November 03, 2014
Ken Merritt
JR Engineering
2900 S. College, Ste 3D
Fort Collins, CO 80525
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970.224.6045, cfrickey@fcgov.com
Topic: General
10/21/2014: The area being added to Lot 1 from this replat has no associated land use proposed. If
you want to develop this piece of land in the future, you would need to go through a PDP. You can
add a simple concept plan to your submittal for this replat and that will allow you to develop the empty
space on Lot 1 through an amendment as opposed to a PDP.
Comment Number: 1 Comment Originated: 10/21/2014
10/21/2014: Please add a label for Lot 2 above the acreage and square footage.
Comment Number: 2 Comment Originated: 10/21/2014
10/21/2014: 3.2.2(J) - Parking areas shall be setback 5 feet from a lot line. The parking lot on the
south end of the site abutting the lot line does not meet this standard. Two options you have to meet
the standard are moving the lot line back 5 feet or eliminating two parking spots and landscaping the
south end of the parking lot.
Comment Number: 3 Comment Originated: 10/21/2014
10/21/2014: 3.2.1(E)5 - The parking lot abutting the lot line does not contain any interior landscaping.
The Land Use Code requires 6 percent of the parking lot to be dedicated to landscaped areas. You
can landscape the boundary of the parking lot or add a landscaped island to the interior of the parking
lot to meet this standard. You can find the standards for landscaped islands in section 3.2.1(E)(5)(c) of
the Land Use Code.
Comment Number: 4 Comment Originated: 10/21/2014
Department: Engineering Development Review
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Clay Frickey, at 970.224.6045 or
cfrickey@fcgov.com.
RE: US Bank First Subdivision Replat, PDP140017, Round Number 1
Page 1 of 4
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
10/21/2014: The City will be entering into a development agreement to ensure that the public
improvements along John F Kennedy Parkway will be completed. This includes identifying the
responsibility to construct the section that will be added to the Lot 1 First National Bank PUD 1st site
with this replat. There is a desire to complete the sidewalk connection along John F Kennedy Parkway
to Horsetooth road and if the City constructs the improvements after the right of way has been
dedicated, a reimbursement will be due.
Comment Number: 3 Comment Originated: 10/21/2014
Topic: Plat
10/21/2014: Right of way will need to be dedicated to the north of John F Kennedy Parkway for the Lot
3, Observatory Heights property. Right of way to be dedicated will need to total 16' from the curb face
(10' parkway and 6' detached sidewalk). See redlines.
Comment Number: 1 Comment Originated: 10/21/2014
10/21/2014: 7.5' of right of way will need to be dedicated along the property frontage on Horsetooth
Road. According to the City of Fort Collins Master Street Plan, Horsetooth Road is classified as a 4
lane arterial with a total right of way width of 115'. The existing plat currently shows an 8' utility easment.
To clean up the plat, we recommend dedicating the 8' of right of way.
Comment Number: 2 Comment Originated: 10/21/2014
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
10/17/2014: No comments.
Comment Number: 1 Comment Originated: 10/17/2014
Department: Light And Power
Contact: Jim Spaulding, 970-416-2772, jspaulding@fcgov.com
Topic: General
10/21/2014: No comments.
Comment Number: 1 Comment Originated: 10/21/2014
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
10/28/2014: Poudre Fire Authority has no comments relative to the replat however further comments
may be needed as such time the property is developed.
Comment Number: 1 Comment Originated: 10/28/2014
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Page 2 of 4
10/21/2014: No Comment from Erosion Control. This revision does not significantly affect the current
erosion control materials. If you need clarification concerning this, or if there are any questions please
contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 10/21/2014
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
10/21/2014: No comments on the replat.
Comment Number: 2 Comment Originated: 10/21/2014
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
10/20/2014: Please change the title and correct the sub-title as masked. See redlines.
Comment Number: 2 Comment Originated: 10/20/2014
10/20/2014: Please make sure that the Plat language is the most current.
Comment Number: 3 Comment Originated: 10/20/2014
10/20/2014: Please add a Basis Of Bearings statement that is separate from the legal description.
Comment Number: 4 Comment Originated: 10/20/2014
10/20/2014: Please set a monument at the point of beginning. See redlines.
Comment Number: 5 Comment Originated: 10/20/2014
10/20/2014: Please correct the Notary Public signature block as shown. See redlines.
Comment Number: 6 Comment Originated: 10/20/2014
10/20/2014: Are there any Lienholders for this property? If so, please add a signature block. If not,
please add a note stating there are none.
Comment Number: 7 Comment Originated: 10/20/2014
10/20/2014: Please add notes/statements as shown on sheet 1. See redlines.
Comment Number: 8 Comment Originated: 10/20/2014
10/21/2014: Please add distances & curve data as marked. See redlines.
Comment Number: 9 Comment Originated: 10/21/2014
10/21/2014: Please add sources of right of way dedications.
Comment Number: 10 Comment Originated: 10/21/2014
10/21/2014: Please change the marked bearings to follow the legal description. See redlines.
Comment Number: 11 Comment Originated: 10/21/2014
10/21/2014: Additional right of way will be needed along Horsetooth Road & JFK Parkway. See
redlines.
Comment Number: 12 Comment Originated: 10/21/2014
10/21/2014: Please add a symbol key/legend on sheet 2. See redlines.
Comment Number: 13 Comment Originated: 10/21/2014
10/21/2014: Please label the lots as shown. See redlines.
Comment Number: 14 Comment Originated: 10/21/2014
Page 3 of 4
10/21/2014: Please change the lot line between Lots 1 & 2 and the new right of way lines to
solid/continuous linetype. See redlines.
Comment Number: 15 Comment Originated: 10/21/2014
10/22/2014: All easements must be clearly labeled and locatable. See redlines.
Comment Number: 16 Comment Originated: 10/22/2014
10/22/2014: Please check the distance (220.25') along JFK Parkway. See redlines.
Comment Number: 17 Comment Originated: 10/22/2014
10/22/2014: Please remove "(TYP.)" from the monument descriptions. See redlines.
Comment Number: 18 Comment Originated: 10/22/2014
Topic: Site Plan
10/22/2014: Please change the title and correct the sub-title as masked. See redlines.
Comment Number: 19 Comment Originated: 10/22/2014
10/22/2014: There are line over text issues. See redlines.
Comment Number: 20 Comment Originated: 10/22/2014