Loading...
HomeMy WebLinkAboutZIGGI'S COFFEE - FDP - FDP170030 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSREVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP COVER.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:21 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 VICINITY MAP 1" = 500' WEST TRILBY ROAD SOUTH COLLEGE AVENUE LYNN DRIVE VIVIAN STREET CONSTELLATION DRIVE KEVIN DRIVE NGS BENCHMARK "A 409" BENCHMARK: PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS N00°40'23"W, A DISTANCE OF 2646.40 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO. MONUMENTS FULLY DESCRIBED HEREIN. 17_13 COVER SHEET C1.0 SITE UTILITY PLANS FOR ZIGGI'S COFFEE - FORT COLLINS REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP NOTES.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:21 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 NOTES C1.1 STANDARD GRADING AND EROSION CONTROL NOTES: 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OF REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT S 36°01'02" W 260.98' REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP DEMOLITION PLAN.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:21 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 DEMOLITION PLAN C1.2 ZAH ---- N 0' 10' 20' 30' SCALE: 1"=10' DEMOLITION NOTES: 1. TREE REMOVAL/RELOCATION SHALL BE COORDINATED WITH LANDSCAPE PLANS AND OWNER'S REPRESENTATIVE. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND VERIFY THE EXTENTS OF REQUIRED DEMOLITION PRIOR TO CONSTRUCTION. ADDITIONAL SCOPE MAY BE REQUIRED THAN SHOWN HEREON. THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH STRUCTURAL MECHANICAL, ELECTRICAL, PLUMBING, LANDSCAPING AND ARCHITECTURAL DRAWINGS. 3. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR BURIED UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES PRIOR TO CONSTRUCTION. 4. THESE PLANS ARE BASED ON THE SURVEY BY FALCON SURVEYING DATED 08/14/17, AND BY THE FCLWD AS-BUILT PLANS DATED 12/3/03, PREPARED BY NORTH STAR DESIGN, INC. HCI ENGINEERING HAS NOT CONDUCTED ANY ON SITE INVESTIGATION FOR EXISTING UTILITIES. ADDITIONAL UTILITIES, IN USE OR ABANDONED, MIGHT EXIST ON, NEAR OR CROSSING THE SUBJECT PROPERTY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONDUCT ON SITE INVESTIGATION FOR UNKNOWN UTILITIES AND CONFIRM UTILITY LOCATIONS SHOWN HEREON. THE CONTRACTOR SHALL NOTIFY ENGINEER OF ANY STOP ENTER PRO. ACCESS AND EMERGENCY ACCESS EASEMENT STOP ENTER N=1,423,689.61 E=3,117,285.80 N=1,423,670.54 E=3,117,297.77 N=1,423,689.89 E=3,117,306.15 N=1,423,695.64 E=3,117,328.60 N=1,423,717.87 E=3,117,327.92 N=1,423,671.61 E=3,117,329.55 N=1,423,682.92 E=3,117,345.17 N=1,423,682.18 E=3,117,374.81 N=1,423,684.89 E=3,117,451.26 N=1,423,728.06 E=3,117,444.75 N=1,423,736.99 E=3,117,425.62 N=1,423,702.73 E=3,117,403.10 N=1,423,696.14 E=3,117,413.12 N=1,423,694.08 E=3,117,397.41 N=1,423,729.88 E=3,117,377.96 N=1,423,712.71 E=3,117,372.36 N=1,423,858.51 E=3,117,370.08 N=1,423,819.16 E=3,117,381.60 N=1,423,819.75 E=3,117,393.61 N=1,423,819.21 E=3,117,422.11 N=1,423,819.22 E=3,117,434.11 N=1,423,760.86 E=3,117,434.59 N=1,423,766.93 E=3,117,422.59 N=1,423,737.84 E=3,117,377.42 N=1,423,765.18 E=3,117,387.70 N=1,423,765.29 E=3,117,399.70 N=1,423,729.42 E=3,117,419.92 N=1,423,720.46 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN W W W W W W W W W W W W W W W W PRO. ELECTRIC TRANSFORMER CONTRACTOR TO VERIFY LOCATION & INVERTS OF EX. SSWR MAIN, SERVICES, CLEANOUT & STUB 188.55 L.F. 1.5" TYPE 'K' COPPER WATER SERVICE LINE PRO. 4" SSWR LINE 82.22 L.F. @ 2.0% SOUTH COLLEGE AVENUE (HIGHWAY 287) (R.O.W. REC. NO. 2004002682 & BOOK 1066 PAGE 184 & BOOK 1059 PAGE 402) WEST TRILBY ROAD (75.51' R.O.W.) LIMITS OF CONSTRUCTION PRO. GREASE INTERCEPTOR N=1,423,695.28 E=3,117,379.48 INV=5028.73 PRO. WATER SERVICE BEND N=1,423,711.47 E=3,117,254.58 PRO. WATER SERVICE BEND N=1,423,734.31 E=3,117,315.04 PRO. WATER SERVICE BEND N=1,423,734.54 E=3,117,389.62 PRO. WATER CONNECTION TO BUILDING N=1,423,719.44 E=3,117,414.08 CONNECT TO EX. 1.5" WATER SERVICE STUB CONTRACTOR TO VERIFY LOCATION N=1,423,692.54 STOP ENTER 5031 5032 5033 5034 5034 5034.09 5034.07 5034.16 5033.94 5033.98 5034.06 5033.68 5033.69 5033.88 5033.61 5033.56 5033.43 5033.62 5033.36 5033.50 5033.59 5034.27 5034.27 H.P. 5034.07 5034.06 5033.75 5033.60 5033.58 5033.12 5033.45 5033.03 5033.32 5033.22 5033.88 5033.93 5034.00 5033.39 5032.92 5032.93 5033.10 5033.39 5033.05 5033.02 5033.88 5033.88 5033.88 5033.88 5033 12.5% 11.2% 2.0% 2.0% 0.8% 6.3% 0.6% 1.0% 1.0% 1.0% 1.0% 1.0% 1.8% 1.1% 1.4% 0.8% WEST TRILBY ROAD (75.51' R.O.W.) SOUTH COLLEGE AVENUE (HIGHWAY 287) (R.O.W. REC. NO. 2004002682 & BOOK 1066 PAGE 184 & BOOK 1059 PAGE 402) 3 1.63 0.78 0.98 3 4 0.17 0.91 1.00 4 6 0.18 0.32 0.50 6 INFLOW C&G 2' CONCRETE V-PAN (TYP.) 2' CONCRETE V-PAN OUTFALL C&G 5032 5033 5034 5034 5034 5034 5033 5034 5034 TRIBUTARY AREA TO RAIN GARDEN PONDING LIMITS 70.33 LF 6" PVC C900 3.50 LF 6" SLOTTED PIPE WQCV WSE = 5032.62 PRO. 20.00' DRNG. ESMT. LID RAIN GARDEN ELEV. = 5032.12 CONNECT TO EX. 18" RCP W/ 24" (HS-25) NYLOPLAST MH W/ 3' Ø CONCRETE COLLAR 12" NYLOPLAST MH W/ HS-25 COVER CONNECTION FITTING 12" NYLOPLAST CLEANOUT W/ GRATE 6" NYLOPLAST CLEANOUT W/ WATER TIGHT LID 6" NYLOPLAST CLEANOUT W/ WATER TIGHT LID 19.50 LF 6" SLOTTED PIPE 39.51 LF - 6" PVC C900 4.78 LF 6" SLOTTED PIPE REVISIONS: Drawn By: SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN W W W W W W W W W W W W W W W W W W W W W W 12" NYLOPLAST MH W/ HS-25 COVER RIM = 5033.71 INV. IN=5029.73' (E) INV. OUT=5029.73' (E) N 1,423,744.54 E 3,117,357.36 CONNECT TO EX. 18" RCP W/ 24" (HS-25) NYLOPLAST MH W/ 3' Ø CONCRETE COLLAR RIM = 5033.63 INV. IN=5029.13' (N) INV. OUT=5029.13' (N) N 1,423,674.21 E 3,117,357.36 CONNECTION FITTING RIM = 5031.49 INV. IN=5029.95' (S) INV. OUT=5029.95' (S) N 1,423,744.54 E 3,117,401.64 70.33' ~ 6" PVC @ 0.85% UTIL XING STM OVER SAN STM BOP = 5029.56 SAN TOP = 5028.05 CLR = 1.51' UTIL XING STM OVER WTR STM BOP = 5029.64 WATER TOP, MAX. = 5028.14 MIN. CLR = 1.50 3.50' ~ 6" SLOTTED PIPE @ 0.71% 19.50' ~ 6" SLOTTED PIPE @ 0.54% 6" NYLOPLAST CLEANOUT W/ WATER TIGHT LID RIM = 5031.35 INV. IN=5029.98' (N) INV. OUT=5029.98' (N) N 1,423,741.04 E 3,117,401.64 4.78' ~ 6" SLOTTED PIPE @ 0.50% 6" NYLOPLAST CLEANOUT W/ WATER TIGHT LID RIM = 5031.43 INV. IN=5030.06' (SW) INV. OUT=5030.06' (SW) N 1,423,760.92 STOP ENTER SOUTH COLLEGE AVENUE (HIGHWAY 287) (R.O.W. REC. NO. 2004002682 & BOOK 1066 PAGE 184 & BOOK 1059 PAGE 402) WEST TRILBY ROAD (75.51' R.O.W.) IP IP CWA SCL SCL CF 5032 5033 5034 5034 5034 5033 5034 5034 5034 LOC STOP ENTER ECB PS 2 EA. INITIAL / INTERIM / FINAL 1 EA. INITIAL / INTERIM / FINAL 1 EA. INITIAL / INTERIM / FINAL 1 EA. INITIAL / INTERIM / FINAL 1 EA. INITIAL / INTERIM / FINAL 111 L.F. INTERIM / FINAL 263 L.F. INITIAL / INTERIM / FINAL 1 EA. INITIAL / INTERIM 100 L.F. INTERIM / FINAL 510 L.F. INITIAL / INTERIM / FINAL 105 L.F. INITIAL / INTERIM / FINAL 28 L.F. INTERIM / FINAL 225 L.F. INITIAL / INTERIM / FINAL 400 S.F. INTERIM / FINAL 1,732 S.F. INTERIM / FINAL 1,732 S.F. INTERIM / FINAL REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP EROS CONTROL DTLS.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:23 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 EROSION & SEDIMENT CONTROL DETAILS (1) C1.9 REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP EROS CONTROL DTLS.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:23 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 EROSION & SEDIMENT CONTROL DETAILS (2) C1.10 NOT PERMITTED DO NOT USE REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP EROS CONTROL DTLS.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:23 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 EROSION & SEDIMENT CONTROL DETAILS (3) C1.11 REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP EROS CONTROL DTLS.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:23 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 DETAILS (1) C1.12 17_13 DETAILS 2 C1.13 REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP EROS CONTROL DTLS.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:23 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 Scale: N.T.S. J IN-LINE ADA RAMP W/ LANDING RAMP PLAN VIEW A A 5.00' MIN 6.00' MIN 5.00' MIN CURB & GUTTER 6" CURB 2.0% MAX 0.5% MIN 2X4FT TACTILE WARNING B GRADE BREAK SIDEWALK 5.0FT, MIN WIDTH GRADE BREAK & CONSTRUCTION JOINT REFER TO PLANS FOR THICKNESS AND SUB BASE 6.00' MIN. LENGTH MAY VARY RAMP SEC A-A SUBGRADE 0.50' 5.00' LANDING MIN. 8.33% MAX RAMP SEC B-B 2.0% MAX 5.00' LANDING MIN 1.00' SUBGRADE PAVEMENT PER GEOTECH GUTTER TACTILE WARNING PAD 0.50' 0.50' 1.00' 8.33% MAX ADJUST LENGTH AS NEED TO MAINTAIN SLOPE END OF 6" CURB SIDEWALK MAX SLOPE 5.0% 5.0% MAX NOTES: 1. 5000 PSI CONCRETE WITH FIBERMESH REINFORCEMENT, OR 4X4 WWM WITH 2" MIN COVER. 2. BRUSHED FINISH ON ALL EXPOSED CONCRETE. 3. TOOL CONTRACTION JOINT IN EVERY 10FT O.C. 4. COMPACT SUBGRADE PER GEOTECHNICAL RECOMMENDATIONS, COMPACT TO 95% STANDARD PROCTOR MINIMUM. 5. CONCRETE THICKNESS PER GEOTECHNICAL RECOMMENDATIONS - 4" MIN. 6. PROVIDE SUBGRADE BASE COARSE PER GEOTECHNICAL RECOMMENDATIONS. 7. TACTILE WARNING TO BE 2X4' PAD WITH RAISED DOMES. PROVIDE ADHESIVE YELLOW TYPE AS THE MINIMUM. REFER TO GOVERNING JURISDICTION OR ARCHITECT FOR ADDITIONAL REQUIREMENTS. 8. PROVIDE 1 2" RADIUS ON ALL EDGES. 9. SIDEWALK SLOPE AT THE TOP OF THE RAMP SHALL BE NO MORE THAN 5.0%. 10. ADJUST RAMP LENGTH AS NEEDED TO MAINTAIN A MAX SLOPE OF 8.33%. 11. ANY RAMP LONGER THAN 10FT WILL REQUIRE A HANDRAIL, BUILT TO ADA STANDARDS 12. ADJUST RAMP WIDTH TO MATCH SIDEWALK. B 209 L.F. INITIAL / INTERIM / FINAL 27 L.F. INITIAL / INTERIM / FINAL 69 S.F. INTERIM / FINAL 1 EA. INITIAL / INTERIM / FINAL 1 EA. INITIAL / INTERIM 600 S.F. INITIAL / INTERIM 890 S.F. INTERIM / FINAL IP CF SCL PS MU MU ECB SSA RS LOC SCL SCL VTC IP IP SCL LOC SCL REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP EROSION CONTROL PLAN.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:23 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 GRADING LEGEND 5421 5420 SLOPE XXX MAJOR CONTOUR MINOR CONTOUR PROPOSED CONCRETE WASHOUT AREA CONSTRUCTION FENCE SEDIMENT CONTROL LOG STABILIZED STAGING AREA VEHICLE TRACING CONTROL LIMITS OF CONSTRUCTION CWA CF SCL SSA VTC LOC RS BMP LEGEND LABEL SYMBOL DESCRIPTION BMP CALLOUT FLOW ARROW BMP INSTALLATION SCHEDULE ORDER INSTALLATION ORDER/ TIME LINE BMP'S TAKEOFF BMP QUANTITY CUT/ FILL VOLUMES CUT (C.Y.) FILL (C.Y.) NET (C.Y.) TOTAL AREA OF DISTURBANCE = 0.484 AC CUT/FILL VOLUMES FOR REFERENCE ONLY, CONTRACTOR TO PERFORM OWN EARTH WORK CALCULATIONS. RS ROCK SOCKS IP INLET PROTECTION 0' 20' 40' 60' SCALE: 1" = 20' N (%PLS) SPECIES SEEDING AND MULCHING FINAL STABILIZATION OF THE PERVIOUS SITE AREA SHALL BE ACHIEVED THROUGH LANDSCAPING. ALL PLANTING BEDS SHALL BE MULCHED WITH ¾” TO 1.5” CRUSHED GRANITE, COLORADO ROSE BY JENSEN SUPPLY OR APPROVED EQUAL. GRASSES AND PERENNIALS SHALL HAVE NATURAL CEDAR FIBER MULCH AT THEIR BASES THE DIAMETER OF THE PLANTING PIT. SUBMIT SAMPLES FOR APPROVAL BY OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. SOD SHALL BE 'REVEILLE' HYBRID TEXAS/KENTUCKY BLUEGRASS (POA ARACHNIFEREA X POA PRATENSIS) AND IS AVAILABLE THROUGH GRAFF'S TURF FARM, FT. MORGAN, CO. 970-867-8873. SUBSTITUTIONS WILL BE CONSIDERED PRIOR TO BIDDING. SEEDED NATIVE TURF AREAS SHALL BE FIRST HYDROSEEDED WITH SEEDING SLURRY THEN MULCHED WITH TACKIFIER. DETENTION POND AND RAIN GARDEN SLOPES SHALL BE COVERED WITH S150 EROSION CONTROL MAT OR EQUAL. SEED MIX SHALL BE APPLIED AS FOLLOWS: CONCRETE PAVEMENT (6,650 SF / 0.15 AC) EROSION CONTROL BLANKET (1,290 SF / 0.01 AC) PERMANENT SEEDING / MULCHING (1,801 SF / 0.04 AC) ASPHALT PAVEMENT (1,740 SF / 0.04 AC) FINAL LANDSCAPING (9,065 SF / 0.21 AC) 17_13 EROSION CONTROL PLAN C1.8 E 3,117,412.23 39.51' ~ 6" PVC @ 0.50% 12" NYLOPLAST CLEANOUT W/ GRATE RIM = 5031.46 INV. IN=5029.93' (E) INV. OUT=5029.93' (E) N 1,423,744.54 E 3,117,396.87 PRO. 20.00' DRAINAGE ESMT. REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP STORM PnP.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:22 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 STORM PLAN C1.7 N 0' 10' 20' 30' SCALE: 1"=10' N.T.S. 1 RAIN GARDEN DETAILING N KEY MAP SCALE: N/A SOUTH COLLEGE AVENUE (HWY 287) WEST TRILBY ROAD Ziggi's Drive thru Parking Parking Drive Lane Trash SITE BENCHMARK: PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS N00°40'23"W, A DISTANCE OF 2646.40 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO. MONUMENTS FULLY DESCRIBED HEREIN. Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP DrainagePlan.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:22 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 DRAINAGE LEGEND EX. MAJOR CONTOUR EX. MINOR CONTOUR FLOW ARROW DRAINAGE BASIN BASIN ID AREA (AC) C100 B3-6 2.80 0.47 0.76 C10 LIMITS OF SITE IMPROVEMENT CHANGES BASIN BOUNDARY 5421 5420 NOTES: 1. THE SITE LIES WITHIN THE FOSSIL CREEK DRAINAGE BASIN. FOSSIL CREEK IS LOCATED APPROXIMATELY 1.35 MILES EAST OF THE SITE. PR. MAJOR CONTOUR PR. MINOR CONTOUR B4-6A DESIGN POINT 0' 20' 40' 60' SCALE: 1" = 20' N LIMITS OF CONSTRUCTION 17_13 DRAINAGE PLAN C1.6 BENCHMARK: PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS N00°40'23"W, A DISTANCE OF 2646.40 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO. MONUMENTS FULLY DESCRIBED HEREIN. 1.2% 5034 5033.93 5034 5034 5034 5034 5033 1.2% 1.2% 0.6% 0.4% 0.5% 1.6% 0.1% 0.2% FLOWLINE OF 2' WIDE V-PAN (TYP.) 5032 5033 5034 5033.46 LIMITS OF CONSTRUCTION RIGHT-HAND TURN TO: SOUTH COLLEGE AVENUE (HWY 287) 1.6% 5033.71 5033.78 5034.07 1.1% 0.5% 12.4% 10.9% 13.8% 2.0% 2.0% 2.0% 2.6% 2.0% 1.6% 4.3% 1.6% 1.4% 1.5% 0.5% 1.6% 10.1% 2.3% 11.4% 13.3% 13.8% 13.3% 13.3% 18.3% 12.9% 16.4% 16.6% 14.4% 12.9% 13.0% 14.0% 12.0% 13.3% 12.0% 12.0% 8.2% 6.5% 6.5% 6.5% 2.8% 0.2% 2.0% 2.0% 5033.60 2.0% 3.9% 1.6% 3.6% 3.6% 7.6% 4.8% 2.3% 2.9% 1.7% 1.5% 2.0% 0.1% 5.4% 6.5% FF = 5033.88 PRO. ACCESS AND EMERGENCY ACCESS EASEMENT STOP ENTER REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP GRADING PLAN.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:22 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 GRADING PLAN C1.5 N 0' 10' 20' 30' SCALE: 1"=10' PROPOSED CONTOURS PROPOSED CONTOURS MAJOR EXISTING CONTOURS EXISTING CONTOURS MAJOR PROPOSED SLOPE XXXX PROPOSED SPOT SHOTS XXX GRADING LEGEND 5421 5420 N KEY MAP SCALE: N/A SOUTH COLLEGE AVENUE (HWY 287) WEST TRILBY ROAD Ziggi's Drive thru Parking Parking Drive Lane Trash SITE BENCHMARK: PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS N00°40'23"W, A DISTANCE OF 2646.40 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO. MONUMENTS FULLY DESCRIBED HEREIN. E=3,117,254.72 R5.00' R5.00' R5.00' 10.00' PRO. ACCESS AND EMERGENCY ACCESS EASEMENT PROPERTY CORNER CONTROL POINT 1 N=1,423,660.63 E=3,117,451.62 PROPERTY CORNER CONTROL POINT 2 N=1,423,873.62 E=3,117,449.12 REFER SHEET C1.7 - STORM PLAN FOR STORM SEWER AND RAIN GARDEN CONSTRUCTION INFORMATION PRO. BOOSTER PUMP CONNECT TO EX. 1.5" WATER SERVICE 5.00' MIN. PRO. 3/4" WATER METER PIT N=1,423,458.36 E=3,117,140.89 R3.00' R3.00' 5.00 L.F. 3/4" TYPE 'K' COPPER WATER SERVICE LINE 23.84 L.F. 3/4" TYPE 'K' COPPER WATER SERVICE LINE PRO. SSWR CO CONNECT TO EX. 8" SSWR STUB CONTRACTOR TO VERIFY LOCATION AND INVERT N=1423699.73 E=3117238.94 INV:5025.26 PRO. SSWR CO N=1423724.54 E=3117317.32 INV:5026.90 PRO. 4" SSWR LINE 50.03 L.F. @ 2.0% PRO. SSWR CO N=1423724.54 E=3117367.36 INV:5027.90 PRO. 4" SSWR LINE 29.26 L.F. @ 2.0% PRO. SSWR CO N=1423695.28 E=3117404.18 INV:5029.23 PRO. SSWR CO N=1423695.28 E=3117367.36 INV:5028.49 4" SSWR SERVICE 36.82 L.F. @ 2.0% CONNECT TO EX. 6" MAIN PRO. 3/4" WATER SERVICE TAP N=1,423,449.11 E=3,117,157.08 CONTRACTOR TO VERIFY LOCATION & VERIFY EX. 6" FIRELINE IS NOT IN USE & ABANDON AT WATER MAIN N=1,423,449.11 E=3,117,159.03 PRO. SSWR CONNECTION TO BUILDING N=1423699.99 E=3117407.28 INV:5029.34 PRO. SSWR CONNECTION TO BUILDING N=1423711.09 E=3117408.59 INV:5028.81 PRO. SSWR CO N=1423724.54 E=3117388.12 INV:5028.32 PRO. 4" SSWR LINE 20.76 L.F. @ 2.0% PRO. 4" SSWR LINE 24.49 L.F. @ 2.0% 4" SSWR SERVICE 5.64 L.F. @ 2.0% REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP OVERALL UTILITY PLAN.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:22 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 OVERALL UTILITY PLAN 0' 20' 40' 60' C1.4 SCALE: 1" = 20' N G SAN W W W E STORM SEWER SANITARY SEWER WATER LINE GAS LINE ELECTRICAL ELECTRICAL BOX SITE LIGHT MANHOLES GATE VALVE CLEAN OUT PROPOSED FIRE HYDRANT WATER METER ST SS H Y D FIBER OPTIC LINE T UTILITY LEGEND NOTE: 1. FINAL LAYOUT OF WATER SERVICE IS SUBJECT TO PRESSURE AND FLOW CONSTRAINTS AND WATER QUALITY CONDITIONS AS REQUIRED BY CODE AND FORT COLLINS LOVELAND WATER DISTRICT. 2. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING 1" WATER METER AND TAP WITH NEW 3/4" WATER METER AND TAP PER FORT COLLINS LOVELAND WATER DISTRICT STANDARDS. CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: DATE FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT CHRIS MATKINS, DISTRICT MANAGER DATE TERRY FARRILL, P.E., DISTRICT ENGINEER DATE BENCHMARK: PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS N00°40'23"W, A DISTANCE OF 2646.40 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO. MONUMENTS FULLY DESCRIBED HEREIN. E=3,117,450.77 N=1,423,672.74 E=3,117,435.94 10.00 10.00 11.00 10.00 5.00 5.50 6.00 10.64 19.00 41.00 6.50 12.00 23.09 16.30 10.00 N=1,423,660.63 E=3,117,451.57 N=1,423,873.62 E=3,117,449.12 N=1,423,677.25 E=3,117,338.04 N=1,423,694.56 E=3,117,343.10 N=1,423,768.31 E=3,117,373.52 N=1,423,842.76 E=3,117,372.13 N=1,423,791.52 E=3,117,439.58 N=1,423,678.43 E=3,117,420.20 N=1,423,730.40 E=3,117,435.64 N=1,423,766.73 E=3,117,398.54 N=1,423,818.22 E=3,117,392.77 N=1,423,817.73 E=3,117,382.77 N=1,423,766.73 E=3,117,388.53 N=1,423,768.44 E=3,117,423.58 N=1,423,762.35 E=3,117,433.58 N=1,423,817.71 E=3,117,433.12 N=1,423,817.62 E=3,117,423.13 N=1,423,672.25 E=3,117,407.06 L1 L2 C1 L3 L4 L5 L6 L7 C2 L8 C3 C4 L10 L11 L12 C5 L13 C6 L14 C7 L16 C8 C9 L17 L18 C10 L19 C11 L20 C12 L21 L22 C13 L23 L24 C14 C16 L25 L15 L26 N=1,423,776.54 E=3,117,344.13 N=1,423,757.20 E=3,117,371.67 PROPOSED 20.00' DRAINAGE ESMT. L9 N=1,423,696.77 E=3,117,317.57 N=1,423,691.07 E=3,117,299.64 CURVE TABLE CURVE # C7 C8 C9 C10 C11 C12 C13 C14 C16 ARC LENGTH 7.93 25.99 14.67 13.79 18.20 44.50 82.78 37.46 10.56 RADIUS 5.00 22.84 31.97 13.99 33.85 14.33 26.33 26.10 14.33 DELTA ANGLE 90°54'28" 65°12'35" 26°17'06" 56°28'46" 30°48'17" 177°53'31" 180°06'53" 82°14'21" 42°12'29" CHORD BEARING S44°33'27"W N61°47'06"E N16°37'40"E N61°45'43"E N15°22'33"E N88°55'40"W S89°56'01"W N40°50'39"E N21°19'32"E CHORD LENGTH 7.13 24.61 14.54 13.23 17.98 28.66 52.67 34.32 10.32 LINE TABLE LINE # L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 BEARING N89°59'20"W S00°28'33"E N89°43'43"W S33°18'50"W S00°31'41"E N06°23'13"W N06°26'59"W S00°28'33"E N06°23'13"W N06°26'59"W S88°29'59"W DISTANCE 20.87 1.50 20.29 14.43 1.50 1.50 1.50 1.50 1.50 1.50 25.34 CURVE TABLE CURVE # C1 C2 C3 C4 C5 C6 ARC LENGTH 6.37 3.25 1.44 2.41 3.89 11.99 RADIUS 3.50 2.00 2.37 2.15 2.50 4.00 DELTA ANGLE 104°15'07" 93°07'40" 34°52'32" 64°11'51" 89°06'13" 171°41'32" CHORD BEARING S52°39'16"E N46°35'04"W S04°41'21"E S56°57'25"W S45°26'54"E S03°52'57"E CHORD LENGTH 5.53 2.91 1.42 2.28 3.51 7.98 LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 BEARING N89°16'53"E S00°31'43"E N75°13'10"E S00°03'19"E N90°00'00"E N90°00'00"W S00°00'42"W N89°01'18"E S89°01'14"W N89°59'55"W S00°03'46"W N90°00'00"E S00°53'47"E S00°53'47"E N33°18'53"E DISTANCE 36.86 15.73 3.19 4.24 1.13 5.46 1.73 16.50 28.88 14.81 15.04 16.58 2.61 101.32 19.16 REVISIONS: Drawn By: Sheet Sheet Name: No. Date: Description: FILENAME: 17_13 UP HC PLAN.dwg PLOTDATE: 2017-09-22 PLOT TIME: 4:21 PM Checked By: Date Issued: Project No: CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know what's below, Call before you dig. ZIGGI'S COFFEE - FORT COLLINS UTILITY PLANS 6533 S. COLLEGE AVE. FORT COLLINS, CO 80525 Number: A DIVISION OF HABERER CARPENTRY INC. 621 SOUTHPARK DR., SUITE 1600 LITTLETON CO, 80120 INFO@HABERERGROUP.COM 1 9/27/17 FDP SUBMITTAL #1 ZAH CCH 9/22/2017 17_13 HORIZONTAL CONTROL PLAN C1.3 N KEY MAP SCALE: N/A SOUTH COLLEGE AVENUE (HWY 287) WEST TRILBY ROAD Ziggi's Drive thru Parking Parking Drive Lane Trash SITE BENCHMARK: PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS N00°40'23"W, A DISTANCE OF 2646.40 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO. MONUMENTS FULLY DESCRIBED HEREIN. CURB AND GUTTER CURB AND GUTTER V-PAN V-PAN N 0' 10' 20' 30' SCALE: 1"=10' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: ENVIRONMENTAL PLANNER DATE DISCREPANCY. 5. CONTRACTOR SHALL PRESERVE EXISTING VEGETATION OUTSIDE OF THE PROJECT LIMITS. ANY DAMAGE TO VEGETATION OR SITE IMPROVEMENTS OUTSIDE OF THE PROJECT LIMITS DUE TO CONSTRUCTION ACTIVITIES SHALL BE REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE. 6. BARRIERS/FENCING SHALL BE PROVIDED PRIOR TO SITE DEMOLITION TO PROVIDE FOR SAFETY OF WORKERS AND PASSERSBY. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ROUTES DURING CONSTRUCTION, UNLESS COORDINATED WITH CITY OF FORT COLLINS. 7. THE CONTRACTOR SHALL SUBMIT A DETAILED DEMOLITION PLAN OUTLINING REMOVAL TO CITY OF FORT COLLINS, THE ENGINEER, AND THE ARCHITECT. 8. THE CONTRACTOR SHALL PROVIDE FOR DUST CONTROL DURING DEMOLITION TO INCLUDE COVERING TRUCKS HAULING DEBRIS OFFSITE, PERIODICALLY CLEANING AND SWEEPING ADJACENT STREETS AND DRIVES AND/OR USING DUST PALLIATIVE AS NEEDED. 9. THE CONTRACTOR SHALL SAW CUT EXISTING ASPHALT PAVEMENT AT DEMOLITION LIMITS. APPLY SS-1 TACKCOAT AT EDGE PRIOR TO PLACING NEW ASPHALT. REFER TO CITY OF FORT COLLINS STREET CUT AND PATCH BACK DETAIL AND SPECIFICATION FOR PUBLIC IMPROVEMENTS. 10. EXISTING CONCRETE AT DEMOLITION LIMITS SHALL BE SCORED THEN BROKEN AT THE JOINT TO CREATE A ROUGH SURFACE TO ACCEPT NEW CONCRETE. 11. THE CONTRACTOR SHALL REFER TO PROJECT SPECIFICATIONS FOR THE DISPOSAL OF ALL DEMOLISHED ITEMS. 12. THOROUGHLY CLEAN ALL AREAS, SURFACES, BUILDINGS AND STRUCTURES IMPACTED BY DEMOLITION ACTIVITIES PRIOR TO START OF NEW CONSTRUCTION. 13. DEMOLITION SHALL INCLUDE (AT A MINIMUM): · REMOVAL AND/OR ABANDONING THE EXISTING 1" TAP AND METER PER FCLWD STANDARDS. · ABANDONING OF THE EXISTING 6" FIRELINE AT THE MAIN PER FCLWD STANDARDS. · REMOVAL OF ASPHALT, CONCRETE PANS AND/OR CURB AND GUTTER, AND SIDEWALK · REMOVAL OF TREES, BUSHES AND FOLIAGE, AS DIRECTED BY LANDSCAPE PLANS. TREE REMOVAL OR TRANSPLANTING SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AND LANDSCAPE ARCHITECT. · REMOVAL OF ANY UNSATISFACTORY SOIL, AS IDENTIFIED BY THE GEOTECHNICAL ENGINEER. DEMO ITEMS: CURB & GUTTER REMOVAL: 585 LF 2-FT V-PAN REMOVAL: 200 LF SIDEWALK REMOVAL: 545 SF EXISTING CURB & GUTTER TO BE REMOVED EXISTING CURB & GUTTER TO REMAIN, TYP. EXISTING 2-FT V-PAN TO BE REMOVED EXISTING 2-FT V-PAN TO BE REMOVED EXISTING SIDEWALK TO BE REMOVED EXISTING SIDEWALK TO BE REMOVED EXISTING SIDEWALK TO BE REMOVED EXISTING TREES TO BE REMOVED EXISTING UNDERGROUND ELECTRIC & TRANSFORMER TO BE REMOVED. CONTRACTOR TO COORDINATE W/ UTILITY PROVIDER EXISTING ASPHALT TO BE REMOVED: 11,922 SF EXISTING STORM INLET TO REMAIN EXISTING STORM INLET TO REMAIN EXISTING ASPHALT PAVEMENT TO BE REMOVED 2-FT ASPHALT PATCH-BACK ZONE (T-PATCH). 2-FT ASPHALT PATCH-BACK ZONE (T-PATCH). 2-FT ASPHALT PATCH-BACK ZONE (T-PATCH). 2-FT WIDE ASPHALT T-PATCH (RE: DETAIL SHEET): 350 LF 2-FT ASPHALT PATCH-BACK ZONE (T-PATCH). EXISTING 1" DOMESTIC METER & TAP TO BE ABANDONED/ REMOVED PER FCLWD STDS 2-FT ASPHALT PATCH-BACK ZONE (T-PATCH). EXISTING 6" FIRELINE TO BE ABANDONED AT MAIN PER FCLWD STDS CONTRACTOR TO VERIFY EX FIRELINE IS NOT IN USE PRIOR TO ABANDONMENT EXISTING 6" FIRELINE TO REMAIN EXISTING FIRE HYDRANT TO REMAIN EXISTING 1.5" SERVICE LINE TO REMAIN N KEY MAP SCALE: N/A SOUTH COLLEGE AVENUE (HWY 287) WEST TRILBY ROAD Ziggi's Drive thru Parking Parking Drive Lane Trash SITE EXISTING SITE LIGHT TO REMAIN (TYP.) CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: DATE WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. 9. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 10. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED TO PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB & GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE WASHOUT AREAS, AND/OR BUILDING SITES. 11. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED. 12. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 13. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL: A. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. B. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. C. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. 14. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY. 15. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION (HOA). STANDARD TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES: 1. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. 2. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. 3. ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. 4. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. 5. ALL LANE LINES FOR CONCRETE PAVEMENT SHOULD BE EPOXY PAINT. 6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL ENTITY ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 7. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. 8. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. 9. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. 10. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF 11. ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. 12. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. 13. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. 14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). 15. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. STANDARD STREET IMPROVEMENT NOTES: 1. ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE. 2. A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY ASPHALT. 3. WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS APPROVED BY THE LOCAL ENTITY ENGINEER IN LOVELAND. 4. STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER. 5. FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED. 6. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK. 7. ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN. 8. THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY. 9. PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES INFLATED TO NOT LESS THAT 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL BE PREFORMED IN THE PRESENCE OF AN INSPECTOR. STANDARD DRAINAGE NOTES: 1. ALL STREET, SANITARY SEWER, STORM SEWER AND WATER CONSTRUCTION SHALL CONFORM TO CITY STANDARDS AND SPECIFICATIONS CURRENT AT DATE OF EXECUTION OF THE DEVELOPMENT AGREEMENT PERTAINING TO THIS DEVELOPMENT. ANY CONSTRUCTION OCCURRING THREE YEARS AFTER THE EXECUTION OF THE DEVELOPMENT AGREEMENT SHALL REQUIRE RE-EXAMINATION OF THE PLANS BY THE DIRECTOR WHO MAY REQUIRE THAT THEY BE MADE TO CONFORM TO STANDARDS AND SPECIFICATIONS CURRENT AT THAT TIME. 2. THE TYPE, SIZE, LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE AS SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNKNOWN UNDERGROUND UTILITIES. 3. THESE PLANS HAVE BEEN REVIEWED BY THE CITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY ENGINEER, OR THE CITY FOR ACCURACY OR CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT THE QUANTITIES OF THE ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE CITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. 4. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR MUST GIVE THE CITY ENGINEERING DEPARTMENT (970-221-6605) AND THE EROSION CONTROL INSPECTOR (970-221-6700) TWENTY-FOUR (24) HOURS ADVANCE-NOTICE. INITIAL EROSION CONTROL MEASURES MUST BE INSTALLED AND A SITE INSPECTION BY THE EROSION CONTROL INSPECTOR IS REQUIRED BEFORE COMMENCING CONSTRUCTION ACTIVITIES. 5. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNERS. 6. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THIS DEVELOPMENT BY HCI ENGINEERING MUST BE MET. 7. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY, CERTIFICATION OF THE DRAINAGE FACILITIES BY A COLORADO REGISTERED PROFESSIONAL ENGINEER MUST BE SUBMITTED TO AND APPROVED BY THE CITY STORMWATER DEPARTMENT. (INCLUDING THE APPLICABLE NOTE AS SET FORTH BELOW) FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS, CERTIFICATION OF ALL DRAINAGE FACILITIES SHALL BE SUBMITTED TO THE CITY STORMWATER DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY. INDIVIDUAL LOT CERTIFICATION, ELEVATION CERTIFICATION, OR FLOODPROOFING CERTIFICATION, AS SPECIFIED IN THE DEVELOPMENT AGREEMENT, MUST BE SUBMITTED TO THE CITY STORMWATER DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SUCH LOT. FOR SINGLE FAMILY DEVELOPMENTS, CERTIFICATION OF ALL DRAINAGE FACILITIES MUST BE SUBMITTED TO THE CITY STORMWATER DEPARTMENT IN ACCORDANCE WITH ALL CONDITIONS AS PRESCRIBED BY THE DEVELOPMENT AGREEMENT ASSOCIATED WITH THIS DEVELOPMENT. INDIVIDUAL LOT CERTIFICATION, ELEVATION CERTIFICATION, OR FLOODPROOFING CERTIFICATION, AS SPECIFIED IN THE DEVELOPMENT AGREEMENT, MUST BE SUBMITTED TO THE CITY STORMWATER DEPARTMENT AT LEAST ONE WEEK PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SUCH LOT. 8. IF DEWATERING IS USED TO INSTALL UTILITIES, AND DISCHARGE WILL BE INTO THE STREET, GUTTER, STORM SEWER, CHANNEL, IRRIGATION DITCH, OR ANY WATERS OF THE STATE A STATE CONSTRUCTION DEWATERING INDUSTRIAL WASTEWATER DISCHARGE PERMIT IS REQUIRED. 9. ALL LAND DISTURBING ACTIVITIES GREATER THAN OR EQUAL TO ONE ACRE MUST COMPLY WITH THE STATE OF COLORADO PERMITTING PROCESS FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. FOR MORE INFORMATION CONTACT THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, WATER QUALITY CONTROL DIVISION, AT 303-692-3500 OR REFER TO THE WEB SITE AT HTTP://WWW.CDPHE.STATE.CO.US/WQ/PERMITSUNIT/ . 10. PROJECT DATUM: NAVD88 BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "A 409"; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE ~1000' SOUTH OF THE INTERSECTION OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION: 5039.43 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18'. 11. IF FILL OR DREDGED MATERIAL IS DISCHARGED INTO WATERS OF THE UNITED STATES, A USACE 404 PERMIT IS REQUIRED. 12. IF CONSTRUCTION AFFECTS ANY COLORADO HIGHWAY, A COLORADO DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PERMIT IS REQUIRED. 13. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 14. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY FOR NORTHWEST CORNER OF COLLEGE AVENUE & TRILBY ROAD ECKERD DRUG BY NORTHSTAR DESIGN, INC. AND AMENDED BY THE DRAINAGE CONFORMANCE LETTER FOR ZIGGI'S COFFEE AND EROSION CONTROL REPORT FOR ZIGGI'S COFFEE, BY HCI ENGINEEING SHALL BE FOLLOWED AND IMPLEMENTED. 15. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BY SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BY SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT. WATER AND SANITARY SEWER NOTES: 1. THE MINIMUM COVER OVER WATERLINES IS 5.0 FEET AND TEH MAXIMUM COVER IS 6.0 FEET UNLESS OTHERWISE NOTED ON THESE AND APPROVED BY FORT COLLINS - LOVELAND WATER DISTRICT. 2. ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FORT COLLINS - LOVELAND WATER DISTRICT AND THE SOUTH FORT COLLINS SANITATION DISTRICT - STANDARD CONSTRUCTION SPECIFICATIONS. CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: ENVIRONMENTAL PLANNER DATE LOT 2, C.O.L. COLLEGE AND TRILBY SUBDIVISION SITUATED IN THE SOUTHEAST 1 4 OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO JUNE 21, 2017 N CONTACTS: ARCHITECT: MAH ARCHITECTURAL GROUP MICHAEL HUNSINGER 1385 S. COLORADO BLVD. DENVER, CO 80222 PHONE: (303) 778-0608 EMAIL: MICHAEL@MAHARCH.COM CIVIL ENGINEER: HCI ENGINEERING COLE HABERER 621 SOUTHPARK DR., SUITE 1600 LITTLETON, CO 80120 PHONE: (303) 979-3900 EMAIL: COLEH@HABERERGROUP.COM G SAN W W W E OHE 5421 5420 XXX CURB AND GUTTER (SPILL) CURB AND GUTTER (CATCH) STORM SEWER SANITARY SEWER WATER LINE GAS LINE ELECTRICAL OVERHEAD POWER LINES SITE LIGHT SIGN MANHOLES INLET METER PIT GATE VALVE CLEAN OUT TREE SLOPE MAJOR CONTOUR MINOR CONTOUR PROPOSED FIRE HYDRANT FIRE DEPARTMENT CONNECTION ST SS FIBER OPTIC LINE T Sheet Index Sheet Number Sheet Title C1.0 COVER SHEET C1.1 NOTES C1.2 DEMOLITION PLAN C1.3 HORIZONTAL CONTROL PLAN C1.4 OVERALL UTILITY PLAN C1.5 GRADING PLAN C1.6 DRAINAGE PLAN C1.7 STORM PLAN C1.8 EROSION CONTROL PLAN C1.9 EROSION & SEDIMENT CONTROL DETAILS (1) C1.10 EROSION & SEDIMENT CONTROL DETAILS (2) C1.11 EROSION & SEDIMENT CONTROL DETAILS (3) C1.12 DETAILS (1) C1.13 DETAILS 2 GENERAL NOTES - CITY OF FORT COLLINS: 1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY. 2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS. 4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER’S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS. 5. ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER “DRY” UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER. 6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 7. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION. 10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES. 11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK. 12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES. 15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT. 18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT. 19. ALL RECOMMENDATIONS OF THE "DRAINAGE CONFORMANCE LETTER FOR ZIGGI'S COFFEE - FORT COLLINS" AND THE "EROSION CONTROL REPORT FOR ZIGGI'S COFFEE - FORT COLLINS" DATED AUGUST, 2 2017 BY HCI ENGINEERING. SHALL BE FOLLOWED AND IMPLEMENTED. 20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE. 23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS – 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION. 24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY’S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT. 25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS. 26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS. 27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS. 28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL. 29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT. 30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING. 31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED. 33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT. 34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY. 35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY. 39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER. 40. THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2) FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THE INFORMATION SHALL BE AS FOLLOWS: BENCHMARKS—LOCAL ENTITY SURVEY. B.M.NUMBER A 409 ELEV.= 5039.43, DESCRIPTION NATIONAL GEODETIC SURVEY BRASS CAP STRAMPED "A 409" LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE APPROXIMATELY 1000 FEET SOUTH OF THE INTERSECTION OF WEST TRILBY NAVD 1988 DATUM. 41. ALL STATIONING IS BASED ON CENTERLINE/FLOWLINE (INSERT PROPER WORD) OF ROADWAYS UNLESS OTHERWISE NOTED. 42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS. 46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (LIST). 48. APPROVED VARIANCES ARE LISTED AS FOLLOWS: (PLAN SET MUST HAVE A LIST OF ALL APPLICABLE VARIANCES FOR THE PROJECT). I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. _____________________________________________________________ COLE C. HABERER, P.E. DATE STATE OF COLORADO NO. 43259 THESE PLANS HAVE BEEN REVIEWED BY THE CITY OF FORT COLLINS FOR CONCEPT ONLY. THE REVIEW DOES IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY OF FORT COLLINS ENGINEER, OR THE CITY OF FORT COLLINS FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE CITY OF FORT COLLINS FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THAT CONSTRUCTION PHASE. FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT CHRIS MATKINS, DISTRICT MANAGER DATE TERRY FARRILL, P.E., DISTRICT ENGINEER DATE CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: ENVIRONMENTAL PLANNER DATE