Force Off 170(s) 54 1 25.5 63 1 24.5 Local Start Time (s) 30 41 0 30 50 0 Local Yield (s) 37 104 24.5 46 104 24.5 Local Yield 170(s) 37 94 8.5 46 94 7.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 17 (15%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 137: Timberline & Vermont 24 HCM 2010 Signalized Intersection Summary 137: Timberline & Vermont recent pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 78 6 62 37 5 54 11 1452 70 119 1425 11 Future Volume (veh/h) 78 6 62 37 5 54 11 1452 70 119 1425 11 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1824 1824 1937 1937 1863 1863 1824 1863 1863 1824 Adj Flow Rate, veh/h 81 6 13 39 5 5 11 1512 70 124 1484 10 Adj No. of Lanes 110011120120 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 222222222222 Cap, veh/h 180 62 135 201 23 195 299 2529 117 370 2728 18 Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.04 1.00 1.00 0.04 0.76 0.76 Sat Flow, veh/h 1396 519 1124 1203 189 1620 1774 3445 159 1774 3603 24 Grp Volume(v), veh/h 81 0 19 44 0 5 11 774 808 124 729 765 Grp Sat Flow(s),veh/h/ln 1396 0 1643 1392 0 1620 1774 1770 1834 1774 1770 1858 Q Serve(g_s), s 6.8 0.0 1.2 2.9 0.0 0.3 0.2 0.0 0.0 1.9 20.4 20.4 Cycle Q Clear(g_c), s 10.9 0.0 1.2 4.1 0.0 0.3 0.2 0.0 0.0 1.9 20.4 20.4 Prop In Lane 1.00 0.68 0.89 1.00 1.00 0.09 1.00 0.01 Lane Grp Cap(c), veh/h 180 0 198 224 0 195 299 1299 1346 370 1340 1406 V/C Ratio(X) 0.45 0.00 0.10 0.20 0.00 0.03 0.04 0.60 0.60 0.34 0.54 0.54 Avail Cap(c_a), veh/h 297 0 335 348 0 331 384 1299 1346 474 1340 1406 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 53.2 0.0 47.0 48.6 0.0 46.6 4.9 0.0 0.0 2.9 6.0 6.0 Incr Delay (d2), s/veh 1.8 0.0 0.2 0.4 0.0 0.1 0.0 2.0 2.0 0.5 1.6 1.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 0.0 0.6 1.4 0.0 0.1 0.1 0.7 0.7 0.9 10.3 10.8 LnGrp Delay(d),s/veh 55.0 0.0 47.2 49.0 0.0 46.6 5.0 2.0 2.0 3.4 7.6 7.5 LnGrp LOS D D D D AAAAAA Approach Vol, veh/h 100 49 1593 1618 Approach Delay, s/veh 53.5 48.8 2.0 7.3 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.2 95.8 18.9 8.0 93.1 18.9 Change Period (Y+Rc), s 4.0 6.0 5.5 4.0 6.0 5.5 Max Green Setting (Gmax), s 7.0 74.0 23.5 11.0 70.0 23.5 Max Q Clear Time (g_c+I1), s 2.2 22.4 12.9 3.9 2.0 6.1 Green Ext Time (p_c), s 0.0 21.8 0.3 0.2 23.6 0.4 Intersection Summary HCM 2010 Ctrl Delay 6.8 HCM 2010 LOS A Notes 25 Timing Report, Sorted By Phase 137: Timberline & Vermont recent pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 8 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 80 29 15 76 29 Maximum Split (%) 9.2% 66.7% 24.2% 12.5% 63.3% 24.2% Minimum Split (s) 11 23 28.5 11 23 29.5 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 1 1.5 2.5 1 1.5 2.5 Minimum Initial (s) 4 10 4 4 10 4 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 16 10 17 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 83 94 54 83 98 54 End Time (s) 94 54 83 98 54 83 Yield/Force Off (s) 90 48 77.5 94 48 77.5 Yield/Force Off 170(s) 90 38 61.5 94 38 60.5 Local Start Time (s) 35 46 6 35 50 6 Local Yield (s) 42 0 29.5 46 0 29.5 Local Yield 170(s) 42 110 13.5 46 110 12.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 48 (40%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 137: Timberline & Vermont 26 HCM 2010 TWSC 5: Automation/PRPA Access & Horsetooth recent am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 1 Intersection Int Delay, s/veh 0.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 1022 158 26 810 3 16 0 18 1 0 7 Future Vol, veh/h 5 1022 158 26 810 3 16 0 18 1 0 7 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 6 1202 186 31 953 4 19 0 21 1 0 8 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 956 0 0 1388 0 0 1845 2325 694 1629 2416 478 Stage 1 - - - - - - 1307 1307 - 1016 1016 - Stage 2 - - - - - - 538 1018 - 613 1400 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 715 - - 489 - - 46 37 385 67 32 534 Stage 1 - - - - - - 169 228 - 255 314 - Stage 2 - - - - - - 495 313 - 446 205 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 715 - - 489 - - 43 34 385 60 30 534 Mov Cap-2 Maneuver - - - - - - 127 131 - 60 30 - Stage 1 - - - - - - 168 226 - 253 294 - Stage 2 - - - - - - 456 293 - 418 203 - Approach EB WB NB SB HCM Control Delay, s 0 0.4 25.9 18.9 HCM LOS D C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 127 385 715 - - 489 - - 269 HCM Lane V/C Ratio 0.148 0.055 0.008 - - 0.063 - - 0.035 HCM Control Delay (s) 38.2 14.9 10.1 - - 12.9 - - 18.9 HCM Lane LOS E B B - - B - - C HCM 95th %tile Q(veh) 0.5 0.2 0 - - 0.2 - - 0.1 27 HCM 2010 TWSC 4: Automation/PRPA Access & Horsetooth recent pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 1 Intersection Int Delay, s/veh 7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 7 1032 50 9 1136 1 107 0 115 9 0 7 Future Vol, veh/h 7 1032 50 9 1136 1 107 0 115 9 0 7 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 8 1173 57 10 1291 1 122 0 131 10 0 8 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1292 0 0 1230 0 0 1883 2530 615 1914 2557 646 Stage 1 - - - - - - 1217 1217 - 1312 1312 - Stage 2 - - - - - - 666 1313 - 602 1245 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 532 - - 562 - - ~ 43 27 434 41 26 414 Stage 1 - - - - - - 192 252 - 167 227 - Stage 2 - - - - - - 415 226 - 453 244 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 532 - - 562 - - ~ 41 26 434 28 25 414 Mov Cap-2 Maneuver - - - - - - 132 117 - 28 25 - Stage 1 - - - - - - 189 248 - 164 223 - Stage 2 - - - - - - 400 222 - 312 240 - Approach EB WB NB SB HCM Control Delay, s 0.1 0.1 67.6 123.5 HCM LOS F F Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 132 434 532 - - 562 - - 47 HCM Lane V/C Ratio 0.921 0.301 0.015 - - 0.018 - - 0.387 HCM Control Delay (s) 122.3 16.8 11.9 - - 11.5 - - 123.5 HCM Lane LOS F C B - - B - - F HCM 95th %tile Q(veh) 6.1 1.3 0 - - 0.1 - - 1.4 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 28 UNSIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50 SIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 20 C > 20 and < 35 D > 35 and < 55 E > 55 and < 80 F > 80 29 Table 4-3 Fort Collins (GMA and City Limits) Motor Vehicle LOS Standards (Intersections) Overall Any Approach Leg Any Movement Signalized D1 E E2 Unsignalized E3 F4 Arterial/Arterial Collector/Collector Unsignalized D3 F4 Arterial/Collector Arterial/Local Collector/Local Local/Local Roundabout E3,5 E5,4 E5 1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable 2 Applicable with at least 5% of total entering volume 3 Use weighed average to identify overall delay 4 Mitigation may be required 5 Apply unsignalized delay value thresholds to determine LOS 30 APPENDIX D 31 HCM 2010 Signalized Intersection Summary 95: Timberline & Horsetooth short background am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 450 437 262 141 426 217 216 1207 62 132 894 284 Future Volume (veh/h) 450 437 262 141 426 217 216 1207 62 132 894 284 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1824 1863 1863 1863 Adj Flow Rate, veh/h 511 497 0 160 484 0 245 1372 67 150 1016 0 Adj No. of Lanes 221121220221 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 222222222222 Cap, veh/h 532 895 400 296 573 257 347 1543 75 242 1483 664 Arrive On Green 0.15 0.25 0.00 0.06 0.16 0.00 0.10 0.45 0.45 0.02 0.14 0.00 Sat Flow, veh/h 3442 3539 1583 1774 3539 1583 3442 3432 167 3442 3539 1583 Grp Volume(v), veh/h 511 497 0 160 484 0 245 706 733 150 1016 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1583 1774 1770 1583 1721 1770 1830 1721 1770 1583 Q Serve(g_s), s 16.2 13.4 0.0 7.0 14.6 0.0 7.6 40.2 40.5 4.8 30.1 0.0 Cycle Q Clear(g_c), s 16.2 13.4 0.0 7.0 14.6 0.0 7.6 40.2 40.5 4.8 30.1 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 1.00 Lane Grp Cap(c), veh/h 532 895 400 296 573 257 347 795 823 242 1483 664 V/C Ratio(X) 0.96 0.56 0.00 0.54 0.84 0.00 0.71 0.89 0.89 0.62 0.68 0.00 Avail Cap(c_a), veh/h 532 901 403 296 579 259 563 795 823 282 1483 664 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 46.2 35.7 0.0 37.0 44.7 0.0 47.9 27.7 27.8 52.3 40.5 0.0 Incr Delay (d2), s/veh 29.3 0.7 0.0 2.0 10.9 0.0 2.7 14.0 13.9 3.2 2.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 9.9 6.6 0.0 1.1 8.0 0.0 3.7 22.7 23.5 2.4 15.3 0.0 LnGrp Delay(d),s/veh 75.4 36.5 0.0 39.0 55.7 0.0 50.5 41.7 41.8 55.4 43.1 0.0 LnGrp LOS E D D E D D D E D Approach Vol, veh/h 1008 644 1684 1166 Approach Delay, s/veh 56.2 51.5 43.0 44.7 Approach LOS E D D D Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 15.1 51.1 11.0 32.8 11.7 54.4 21.0 22.8 Change Period (Y+Rc), s 5.0 6.0 5.0 6.0 5.0 6.0 5.0 6.0 Max Green Setting (Gmax), s 17.0 38.0 6.0 27.0 8.0 47.0 16.0 17.0 Max Q Clear Time (g_c+I1), s 9.6 32.1 9.0 15.4 6.8 42.5 18.2 16.6 Green Ext Time (p_c), s 0.5 4.5 0.0 3.1 0.1 3.6 0.0 0.2 Intersection Summary HCM 2010 Ctrl Delay 47.6 HCM 2010 LOS D Notes 32 Timing Report, Sorted By Phase 95: Timberline & Horsetooth short background am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 5 Phase Number 12345678 Movement NBL SBT WBL EBT SBL NBT EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 22 44 11 33 13 53 21 23 Maximum Split (%) 20.0% 40.0% 10.0% 30.0% 11.8% 48.2% 19.1% 20.9% Minimum Split (s) 11 29 11 30 11 32.5 11 29 Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5 All-Red Time (s) 2 1.5 2 1.5 2 1.5 2 1.5 Minimum Initial (s) 4 10 4 10 4 10 4 10 Vehicle Extension (s) 33333333 Minimum Gap (s) 33343334 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 16 17 19 16 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes No Yes Yes Yes No Start Time (s) 99.5 11.5 55.5 66.5 99.5 2.5 55.5 76.5 End Time (s) 11.5 55.5 66.5 99.5 2.5 55.5 76.5 99.5 Yield/Force Off (s) 6.5 49.5 61.5 93.5 107.5 49.5 71.5 93.5 Yield/Force Off 170(s) 6.5 33.5 61.5 76.5 107.5 30.5 71.5 77.5 Local Start Time (s) 50 72 6 17 50 63 6 27 Local Yield (s) 67 0 12 44 58 0 22 44 Local Yield 170(s) 67 94 12 27 58 91 22 28 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 115 Offset: 49.5 (45%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow Splits and Phases: 95: Timberline & Horsetooth 33 HCM 2010 Signalized Intersection Summary 95: Timberline & Horsetooth short background pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 444 517 316 96 564 171 331 1047 68 192 1106 370 Future Volume (veh/h) 444 517 316 96 564 171 331 1047 68 192 1106 370 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1824 1863 1863 1863 Adj Flow Rate, veh/h 467 544 0 101 594 0 348 1102 68 202 1164 0 Adj No. of Lanes 221121220221 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 222222222222 Cap, veh/h 516 907 406 286 619 277 736 1602 99 528 1593 713 Arrive On Green 0.15 0.26 0.00 0.07 0.17 0.00 0.08 0.47 0.47 0.12 0.90 0.00 Sat Flow, veh/h 3442 3539 1583 1774 3539 1583 3442 3383 209 3442 3539 1583 Grp Volume(v), veh/h 467 544 0 101 594 0 348 576 594 202 1164 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1583 1774 1770 1583 1721 1770 1822 1721 1770 1583 Q Serve(g_s), s 16.0 16.2 0.0 5.5 20.0 0.0 6.1 30.5 30.5 3.7 11.5 0.0 Cycle Q Clear(g_c), s 16.0 16.2 0.0 5.5 20.0 0.0 6.1 30.5 30.5 3.7 11.5 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 1.00 Lane Grp Cap(c), veh/h 516 907 406 286 619 277 736 838 863 528 1593 713 V/C Ratio(X) 0.90 0.60 0.00 0.35 0.96 0.00 0.47 0.69 0.69 0.38 0.73 0.00 Avail Cap(c_a), veh/h 516 907 406 297 619 277 967 838 863 839 1593 713 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 50.2 39.2 0.0 36.6 49.1 0.0 14.8 24.6 24.7 18.1 3.9 0.0 Incr Delay (d2), s/veh 19.4 1.1 0.0 0.7 26.3 0.0 0.5 4.6 4.5 0.5 3.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 9.0 8.1 0.0 2.7 12.0 0.0 2.9 16.0 16.4 1.7 5.5 0.0 LnGrp Delay(d),s/veh 69.5 40.3 0.0 37.3 75.3 0.0 15.3 29.2 29.1 18.6 6.8 0.0 LnGrp LOS E D D E B C C B A Approach Vol, veh/h 1011 695 1518 1366 Approach Delay, s/veh 53.8 69.8 26.0 8.6 Approach LOS D E C A Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 13.0 59.0 12.2 35.8 10.2 61.8 22.0 26.0 Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 5.0 6.0 Max Green Setting (Gmax), s 17.0 45.0 8.0 29.0 17.0 45.0 17.0 20.0 Max Q Clear Time (g_c+I1), s 8.1 13.5 7.5 18.2 5.7 32.5 18.0 22.0 Green Ext Time (p_c), s 0.9 12.2 0.0 3.5 0.5 7.6 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 33.6 HCM 2010 LOS C Notes 34 Timing Report, Sorted By Phase 95: Timberline & Horsetooth short background pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 5 Phase Number 12345678 Movement NBL SBTL WBL EBT SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 21 51 13 35 21 51 22 26 Maximum Split (%) 17.5% 42.5% 10.8% 29.2% 17.5% 42.5% 18.3% 21.7% Minimum Split (s) 11 29 11 30 11 32.5 11 29 Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5 All-Red Time (s) 1 1.5 2 1.5 1 1.5 2 1.5 Minimum Initial (s) 4 10 4 10 4 10 4 10 Vehicle Extension (s) 33333333 Minimum Gap (s) 33343334 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 16 17 19 16 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 87.5 108.5 39.5 52.5 87.5 108.5 39.5 61.5 End Time (s) 108.5 39.5 52.5 87.5 108.5 39.5 61.5 87.5 Yield/Force Off (s) 104.5 33.5 47.5 81.5 104.5 33.5 56.5 81.5 Yield/Force Off 170(s) 104.5 17.5 47.5 64.5 104.5 14.5 56.5 65.5 Local Start Time (s) 54 75 6 19 54 75 6 28 Local Yield (s) 71 0 14 48 71 0 23 48 Local Yield 170(s) 71 104 14 31 71 101 23 32 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 95 Offset: 33.5 (28%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 95: Timberline & Horsetooth 35 HCM 2010 TWSC 8: Timberline & Danfield/Lambkin short background am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 19.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 25 20 0 39 81 1589 125 41 1289 6 Future Vol, veh/h 0 0 25 20 0 39 81 1589 125 41 1289 6 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 0 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 28 23 0 44 92 1806 142 47 1465 7 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2648 3693 736 2887 3626 974 1472 0 0 1948 0 0 Stage 1 1561 1561 - 2061 2061 - - - - - - - Stage 2 1087 2132 - 826 1565 - - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 11 5 361 ~ 7 5 251 454 - - 297 - - Stage 1 117 171 - 56 96 - - - - - - - Stage 2 231 88 - 332 170 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 7 3 361 ~ 5 3 251 454 - - 297 - - Mov Cap-2 Maneuver 7 3 - ~ 5 3 - - - - - - - Stage 1 93 144 - 45 77 - - - - - - - Stage 2 152 70 - 257 143 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 15.8 $ 1023.3 0.7 0.6 HCM LOS C F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 454 - - 361 5 251 297 - - HCM Lane V/C Ratio 0.203 - - 0.079 4.545 0.177 0.157 - - HCM Control Delay (s) 14.9 - - 15.8$ 2975 22.4 19.4 - - HCM Lane LOS B - - C F C C - - HCM 95th %tile Q(veh) 0.8 - - 0.3 4.2 0.6 0.5 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 36 HCM 2010 TWSC 7: Timberline & Danfield/Lambkin short background pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 6.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 86 9 0 13 29 1678 23 14 1664 3 Future Vol, veh/h 0 0 86 9 0 13 29 1678 23 14 1664 3 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 0 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 96 10 0 14 32 1864 26 16 1849 3 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2879 3836 926 2898 3825 945 1852 0 0 1890 0 0 Stage 1 1882 1882 - 1942 1942 - - - - - - - Stage 2 997 1954 - 956 1883 - - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 7 4 271 ~ 7 4 263 323 - - 312 - - Stage 1 73 118 - 67 110 - - - - - - - Stage 2 262 109 - 277 118 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 6 3 271 ~ 4 3 263 323 - - 312 - - Mov Cap-2 Maneuver 6 3 - ~ 4 3 - - - - - - - Stage 1 66 112 - 60 99 - - - - - - - Stage 2 223 98 - 170 112 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 25.3 $ 954 0.3 0.1 HCM LOS D F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 323 - - 271 4 263 312 - - HCM Lane V/C Ratio 0.1 - - 0.353 2.5 0.055 0.05 - - HCM Control Delay (s) 17.4 - - 25.$3 2303.8 19.5 17.1 - - HCM Lane LOS C - - D F C C - - HCM 95th %tile Q(veh) 0.3 - - 1.5 2.3 0.2 0.2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 37 HCM 2010 Signalized Intersection Summary 137: Timberline & Vermont short background am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 13 73 7 111 40 1527 61 125 1261 60 Future Volume (veh/h) 13 0 13 73 7 111 40 1527 61 125 1261 60 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 0.97 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1824 1824 1937 1937 1863 1863 1824 1863 1863 1824 Adj Flow Rate, veh/h 15 0 0 85 8 32 47 1776 71 145 1466 67 Adj No. of Lanes 110011120120 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 222222222222 Cap, veh/h 138 210 0 216 14 181 313 2511 100 318 2539 116 Arrive On Green 0.11 0.00 0.00 0.11 0.11 0.11 0.05 0.96 0.96 0.05 0.74 0.74 Sat Flow, veh/h 1352 1863 0 1357 128 1603 1774 3467 138 1774 3447 157 Grp Volume(v), veh/h 15 0 0 93 0 32 47 901 946 145 751 782 Grp Sat Flow(s),veh/h/ln 1352 1863 0 1485 0 1603 1774 1770 1835 1774 1770 1835 Q Serve(g_s), s 1.2 0.0 0.0 6.5 0.0 2.0 0.7 6.4 6.6 2.2 21.3 21.5 Cycle Q Clear(g_c), s 7.7 0.0 0.0 6.5 0.0 2.0 0.7 6.4 6.6 2.2 21.3 21.5 Prop In Lane 1.00 0.00 0.91 1.00 1.00 0.08 1.00 0.09 Lane Grp Cap(c), veh/h 138 210 0 230 0 181 313 1282 1329 318 1304 1352 V/C Ratio(X) 0.11 0.00 0.00 0.40 0.00 0.18 0.15 0.70 0.71 0.46 0.58 0.58 Avail Cap(c_a), veh/h 299 432 0 407 0 372 377 1282 1329 505 1304 1352 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.8 0.0 0.0 46.2 0.0 44.2 5.3 0.7 0.7 3.5 6.6 6.7 Incr Delay (d2), s/veh 0.3 0.0 0.0 1.1 0.0 0.5 0.2 3.2 3.3 1.0 1.9 1.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.0 2.8 0.0 0.9 0.4 3.4 3.5 1.1 10.9 11.3 LnGrp Delay(d),s/veh 50.2 0.0 0.0 47.3 0.0 44.6 5.5 3.9 3.9 4.5 8.5 8.5 LnGrp LOS D D D AAAAAA Approach Vol, veh/h 15 125 1894 1678 Approach Delay, s/veh 50.2 46.6 4.0 8.1 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.0 86.0 16.9 8.4 84.7 16.9 Change Period (Y+Rc), s 4.0 6.0 5.5 4.0 6.0 5.5 Max Green Setting (Gmax), s 7.0 63.0 24.5 16.0 54.0 24.5 Max Q Clear Time (g_c+I1), s 2.7 23.5 9.7 4.2 8.6 8.5 Green Ext Time (p_c), s 0.0 23.5 0.3 0.3 25.3 0.3 Intersection Summary HCM 2010 Ctrl Delay 7.5 HCM 2010 LOS A 38 Timing Report, Sorted By Phase 137: Timberline & Vermont short background am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 7 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 69 30 20 60 30 Maximum Split (%) 10.0% 62.7% 27.3% 18.2% 54.5% 27.3% Minimum Split (s) 11 23 28.5 11 23 29.5 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 1 1.5 2.5 1 1.5 2.5 Minimum Initial (s) 4 10 2 4 10 4 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 16 10 17 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 47 58 17 47 67 17 End Time (s) 58 17 47 67 17 47 Yield/Force Off (s) 54 11 41.5 63 11 41.5 Yield/Force Off 170(s) 54 1 25.5 63 1 24.5 Local Start Time (s) 30 41 0 30 50 0 Local Yield (s) 37 104 24.5 46 104 24.5 Local Yield 170(s) 37 94 8.5 46 94 7.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 100 Offset: 17 (15%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 137: Timberline & Vermont 39 HCM 2010 Signalized Intersection Summary 137: Timberline & Vermont short background pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 78 6 62 37 5 54 11 1610 70 119 1582 11 Future Volume (veh/h) 78 6 62 37 5 54 11 1610 70 119 1582 11 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1824 1824 1937 1937 1863 1863 1824 1863 1863 1824 Adj Flow Rate, veh/h 81 6 13 39 5 5 11 1677 70 124 1648 10 Adj No. of Lanes 110011120120 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 222222222222 Cap, veh/h 180 62 135 201 23 195 258 2542 106 335 2730 17 Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.04 1.00 1.00 0.04 0.76 0.76 Sat Flow, veh/h 1396 519 1124 1203 189 1620 1774 3463 144 1774 3606 22 Grp Volume(v), veh/h 81 0 19 44 0 5 11 853 894 124 808 850 Grp Sat Flow(s),veh/h/ln 1396 0 1643 1392 0 1620 1774 1770 1837 1774 1770 1858 Q Serve(g_s), s 6.8 0.0 1.2 2.9 0.0 0.3 0.2 0.0 0.0 1.9 24.5 24.6 Cycle Q Clear(g_c), s 10.9 0.0 1.2 4.1 0.0 0.3 0.2 0.0 0.0 1.9 24.5 24.6 Prop In Lane 1.00 0.68 0.89 1.00 1.00 0.08 1.00 0.01 Lane Grp Cap(c), veh/h 180 0 198 224 0 195 258 1299 1348 335 1340 1407 V/C Ratio(X) 0.45 0.00 0.10 0.20 0.00 0.03 0.04 0.66 0.66 0.37 0.60 0.60 Avail Cap(c_a), veh/h 297 0 335 348 0 331 343 1299 1348 439 1340 1407 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 53.2 0.0 47.0 48.6 0.0 46.6 5.6 0.0 0.0 2.9 6.5 6.5 Incr Delay (d2), s/veh 1.8 0.0 0.2 0.4 0.0 0.1 0.1 2.6 2.6 0.7 2.0 1.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 0.0 0.6 1.4 0.0 0.1 0.1 0.9 1.0 1.0 12.4 13.0 LnGrp Delay(d),s/veh 55.0 0.0 47.2 49.0 0.0 46.6 5.7 2.6 2.6 3.5 8.5 8.5 LnGrp LOS D D D D AAAAAA Approach Vol, veh/h 100 49 1758 1782 Approach Delay, s/veh 53.5 48.8 2.6 8.2 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.2 95.8 18.9 8.0 93.1 18.9 Change Period (Y+Rc), s 4.0 6.0 5.5 4.0 6.0 5.5 Max Green Setting (Gmax), s 7.0 74.0 23.5 11.0 70.0 23.5 Max Q Clear Time (g_c+I1), s 2.2 26.6 12.9 3.9 2.0 6.1 Green Ext Time (p_c), s 0.0 26.0 0.3 0.2 30.4 0.4 Intersection Summary HCM 2010 Ctrl Delay 7.3 HCM 2010 LOS A Notes 40 Timing Report, Sorted By Phase 137: Timberline & Vermont short background pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 8 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 80 29 15 76 29 Maximum Split (%) 9.2% 66.7% 24.2% 12.5% 63.3% 24.2% Minimum Split (s) 11 23 28.5 11 23 29.5 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 1 1.5 2.5 1 1.5 2.5 Minimum Initial (s) 4 10 4 4 10 4 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 16 10 17 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 83 94 54 83 98 54 End Time (s) 94 54 83 98 54 83 Yield/Force Off (s) 90 48 77.5 94 48 77.5 Yield/Force Off 170(s) 90 38 61.5 94 38 60.5 Local Start Time (s) 35 46 6 35 50 6 Local Yield (s) 42 0 29.5 46 0 29.5 Local Yield 170(s) 42 110 13.5 46 110 12.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 48 (40%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 137: Timberline & Vermont 41 HCM 2010 TWSC 5: Automation/PRPA Access & Horsetooth short background am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 1 Intersection Int Delay, s/veh 0.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 1131 158 26 600 0 16 0 18 0 0 0 Future Vol, veh/h 0 1131 158 26 600 0 16 0 18 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 1331 186 31 706 0 19 0 21 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 706 0 0 1516 0 0 1838 2191 758 1432 2283 353 Stage 1 - - - - - - 1424 1424 - 767 767 - Stage 2 - - - - - - 414 767 - 665 1516 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 888 - - 437 - - 47 45 350 95 39 643 Stage 1 - - - - - - 143 200 - 361 410 - Stage 2 - - - - - - 586 410 - 416 180 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 888 - - 437 - - 44 42 350 84 36 643 Mov Cap-2 Maneuver - - - - - - 116 137 - 84 36 - Stage 1 - - - - - - 143 200 - 361 381 - Stage 2 - - - - - - 544 381 - 391 180 - Approach EB WB NB SB HCM Control Delay, s 0 0.6 28.2 0 HCM LOS D A Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 116 350 888 - - 437 - - - HCM Lane V/C Ratio 0.162 0.061 - - - 0.07 - - - HCM Control Delay (s) 42 15.9 0 - - 13.9 - - 0 HCM Lane LOS E C A - - B - - A HCM 95th %tile Q(veh) 0.6 0.2 0 - - 0.2 - - - 42 HCM 2010 TWSC 4: Automation/PRPA Access & Horsetooth short background pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 1 Intersection Int Delay, s/veh 8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 1162 50 9 1256 0 107 0 115 0 0 0 Future Vol, veh/h 0 1162 50 9 1256 0 107 0 115 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 1320 57 10 1427 0 122 0 131 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1427 0 0 1377 0 0 2083 2797 689 2108 2825 714 Stage 1 - - - - - - 1349 1349 - 1448 1448 - Stage 2 - - - - - - 734 1448 - 660 1377 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 473 - - 494 - - ~ 31 18 388 29 17 374 Stage 1 - - - - - - 159 217 - 138 195 - Stage 2 - - - - - - 378 195 - 418 211 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 473 - - 494 - - ~ 31 18 388 19 17 374 Mov Cap-2 Maneuver - - - - - - ~ 113 101 - 19 17 - Stage 1 - - - - - - 159 217 - 138 191 - Stage 2 - - - - - - 370 191 - 277 211 - Approach EB WB NB SB HCM Control Delay, s 0 0.1 96.2 0 HCM LOS F A Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 113 388 473 - - 494 - - - HCM Lane V/C Ratio 1.076 0.337 - - - 0.021 - - - HCM Control Delay (s) 179.3 18.9 0 - - 12.4 - - 0 HCM Lane LOS F C A - - B - - A HCM 95th %tile Q(veh) 7.3 1.5 0 - - 0.1 - - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 43 APPENDIX E 44 HCM 2010 Signalized Intersection Summary 95: Timberline & Horsetooth short total am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 454 437 263 141 437 219 230 1210 62 134 895 285 Future Volume (veh/h) 454 437 263 141 437 219 230 1210 62 134 895 285 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1824 1863 1863 1863 Adj Flow Rate, veh/h 516 497 0 160 497 0 261 1375 67 152 1017 0 Adj No. of Lanes 221121220221 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 222222222222 Cap, veh/h 532 901 403 297 579 259 363 1535 75 244 1461 654 Arrive On Green 0.15 0.25 0.00 0.06 0.16 0.00 0.11 0.45 0.45 0.02 0.14 0.00 Sat Flow, veh/h 3442 3539 1583 1774 3539 1583 3442 3433 167 3442 3539 1583 Grp Volume(v), veh/h 516 497 0 160 497 0 261 707 735 152 1017 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1583 1774 1770 1583 1721 1770 1830 1721 1770 1583 Q Serve(g_s), s 16.4 13.4 0.0 7.0 15.0 0.0 8.1 40.5 40.8 4.8 30.2 0.0 Cycle Q Clear(g_c), s 16.4 13.4 0.0 7.0 15.0 0.0 8.1 40.5 40.8 4.8 30.2 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 1.00 Lane Grp Cap(c), veh/h 532 901 403 297 579 259 363 791 819 244 1461 654 V/C Ratio(X) 0.97 0.55 0.00 0.54 0.86 0.00 0.72 0.89 0.90 0.62 0.70 0.00 Avail Cap(c_a), veh/h 532 901 403 297 579 259 563 791 819 282 1461 654 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 46.2 35.6 0.0 36.8 44.8 0.0 47.6 28.0 28.1 52.3 40.9 0.0 Incr Delay (d2), s/veh 31.4 0.7 0.0 1.9 12.3 0.0 2.7 14.6 14.6 3.3 2.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 10.1 6.6 0.0 1.1 8.3 0.0 4.0 22.9 23.9 2.4 15.4 0.0 LnGrp Delay(d),s/veh 77.6 36.3 0.0 38.7 57.0 0.0 50.3 42.6 42.7 55.6 43.7 0.0 LnGrp LOS E D D E D D D E D Approach Vol, veh/h 1013 657 1703 1169 Approach Delay, s/veh 57.4 52.6 43.8 45.2 Approach LOS E D D D Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 15.6 50.4 11.0 33.0 11.8 54.2 21.0 23.0 Change Period (Y+Rc), s 5.0 6.0 5.0 6.0 5.0 6.0 5.0 6.0 Max Green Setting (Gmax), s 17.0 38.0 6.0 27.0 8.0 47.0 16.0 17.0 Max Q Clear Time (g_c+I1), s 10.1 32.2 9.0 15.4 6.8 42.8 18.4 17.0 Green Ext Time (p_c), s 0.5 4.4 0.0 3.1 0.1 3.3 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 48.5 HCM 2010 LOS D Notes 45 Timing Report, Sorted By Phase 95: Timberline & Horsetooth short total am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 5 Phase Number 12345678 Movement NBL SBT WBL EBT SBL NBT EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 22 44 11 33 13 53 21 23 Maximum Split (%) 20.0% 40.0% 10.0% 30.0% 11.8% 48.2% 19.1% 20.9% Minimum Split (s) 11 29 11 30 11 32.5 11 29 Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5 All-Red Time (s) 2 1.5 2 1.5 2 1.5 2 1.5 Minimum Initial (s) 4 10 4 10 4 10 4 10 Vehicle Extension (s) 33333333 Minimum Gap (s) 33343334 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 16 17 19 16 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes No Yes Yes Yes No Start Time (s) 109.5 21.5 65.5 76.5 109.5 12.5 65.5 86.5 End Time (s) 21.5 65.5 76.5 109.5 12.5 65.5 86.5 109.5 Yield/Force Off (s) 16.5 59.5 71.5 103.5 7.5 59.5 81.5 103.5 Yield/Force Off 170(s) 16.5 43.5 71.5 86.5 7.5 40.5 81.5 87.5 Local Start Time (s) 50 72 6 17 50 63 6 27 Local Yield (s) 67 0 12 44 58 0 22 44 Local Yield 170(s) 67 94 12 27 58 91 22 28 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 115 Offset: 59.5 (54%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow Splits and Phases: 95: Timberline & Horsetooth 46 HCM 2010 Signalized Intersection Summary 95: Timberline & Horsetooth short total pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 445 519 319 96 566 171 333 1048 68 202 1119 374 Future Volume (veh/h) 445 519 319 96 566 171 333 1048 68 202 1119 374 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1824 1863 1863 1863 Adj Flow Rate, veh/h 468 546 0 101 596 0 351 1103 68 213 1178 0 Adj No. of Lanes 221121220221 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 222222222222 Cap, veh/h 516 907 406 285 619 277 729 1596 98 532 1591 712 Arrive On Green 0.15 0.26 0.00 0.07 0.17 0.00 0.08 0.47 0.47 0.12 0.90 0.00 Sat Flow, veh/h 3442 3539 1583 1774 3539 1583 3442 3383 208 3442 3539 1583 Grp Volume(v), veh/h 468 546 0 101 596 0 351 577 594 213 1178 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1583 1774 1770 1583 1721 1770 1822 1721 1770 1583 Q Serve(g_s), s 16.1 16.3 0.0 5.5 20.0 0.0 6.2 30.7 30.7 3.9 12.1 0.0 Cycle Q Clear(g_c), s 16.1 16.3 0.0 5.5 20.0 0.0 6.2 30.7 30.7 3.9 12.1 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 1.00 Lane Grp Cap(c), veh/h 516 907 406 285 619 277 729 835 859 532 1591 712 V/C Ratio(X) 0.91 0.60 0.00 0.35 0.96 0.00 0.48 0.69 0.69 0.40 0.74 0.00 Avail Cap(c_a), veh/h 516 907 406 296 619 277 957 835 859 836 1591 712 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 50.2 39.2 0.0 36.6 49.1 0.0 15.0 24.8 24.9 18.2 3.9 0.0 Incr Delay (d2), s/veh 19.7 1.1 0.0 0.7 27.0 0.0 0.5 4.7 4.5 0.5 3.1 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 9.0 8.1 0.0 2.7 12.1 0.0 3.0 16.0 16.4 1.8 5.9 0.0 LnGrp Delay(d),s/veh 69.8 40.3 0.0 37.3 76.1 0.0 15.5 29.5 29.4 18.7 7.1 0.0 LnGrp LOS E D D E B C C B A Approach Vol, veh/h 1014 697 1522 1391 Approach Delay, s/veh 54.0 70.5 26.2 8.9 Approach LOS D E C A Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 13.1 58.9 12.2 35.8 10.4 61.6 22.0 26.0 Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 5.0 6.0 Max Green Setting (Gmax), s 17.0 45.0 8.0 29.0 17.0 45.0 17.0 20.0 Max Q Clear Time (g_c+I1), s 8.2 14.1 7.5 18.3 5.9 32.7 18.1 22.0 Green Ext Time (p_c), s 0.9 12.3 0.0 3.5 0.5 7.6 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 33.8 HCM 2010 LOS C Notes 47 Timing Report, Sorted By Phase 95: Timberline & Horsetooth short total pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 5 Phase Number 12345678 Movement NBL SBTL WBL EBT SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 21 51 13 35 21 51 22 26 Maximum Split (%) 17.5% 42.5% 10.8% 29.2% 17.5% 42.5% 18.3% 21.7% Minimum Split (s) 11 29 11 30 11 32.5 11 29 Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5 All-Red Time (s) 1 1.5 2 1.5 1 1.5 2 1.5 Minimum Initial (s) 4 10 4 10 4 10 4 10 Vehicle Extension (s) 33333333 Minimum Gap (s) 33343334 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 16 17 19 16 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 87.5 108.5 39.5 52.5 87.5 108.5 39.5 61.5 End Time (s) 108.5 39.5 52.5 87.5 108.5 39.5 61.5 87.5 Yield/Force Off (s) 104.5 33.5 47.5 81.5 104.5 33.5 56.5 81.5 Yield/Force Off 170(s) 104.5 17.5 47.5 64.5 104.5 14.5 56.5 65.5 Local Start Time (s) 54 75 6 19 54 75 6 28 Local Yield (s) 71 0 14 48 71 0 23 48 Local Yield 170(s) 71 104 14 31 71 101 23 32 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 95 Offset: 33.5 (28%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 95: Timberline & Horsetooth 48 HCM 2010 TWSC 8: Timberline & Danfield/Lambkin short total am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 19.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 28 20 0 39 90 1589 125 41 1289 17 Future Vol, veh/h 0 0 28 20 0 39 90 1589 125 41 1289 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 0 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 32 23 0 44 102 1806 142 47 1465 19 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2675 3720 742 2907 3658 974 1484 0 0 1948 0 0 Stage 1 1568 1568 - 2081 2081 - - - - - - - Stage 2 1107 2152 - 826 1577 - - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 11 4 358 ~ 7 5 251 449 - - 297 - - Stage 1 116 170 - 55 94 - - - - - - - Stage 2 224 86 - 332 168 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 7 3 358 ~ 5 3 251 449 - - 297 - - Mov Cap-2 Maneuver 7 3 - ~ 5 3 - - - - - - - Stage 1 90 143 - 43 73 - - - - - - - Stage 2 143 66 - 255 141 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 16 $ 1023.3 0.8 0.6 HCM LOS C F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 449 - - 358 5 251 297 - - HCM Lane V/C Ratio 0.228 - - 0.089 4.545 0.177 0.157 - - HCM Control Delay (s) 15.4 - - 16$ 2975 22.4 19.4 - - HCM Lane LOS C - - C F C C - - HCM 95th %tile Q(veh) 0.9 - - 0.3 4.2 0.6 0.5 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 49 HCM 2010 TWSC 7: Timberline & Danfield/Lambkin short total pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 9.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 113 9 0 13 31 1678 23 14 1664 5 Future Vol, veh/h 0 0 113 9 0 13 31 1678 23 14 1664 5 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 0 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 126 10 0 14 34 1864 26 16 1849 6 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2884 3842 927 2902 3832 945 1854 0 0 1890 0 0 Stage 1 1883 1883 - 1946 1946 - - - - - - - Stage 2 1001 1959 - 956 1886 - - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 7 4 270 ~ 7 4 263 323 - - 312 - - Stage 1 73 118 - 67 110 - - - - - - - Stage 2 260 108 - 277 118 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 6 3 270 ~ 3 3 263 323 - - 312 - - Mov Cap-2 Maneuver 6 3 - ~ 3 3 - - - - - - - Stage 1 65 112 - 60 98 - - - - - - - Stage 2 220 97 - 141 112 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 29.4 $ 1308.6 0.3 0.1 HCM LOS D F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 323 - - 270 3 263 312 - - HCM Lane V/C Ratio 0.107 - - 0.465 3.333 0.055 0.05 - - HCM Control Delay (s) 17.5 - - 29.$4 3170.7 19.5 17.1 - - HCM Lane LOS C - - D F C C - - HCM 95th %tile Q(veh) 0.4 - - 2.3 2.4 0.2 0.2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 50 HCM 2010 Signalized Intersection Summary 137: Timberline & Vermont short total am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 15 0 13 73 7 111 40 1527 61 125 1261 66 Future Volume (veh/h) 15 0 13 73 7 111 40 1527 61 125 1261 66 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 0.97 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1824 1824 1937 1937 1863 1863 1824 1863 1863 1824 Adj Flow Rate, veh/h 17 0 0 85 8 32 47 1776 71 145 1466 74 Adj No. of Lanes 110011120120 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 222222222222 Cap, veh/h 140 213 0 217 15 183 311 2506 100 333 2522 127 Arrive On Green 0.11 0.00 0.00 0.11 0.11 0.11 0.07 1.00 1.00 0.05 0.74 0.74 Sat Flow, veh/h 1352 1863 0 1356 129 1604 1774 3467 138 1774 3429 173 Grp Volume(v), veh/h 17 0 0 93 0 32 47 901 946 145 754 786 Grp Sat Flow(s),veh/h/ln 1352 1863 0 1485 0 1604 1774 1770 1835 1774 1770 1832 Q Serve(g_s), s 1.3 0.0 0.0 6.5 0.0 2.0 0.7 0.0 0.0 2.2 21.6 21.8 Cycle Q Clear(g_c), s 7.8 0.0 0.0 6.5 0.0 2.0 0.7 0.0 0.0 2.2 21.6 21.8 Prop In Lane 1.00 0.00 0.91 1.00 1.00 0.08 1.00 0.09 Lane Grp Cap(c), veh/h 140 213 0 232 0 183 311 1279 1326 333 1301 1347 V/C Ratio(X) 0.12 0.00 0.00 0.40 0.00 0.17 0.15 0.70 0.71 0.44 0.58 0.58 Avail Cap(c_a), veh/h 299 432 0 407 0 372 374 1279 1326 520 1301 1347 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.7 0.0 0.0 46.0 0.0 44.0 5.3 0.0 0.0 3.0 6.7 6.7 Incr Delay (d2), s/veh 0.4 0.0 0.0 1.1 0.0 0.4 0.2 3.3 3.3 0.9 1.9 1.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.0 2.7 0.0 0.9 0.3 1.2 1.2 1.1 11.2 11.6 LnGrp Delay(d),s/veh 50.1 0.0 0.0 47.2 0.0 44.5 5.5 3.3 3.3 3.9 8.6 8.6 LnGrp LOS D D D AAAAAA Approach Vol, veh/h 17 125 1894 1685 Approach Delay, s/veh 50.1 46.5 3.3 8.2 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.0 85.9 17.1 8.4 84.5 17.1 Change Period (Y+Rc), s 4.0 6.0 5.5 4.0 6.0 5.5 Max Green Setting (Gmax), s 7.0 63.0 24.5 16.0 54.0 24.5 Max Q Clear Time (g_c+I1), s 2.7 23.8 9.8 4.2 2.0 8.5 Green Ext Time (p_c), s 0.0 23.5 0.3 0.3 27.2 0.4 Intersection Summary HCM 2010 Ctrl Delay 7.2 HCM 2010 LOS A 51 Timing Report, Sorted By Phase 137: Timberline & Vermont short total am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 7 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 69 30 20 60 30 Maximum Split (%) 10.0% 62.7% 27.3% 18.2% 54.5% 27.3% Minimum Split (s) 11 23 28.5 11 23 29.5 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 1 1.5 2.5 1 1.5 2.5 Minimum Initial (s) 4 10 2 4 10 4 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 16 10 17 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 47 58 17 47 67 17 End Time (s) 58 17 47 67 17 47 Yield/Force Off (s) 54 11 41.5 63 11 41.5 Yield/Force Off 170(s) 54 1 25.5 63 1 24.5 Local Start Time (s) 30 41 0 30 50 0 Local Yield (s) 37 104 24.5 46 104 24.5 Local Yield 170(s) 37 94 8.5 46 94 7.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 100 Offset: 17 (15%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 137: Timberline & Vermont 52 HCM 2010 Signalized Intersection Summary 137: Timberline & Vermont short total pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 94 6 62 37 5 54 11 1610 70 119 1584 12 Future Volume (veh/h) 94 6 62 37 5 54 11 1610 70 119 1584 12 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1824 1824 1937 1937 1863 1863 1824 1863 1863 1824 Adj Flow Rate, veh/h 98 6 13 39 5 5 11 1677 70 124 1650 11 Adj No. of Lanes 110011120120 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 222222222222 Cap, veh/h 196 68 148 216 25 213 251 2501 104 333 2688 18 Arrive On Green 0.13 0.13 0.13 0.13 0.13 0.13 0.04 1.00 1.00 0.04 0.75 0.75 Sat Flow, veh/h 1396 519 1124 1214 187 1620 1774 3463 144 1774 3603 24 Grp Volume(v), veh/h 98 0 19 44 0 5 11 853 894 124 810 851 Grp Sat Flow(s),veh/h/ln 1396 0 1643 1401 0 1620 1774 1770 1837 1774 1770 1858 Q Serve(g_s), s 8.2 0.0 1.2 2.9 0.0 0.3 0.2 0.0 0.0 2.0 25.7 25.8 Cycle Q Clear(g_c), s 12.3 0.0 1.2 4.1 0.0 0.3 0.2 0.0 0.0 2.0 25.7 25.8 Prop In Lane 1.00 0.68 0.89 1.00 1.00 0.08 1.00 0.01 Lane Grp Cap(c), veh/h 196 0 216 241 0 213 251 1278 1327 333 1320 1386 V/C Ratio(X) 0.50 0.00 0.09 0.18 0.00 0.02 0.04 0.67 0.67 0.37 0.61 0.61 Avail Cap(c_a), veh/h 286 0 322 336 0 317 337 1278 1327 436 1320 1386 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 52.6 0.0 45.8 47.4 0.0 45.4 6.2 0.0 0.0 3.2 7.1 7.1 Incr Delay (d2), s/veh 2.0 0.0 0.2 0.4 0.0 0.0 0.1 2.8 2.7 0.7 2.1 2.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.3 0.0 0.6 1.3 0.0 0.1 0.1 1.0 1.0 1.0 13.2 13.8 LnGrp Delay(d),s/veh 54.5 0.0 46.0 47.7 0.0 45.5 6.3 2.8 2.7 3.8 9.3 9.2 LnGrp LOS D D D D AAAAAA Approach Vol, veh/h 117 49 1758 1785 Approach Delay, s/veh 53.2 47.5 2.8 8.9 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.2 94.5 20.3 8.1 91.7 20.3 Change Period (Y+Rc), s 4.0 6.0 5.5 4.0 6.0 5.5 Max Green Setting (Gmax), s 7.0 75.0 22.5 11.0 71.0 22.5 Max Q Clear Time (g_c+I1), s 2.2 27.8 14.3 4.0 2.0 6.1 Green Ext Time (p_c), s 0.0 26.0 0.3 0.2 30.6 0.4 Intersection Summary HCM 2010 Ctrl Delay 7.9 HCM 2010 LOS A Notes 53 Timing Report, Sorted By Phase 137: Timberline & Vermont short total pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 8 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 81 28 15 77 28 Maximum Split (%) 9.2% 67.5% 23.3% 12.5% 64.2% 23.3% Minimum Split (s) 11 23 28.5 11 23 29.5 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 1 1.5 2.5 1 1.5 2.5 Minimum Initial (s) 4 10 4 4 10 4 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 16 10 17 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 82 93 54 82 97 54 End Time (s) 93 54 82 97 54 82 Yield/Force Off (s) 89 48 76.5 93 48 76.5 Yield/Force Off 170(s) 89 38 60.5 93 38 59.5 Local Start Time (s) 34 45 6 34 49 6 Local Yield (s) 41 0 28.5 45 0 28.5 Local Yield 170(s) 41 110 12.5 45 110 11.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 48 (40%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 137: Timberline & Vermont 54 HCM 2010 TWSC 5: Automation/PRPA Access & Horsetooth short total am City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report Page 1 Intersection Int Delay, s/veh 0.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 36 1135 158 26 900 36 16 0 18 1 0 5 Future Vol, veh/h 36 1135 158 26 900 36 16 0 18 1 0 5 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 42 1335 186 31 1059 42 19 0 21 1 0 6 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1101 0 0 1521 0 0 2104 2675 761 1893 2747 551 Stage 1 - - - - - - 1513 1513 - 1141 1141 - Stage 2 - - - - - - 591 1162 - 752 1606 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 630 - - 435 - - 29 22 348 43 20 478 Stage 1 - - - - - - 125 181 - 214 274 - Stage 2 - - - - - - 460 267 - 368 163 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 630 - - 435 - - 26 19 348 36 17 478 Mov Cap-2 Maneuver - - - - - - 90 93 - 36 17 - Stage 1 - - - - - - 117 169 - 200 254 - Stage 2 - - - - - - 422 248 - 323 152 - Approach EB WB NB SB HCM Control Delay, s 0.3 0.4 34.5 29 HCM LOS D D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 90 348 630 - - 435 - - 157 HCM Lane V/C Ratio 0.209 0.061 0.067 - - 0.07 - - 0.045 HCM Control Delay (s) 55.3 16 11.1 - - 13.9 - - 29 HCM Lane LOS F C B - - B - - D HCM 95th %tile Q(veh) 0.7 0.2 0.2 - - 0.2 - - 0.1 55 HCM 2010 TWSC 4: Automation/PRPA Access & Horsetooth short total pm City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report Page 1 Intersection Int Delay, s/veh 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 6 1163 50 9 1260 6 107 0 115 5 0 33 Future Vol, veh/h 6 1163 50 9 1260 6 107 0 115 5 0 33 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 1322 57 10 1432 7 122 0 131 6 0 38 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1439 0 0 1378 0 0 2100 2823 689 2130 2848 719 Stage 1 - - - - - - 1364 1364 - 1456 1456 - Stage 2 - - - - - - 736 1459 - 674 1392 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 468 - - 493 - - ~ 30 17 388 28 17 371 Stage 1 - - - - - - 155 214 - 136 193 - Stage 2 - - - - - - 377 192 - 410 207 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 468 - - 493 - - ~ 26 16 388 18 16 371 Mov Cap-2 Maneuver - - - - - - ~ 105 96 - 18 16 - Stage 1 - - - - - - 153 211 - 134 189 - Stage 2 - - - - - - 332 188 - 268 204 - Approach EB WB NB SB HCM Control Delay, s 0.1 0.1 112.5 62.2 HCM LOS F F Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 105 388 468 - - 493 - - 104 HCM Lane V/C Ratio 1.158 0.337 0.015 - - 0.021 - - 0.415 HCM Control Delay (s) 213.2 18.9 12.8 - - 12.5 - - 62.2 HCM Lane LOS F C B - - B - - F HCM 95th %tile Q(veh) 7.9 1.5 0 - - 0.1 - - 1.7 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 56 APPENDIX F 57 SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Platte River Power Authority TIS, Novmeber 2017 Automation Way Timberline Road Danfield Court Vermont Drive Horsetooth Road 58 Pedestrian LOS Worksheet Project Location Classification: School Walking Area Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Residential to the west Residential Minimum B B B C B 1 Actual A B A C B Proposed A B A C B Commercial/Residential to the north Commercial/ Residential Minimum B B B C B 2 Actual A B A B B Proposed A B A B B Fort Collins High School to the east Commercial/ Residential Minimum B B B C B 3 Actual A B C B B Proposed A B C B B Residential to the southeast Residential Minimum B B B C B 4 Actual A B C B B Proposed A B C B B Commercial to the south Commercial Minimum B B B C B 5 Actual A B B B B Proposed A B B B B Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed * Built under earlier street standards 59 SCALE: 1"=500' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Platte River Power Authority TIS, Novmeber 2017 Automation Way Timberline Road Danfield Court Vermont Drive Horsetooth Road 60 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C A A Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification Fort Collins High School 1 to the east Institutional B A A Powerline Trail to the 2 west Recreational B A A 3 4 61 POND HORSETOOTH ROAD TIMBERLINE ROAD DANFIELD COURT VEHICLE PARKING GARAGE B LEGEND CRUSHER FINES SITE FURNITURE LANDSCAPE BOULDERS SITE PLAN 0 25' 50' 100' 1603 Oakridge Drive Fort Collins, CO 80525 970-223-7577 SHEET 1 OF 1 NOVEMBER 14, 2017 PRELIMINARY DEVELOPMENT PLAN PLATTE RIVER POWER AUTHORITY REVISIONS: DATE: ____________________________ ______________ ____________________________ ______________ ____________________________ ______________ ____________________________ ______________ P.A. PLANTING AREA 9 PARKING COUNT EXISTING ZONING E - EMPLOYMENT PROPOSED LAND USE OFFICE MAX. BUILDING HEIGHT PERMITTED 4 STORIES BUILDING SQUARE FOOTAGE HEADQUARTERS 54,187 SF POOL CAR GARAGE 2,870 SF WAREHOUSE 9,800 SF MAINTENANCE SHOP/TRUCK WASH 6,800 SF SUBSTATION GARAGE 6,355 SF FLEET PARKING A 7,545 SF FLEET PARKING B 5,100 SF TOTAL 79,772 SF PARKING DATA VISITOR PARKING 29 SPACES (2 HANDICAP) EMPLOYEE PARKING 158 SPACES (6 HANDICAP) TOTAL 187 SPACES (8 HANDICAP) PARKING ALLOWED BICYCLE PARKING LAND USE TABLE 4 0/6 13/62 111/54 7/5 73/37 Vermont Drive 0/6 13/62 111/54 7/5 73/37 Vermont Drive 0/6 13/62 111/54 7/5 73/37 Vermont Drive 13/62 83/54 7/5 45/37 Vermont Drive