Loading...
HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER (FORMERLY LINK-N-GREENS) - PDP - PDP130001 - PLANS - BUILDING EXTERIOR (8)WALL SECTION LEGEND TYPE W-1: -3" INSULATED METAL WALL PANEL W/ LIGHT GREY KYNAR FINISH, VERTICAL MOUNT (1" REVEALS) -1/2" FIBERGLASS-SCRIM GYPSUM SHEATHING -6" METAL STUD (REFER TO SECTIONS AND DETAILS FOR UNDERLYING WALL) W-1 W-2 W-3 TYPE W-2: -3" INSULATED METAL WALL PANEL W/ MEDIUM GREY HORIZONTAL RIBBED KYNAR FINISH, VERTICAL MOUNT (1" REVEALS) -1/2" FIBERGLASS-SCRIM GYPSUM SHEATHING -6" METAL STUD (REFER TO SECTIONS AND DETAILS FOR UNDERLYING WALL) TYPE W-3: -8" x 16" x 8" CMU WITH DARK GREY SMOOTH FINISH -1" AIRSPACE -2" RIGID INSULATION -6" METAL STUD -5/8" GYPSUM BOARD W-4 TYPE W-4: -CURTAIN WALL WITH 1" INSULATED LOW-E GLAZING, HORIZONTAL EXPOSED MULLIONS AND VERTICAL BUTT GLAZING W-5 TYPE W-5: -CURTAIN WALL WITH 1" INSULATED SPANDREL PANEL, HORIZONTAL EXPOSED MULLIONS AND VERTICAL BUTT GLAZING W-6 TYPE W-6: -3" INSULATED POLYCARBONITE PANEL SYSTEM FIRST FLOOR 100' - 0" ITS / ES PARAPET 130' - 0" SCREEN WALL PARAPET 140' - 0" SECOND FLOOR 115' - 0" E A E B E C E D E E E F E G E H E J E K E L E M W-1 W-3 W-2 W-6 W-4 W-1 W-4 W-3 W-4 W-5 FIRST FLOOR 100' - 0" ITS / ES PARAPET 130' - 0" SCREEN WALL PARAPET 140' - 0" SECOND FLOOR 115' - 0" E 15 E 13 E 11 E 9 E 7 E 5 E 3 E 1 W-1 W-4 W-2 W-3 W-1 W-2 W-1 FIRST FLOOR 100' - 0" ITS / ES PARAPET 130' - 0" SCREEN WALL PARAPET 140' - 0" SECOND FLOOR 115' - 0" E 15 E 14 E 13 E 12 E 11 E 10 E 9 E 8 E 7 E 6 E 5 E 4 E 3 E 2 E 1 W-4 W-1 W-3 W-5 W-2 W-4 W-5 W-2 W-1 AE-205 2 AE-205 1 AE-205 3 LINK-N-GREENS FORT COLLINS PROJECT DEVELOPMENT PLAN SUBMITTAL GHAFARI ASSOCIATES © 2013 REVISIONS: DATE: GHAFARI ASSOCIATES, LLC 122 S MICHIGAN AVE, SUITE 1500 CHICAGO, IL 60603 USA TEL +1.312.984.2300 www.ghafari.com PDP SUBMITTAL 01-14-13 PDP RESUBMITTAL 01-30-13 ARCHITECTURAL ELEVATION CONCEPTS ES BUILDING JANUARY 14, 2013 AE-205 PHASE III: ENGINE SYSTEMS AE-205 SCALE: 1/16" = 1'-0" 2 ES BUILDING WEST ELEVATION AE-205 SCALE: 1/16" = 1'-0" 1 ES BUILDING NORTH ELEVATION AE-205 SCALE: 1/16" = 1'-0" 3 ES BUILDING SOUTH ELEVATION SCALE: NORTH 1" = 120'-0" PDP FLOOR PLAN KEY