Loading...
HomeMy WebLinkAbout320 MAPLE MIXED-USE - FDP - FDP160032 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH 320 Maple Street TIS, November 2015 ASSOCIATES The posted speed limit in this area of Cherry Street is 25 mph. There is parallel parking along both sides of Cherry Street. There are sidewalks along both sides of Cherry Street. There are bicycle lanes along Cherry Street The Alley is to the east of (adjacent to) the proposed 320 Maple Street site. Currently, the alley is 20 feet in width in this area. At the Maple/Alley and Cherry/Alley intersections, the Alley has all movements combined into a single lane. Figure 3 shows recent peak hour counts at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. The traffic volumes at the Maple/Alley and Cherry/Alley intersections were collected in October 2015. The traffic volumes at the Howes/Maple intersection were collected in November 2015. Raw traffic data is provided in Appendix B. Table 1 shows the current morning and afternoon peak hour operation of the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. The Howes/Maple, Maple/Alley, and Cherry/Alley intersections currently meets the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with existing control and geometry. Calculation forms are provided in Appendix C. A description of level of service for unsignalized intersections from the 2010 Highway Capacity Manual is provided in Appendix C. Table 4-3 (revised per staff comments regarding type of intersection) showing the Fort Collins Motor Vehicle LOS Standards (Intersections) is also provided in Appendix C. The 320 Maple Street site is in an area termed “mixed use districts.” In areas termed “mixed use districts,” acceptable operation at unsignalized intersections, acceptable operation is considered to be at level of service F for any approach leg for an arterial/arterial, arterial/collector and arterial/local intersections. In such areas, it is expected that there would be substantial delays to the minor street movements at unsignalized intersections during the peak hours. This is considered to be normal in urban areas. At unsignalized collector/local intersections, acceptable operation is considered to be at level of service C for any approach leg. Sight distance was evaluated at the Howes/Maple intersection. In this area, there are no significant horizontal curves and no vertical curves along Howes Street for at least 0.25 miles. This area is within the grid street system in the Fort Collins central business district (CBD). According to LCUASS, the design speed, based upon the classification of the street, should be used to determine the intersection sight distance. Howes Street is classified as two-lane arterial street. At the design of 50 mph and a passenger car design vehicle, the intersection sight distance should be 1030 feet in both directions from the Maple Street according to LCUASS, Figure 7-16. However, since the posted speed is 25 mph and this intersection is located in the CBD, application of the 50 mph design speed is not appropriate. It is more appropriate to use a design speed of 30 mph (5 mph above the posted speed). At a design speed of 30 mph the intersection sight distance is 225 feet (AASHTO, 2011, Table 9-6). The intersection sight distance was evaluated using aerial photographs and field verification. There is on-street parking that can reduce the sight distance depending on the size and location of the parked vehicle. For the westbound vehicle on Maple Street, the stopped vehicle was behind the pedestrian crosswalk. To the north the intersection sight distance is approximately 215 feet. If desired, the ‘no parking’ area on the east side of DELICH 320 Maple Street TIS, November 2015 ASSOCIATES Howes Street could be extended to achieve a sight distance of 225 feet. To the south, there is one curb parking space between Maple Street and a driveway on the east side of Howes Street. A vehicle in this space significantly impacts the sight line. Elimination of this parking space will allow adequate intersection sight distance (225 feet). For the eastbound vehicle on Maple Street, there is no predestination crosswalk or stop bar. With a vehicle stopped at the stop sign, the intersection sight distance is significantly less than 225 feet. At the Howes/Maple intersection, eastbound vehicles will typically move forward until there is adequate sight distance to execute a safe entry into the intersection. This was observed to occur during field observations. With the driver’s eye at the west curb of Howes Street, there is adequate intersection sight distance (≥225 feet) for eastbound vehicles. A vehicle at this location does not extend into Howes Street. It is suggested that the City conduct more rigorous sight distance evaluations at the Howes/Maple intersection. The evaluations may indicate elimination of some parking spaces may be appropriate. Figure 4 shows the site plan for the 320 Maple Street. The 320 Maple Street is a mixed use development consisting of 5,000 square feet of office and a 30 dwelling unit apartment building. Currently the site has a vacant building on the site. The building will be razed with 320 Maple Street development. Access to the on-site parking will be via the alley. Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. Apartment (Code 220) and General Office (Code 710) contain in Trip Generation, 9th Edition, ITE was used to estimate the trips that would be generated by the proposed/expected use at a site. A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows the expected trip generation on a daily and peak hour basis. The trip generation of the 320 Maple Street development resulted in 362 daily trip ends; 23 morning peak hour trip ends; and 26 afternoon peak hour trip ends. Directional distribution of the generated trips was determined for 320 Maple Street development and is shown in Figure 5. Figure 6 shows the site generated peak hour traffic assignment of the 320 Maple Street development Figure 7 shows the short range (2020) background morning and afternoon peak hour traffic at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. Traffic volumes along Howes Street, Maple Street, and Cherry Street were increased at a rate of 2.0 percent per year. Table 3 shows the short range (2020) background morning and afternoon peak hour operation at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. Calculation forms are provided in Appendix D. The Howes/Maple, Maple/Alley, and Cherry/Alley intersections will meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with the existing control and geometry in the short range (2020) future. Figure 8 shows the short range (2020) total morning and afternoon peak hour traffic at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. Table 4 shows the short range (2020) total morning and afternoon peak hour operation at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. Calculation forms are provided in Appendix E. The Howes/Maple, Maple/Alley, and Cherry/Alley intersections will meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with the existing control and geometry. DELICH 320 Maple Street TIS, November 2015 ASSOCIATES The recommended short range (2020) geometry is shown in Figure 9. This is the existing geometry at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections. The 320 Maple Street site is in an area within which the City requires pedestrian and bicycle level of service evaluations. Appendix F shows a map of the area that is within 1320 feet of the 320 Maple Street site. The 320 Maple Street site is located within an area termed as “pedestrian district,” which sets the pedestrian level of service threshold at LOS A for all measured categories, except for Street Crossing at LOS B. There are four destination areas within 1320 feet of the proposed development at 320 Maple Street: 1) the residential area to the west, 2) the residential area to the north, 3) the commercial area (CBD) to the east, and 4) the commercial (CBD) area to the south. This development will build sidewalks along the site frontage. Appendix F contains a Pedestrian LOS Worksheet. Based upon Fort Collins Bicycle LOS criteria, the fort Collins CBD is a bicycle destination within 1320 feet of the 320 Maple Street site. Appendix F contains a Bicycle LOS Worksheet. The bicycle level of service will be met. Currently, this area is served by Transfort. The Downtown Transit Center is along Mason Street, within 1000 feet of the site. It is concluded that, with development of 320 Maple Street, the future level of service at the Howes/Maple, Maple/Alley, and Cherry/Alley intersections will be acceptable. Additional auxiliary lanes are not required at the key intersections. There are intersection sight distance constraints at the Howes/maple intersection. The City should conduct more rigorous sight distance evaluations. Acceptable level of service is achieved for alternative transportation modes. SCALE: 1"=500' SITE LOCATION Figure 1 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Cherry Street Maple Street College Avenue Meldrum Street Mason Street Howes Street 320 Maple Street CURRENT GEOMETRY Figure 2 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street - Denotes Lane Howes Street Cherry Street RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street Howes Street Cherry Street AM/PM 21/7 73/143 38/31 14/4 176/151 14/10 3/5 76/74 10/16 6/15 70/97 48/38 235/525 2/0 418/288 0/1 0/0 1/3 1/8 1/9 7/1 79/120 0/3 84/115 DELICH 320 Maple Street TIS, November 2015 ASSOCIATES TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Howes/Maple (stop sign) EB LT/T/RT B B WB LT/T/RT B B NB LT/T/RT A A SB LT/T/RT A A Maple/Alley (stop sign) EB LT/T A A SB LT/RT A A Cherry/Alley (stop sign) WB LT/T A A NB LT/RT B B TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 220 Apartment 30 Dwelling Units Eq. 306 Eq. 3 Eq. 12 Eq. 12 Eq. 7 710 General Office 5.0 KSF 11.03 56 1.37 7 0.19 1 0.25 1 1.24 6 Total 362 10 13 13 13 SITE PLAN Figure 4 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 SCALE 1"=40' TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street Howes Street Cherry Street 35% 10% 30% 15% 5% 5% SITE SITE GENERATED PEAK HOUR TRAFFIC Figure 6 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street Howes Street Cherry Street AM/PM 3/4 1/1 1/1 4/4 4/4 4/4 1/1 0/1 1/1 1/1 2/2 9/9 8/9 1/2 SHORT RANGE (2020) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street Howes Street Cherry Street AM/PM 23/8 81/158 42/34 15/4 194/167 15/11 3/6 84/82 11/18 7/17 77/107 53/42 259/580 2/0 462/318 0/1 0/0 1/3 1/8 1/9 7/1 87/132 0/3 93/127 DELICH 320 Maple Street TIS, November 2015 ASSOCIATES TABLE 3 Short Range (2020) Background Peak Hour Operation Intersection Movement Level of Service AM PM Howes/Maple (stop sign) EB LT/T/RT B B WB LT/T/RT C C NB LT/T/RT A A SB LT/T/RT A A Maple/Alley (stop sign) EB LT/T A A SB LT/RT A A Cherry/Alley (stop sign) WB LT/T A A NB LT/RT B B TABLE 4 Short Range (2020) Total Peak Hour Operation Intersection Movement Level of Service AM PM Howes/Maple (stop sign) EB LT/T/RT B B WB LT/T/RT C C NB LT/T/RT A A SB LT/T/RT A A Maple/Alley (stop sign) EB LT/T A A SB LT/RT A B Cherry/Alley (stop sign) WB LT/T A A NB LT/RT B B SHORT RANGE (2020) TOTAL PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street Howes Street Cherry Street AM/PM 26/12 81/158 42/34 16/5 194/167 15/11 4/7 88/86 15/22 7/17 81/111 53/42 259/580 3/1 462/318 0/2 1/1 2/4 3/10 10/18 15/10 87/132 1/5 93/127 SHORT RANGE (2020) GEOMETRY Figure 9 DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Alley Maple Street - Denotes Lane Howes Street Cherry Street APPENDIX A 1 2 APPENDIX B 3 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 11/3/15 Observer: Sue Day: Tuesday Jurisdiction: Fort Collins R = right turn Intersection: Howes/Maple S = straight L = left turn Time Northbound: Howes Southbound: Howes Total Eastbound: Maple Westbound: Maple Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 2412 18 3402 45 63 2202 24 7141 22 46 109 7:45 71914 40 4523 59 99 1223 26 13 15 1 29 55 154 8:00 8176 31 2506 58 89 0164 20 16 20 2 38 58 147 8:15 4336 43 5343 42 85 0181 19 12 21 2 35 54 139 7:30-8:30 21 73 38 132 14 176 14 204 336 3 76 108948 70 6124213 549 PHF 0.66 0.55 0.68 0.77 0.7 0.85 0.58 0.86 0.85 0.38 0.86 0.63 0.86 0.75 0.83 0.75 0.82 0.92 0.89 4:30 2324 38 1271 29 67 0141 15 10 17 9 36 51 118 4:45 32916 48 3372 42 90 4155 24 9315 45 69 159 5:00 0388 46 4560 60 106 0277 34 14 26 1 41 75 181 5:15 2443 49 2311 34 83 1183 22 5230 28 50 133 4:30-5:30 7 143 31 181 10 151 4 165 346 5 74 169538 97 15150245 591 PHF 0.58 0.81 0.48 0.92 0.63 0.67 0.5 0.69 0.82 0.31 0.69 0.57 0.7 0.68 0.78 0.42 0.83 0.82 0.82 4 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 10/28/15 Observer: Joseph Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Maple/Alley S = straight L = left turn Time Northbound: Southbound: Alley Total Eastbound: Maple Westbound: Maple Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 0 10 1 1 020 20 19 0 19 39 40 7:45 0 01 1 1 024 24 14 1 15 39 40 8:00 0 00 0 0 023 23 18 0 18 41 41 8:15 0 00 0 0 017 17 28 6 34 51 51 7:30-8:30 0 0 0 0 1 0 1 2 2 0840 84 0797 86 170 172 PHF n/a n/a n/a n/a 0.25 n/a 0.25 0.5 0.5 n/a 0.88 n/a 0.88 n/a 0.71 0.29 0.63 0.83 0.84 4:30 0 00 0 0 021 21 24 0 24 45 45 4:45 0 20 2 2 326 29 34 0 34 63 65 5:00 0 13 4 4 038 38 33 0 33 71 75 5:15 0 65 11 11 030 30 29 1 30 60 71 4:30-5:30 0 0 0 0 9 0 8 17 17 3 115 0 118 0 120 1 121 239 256 PHF n/a n/a n/a n/a 0.38 n/a 0.4 0.39 0.39 0.25 0.76 n/a 0.78 n/a 0.88 0.25 0.89 0.84 0.85 5 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 10/28/15 Observer: Sue Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Cherry/Alley S = straight L = left turn Time Northbound: Alley Southbound: Total Eastbound: Cherry Westbound: Cherry Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 00 00 0 115 0 115 051 51 166 166 7:45 00 00 0 108 0 108 067 67 175 175 8:00 00 00 0 86 0 86 264 66 152 152 8:15 01 10 1 109 0 109 053 53 162 163 7:30-8:30 0 0 1 1 0 0 0 0 1 0 418 0 418 2 235 0 237 655 656 PHF n/a n/a 0.25 0.25 n/a n/a n/a n/a 0.25 n/a 0.91 n/a 0.91 0.25 0.88 n/a 0.88 0.94 0.94 4:30 00 00 0 65 0 65 0 106 106 171 171 4:45 02 20 2 72 0 72 0 139 139 211 213 5:00 00 00 0 79 1 80 0 137 137 217 217 5:15 01 10 1 72 0 72 0 143 143 215 216 4:30-5:30 0 0 3 3 0 0 0 0 3 0 288 1 289 0 525 0 525 814 817 PHF n/a n/a 0.38 0.38 n/a n/a n/a n/a 0.38 n/a 0.91 0.25 0.9 n/a 0.92 n/a 0.92 0.94 0.94 6 APPENDIX C 7 HCM 2010 TWSC 3: Howes & Maple recent am 11/9/2015 Baseline Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 5.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 3 76 10 48 70 6 21 73 38 14 176 14 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 3 83 11 52 76 7 23 79 41 15 191 15 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 416 395 199 422 383 100 207 0 0 121 0 0 Stage 1 229 229 - 146 146 - - - - - - - Stage 2 187 166 - 276 237 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 547 542 842 542 550 956 1364 - - 1467 - - Stage 1 774 715 - 857 776 - - - - - - - Stage 2 815 761 - 730 709 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 473 526 842 460 534 956 1364 - - 1467 - - Mov Cap-2 Maneuver 473 526 - 460 534 - - - - - - - Stage 1 760 706 - 842 762 - - - - - - - Stage 2 716 747 - 629 700 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 13 14.5 1.2 0.5 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1364 - - 547 513 1467 - - HCM Lane V/C Ratio 0.017 - - 0.177 0.263 0.01 - - HCM Control Delay (s) 7.7 0 - 13 14.5 7.5 0 - HCM Lane LOS A A - BBAA- HCM 95th %tile Q(veh) 0.1 - - 0.6 1 0 - - 8 Lanes and Geometrics 3: Howes & Maple recent am 11/9/2015 Baseline Synchro 9 Light Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.985 0.993 0.961 0.991 Flt Protected 0.998 0.981 0.992 0.997 Satd. Flow (prot) 0 1831 0 0 1815 0 0 1776 0 0 1840 0 Flt Permitted 0.998 0.981 0.992 0.997 Satd. Flow (perm) 0 1831 0 0 1815 0 0 1776 0 0 1840 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 847 476 297 335 Travel Time (s) 19.3 10.8 6.8 7.6 Intersection Summary Area Type: Other 9 HCM 2010 TWSC 3: Howes & Maple recent pm 11/9/2015 Baseline Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 74 16 38 97 15 7 143 31 10 151 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 80 17 41 105 16 8 155 34 11 164 4 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 436 392 166 425 378 172 168 0 0 189 0 0 Stage 1 188 188 - 188 188 - - - - - - - Stage 2 248 204 - 237 190 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 531 544 878 540 554 872 1410 - - 1385 - - Stage 1 814 745 - 814 745 - - - - - - - Stage 2 756 733 - 766 743 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 439 536 878 463 546 872 1410 - - 1385 - - Mov Cap-2 Maneuver 439 536 - 463 546 - - - - - - - Stage 1 809 738 - 809 741 - - - - - - - Stage 2 632 729 - 663 736 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 12.8 14.5 0.3 0.5 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1410 - - 567 542 1385 - - HCM Lane V/C Ratio 0.005 - - 0.182 0.301 0.008 - - HCM Control Delay (s) 7.6 0 - 12.8 14.5 7.6 0 - HCM Lane LOS A A - BBAA- HCM 95th %tile Q(veh) 0 - - 0.7 1.3 0 - - 10 Lanes and Geometrics 3: Howes & Maple recent pm 11/9/2015 Baseline Synchro 9 Light Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.977 0.987 0.977 0.997 Flt Protected 0.998 0.988 0.998 0.997 Satd. Flow (prot) 0 1816 0 0 1816 0 0 1816 0 0 1852 0 Flt Permitted 0.998 0.988 0.998 0.997 Satd. Flow (perm) 0 1816 0 0 1816 0 0 1816 0 0 1852 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 847 476 297 335 Travel Time (s) 19.3 10.8 6.8 7.6 Intersection Summary Area Type: Other 11 HCM 2010 TWSC 6: Maple & Alley recent am 11/9/2015 Baseline Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 0 84 79 7 1 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 91 86 8 1 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 93 0 - 0 181 90 Stage 1 - - - - 90 - Stage 2 - - - - 91 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1501 - - - 808 968 Stage 1 - - - - 934 - Stage 2 - - - - 933 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1501 - - - 808 968 Mov Cap-2 Maneuver - - - - 808 - Stage 1 - - - - 934 - Stage 2 - - - - 933 - Approach EB WB SB HCM Control Delay, s 0 0 9.1 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1501 - - - 881 HCM Lane V/C Ratio ---- 0.002 HCM Control Delay (s) 0 - - - 9.1 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 12 Lanes and Geometrics 6: Maple & Alley recent am 11/9/2015 Baseline Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.989 0.932 Flt Protected 0.976 Satd. Flow (prot) 0 1863 1842 0 1694 0 Flt Permitted 0.976 Satd. Flow (perm) 0 1863 1842 0 1694 0 Link Speed (mph) 30 30 30 Link Distance (ft) 502 847 802 Travel Time (s) 11.4 19.3 18.2 Intersection Summary Area Type: Other 13 HCM 2010 TWSC 6: Maple & Alley recent pm 11/9/2015 Baseline Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.7 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 3 115 120 1 9 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 3 125 130 1 10 9 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 132 0 - 0 263 131 Stage 1 - - - - 131 - Stage 2 - - - - 132 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1453 - - - 726 919 Stage 1 - - - - 895 - Stage 2 - - - - 894 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1453 - - - 725 919 Mov Cap-2 Maneuver - - - - 725 - Stage 1 - - - - 895 - Stage 2 - - - - 892 - Approach EB WB SB HCM Control Delay, s 0.2 0 9.6 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1453 - - - 805 HCM Lane V/C Ratio 0.002 - - - 0.023 HCM Control Delay (s) 7.5 0 - - 9.6 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 14 Lanes and Geometrics 6: Maple & Alley recent pm 11/9/2015 Baseline Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.999 0.936 Flt Protected 0.999 0.974 Satd. Flow (prot) 0 1861 1861 0 1698 0 Flt Permitted 0.999 0.974 Satd. Flow (perm) 0 1861 1861 0 1698 0 Link Speed (mph) 30 30 30 Link Distance (ft) 502 847 802 Travel Time (s) 11.4 19.3 18.2 Intersection Summary Area Type: Other 15 HCM 2010 TWSC 8: Alley & Cherry recent am 11/9/2015 Baseline Synchro 9 Light Report Page 6 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 418 0 2 235 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 454 0 2 255 0 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 454 0 714 454 Stage 1 - - - - 454 - Stage 2 - - - - 260 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1107 - 398 606 Stage 1 - - - - 640 - Stage 2 - - - - 783 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1107 - 397 606 Mov Cap-2 Maneuver - - - - 397 - Stage 1 - - - - 640 - Stage 2 - - - - 781 - Approach EB WB NB HCM Control Delay, s 0 0.1 11 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 606 - - 1107 - HCM Lane V/C Ratio 0.002 - - 0.002 - HCM Control Delay (s) 11 - - 8.3 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0 - - 0 - 16 Lanes and Geometrics 8: Alley & Cherry recent am 11/9/2015 Baseline Synchro 9 Light Report Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected Satd. Flow (prot) 1863 0 0 1863 1611 0 Flt Permitted Satd. Flow (perm) 1863 0 0 1863 1611 0 Link Speed (mph) 30 30 30 Link Distance (ft) 653 517 802 Travel Time (s) 14.8 11.8 18.2 Intersection Summary Area Type: Other 17 HCM 2010 TWSC 8: Alley & Cherry recent pm 11/9/2015 Baseline Synchro 9 Light Report Page 6 Intersection Int Delay, s/veh 0 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 288 1 0 525 0 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 313 1 0 571 0 3 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 314 0 885 314 Stage 1 - - - - 314 - Stage 2 - - - - 571 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1246 - 315 726 Stage 1 - - - - 741 - Stage 2 - - - - 565 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1246 - 315 726 Mov Cap-2 Maneuver - - - - 315 - Stage 1 - - - - 741 - Stage 2 - - - - 565 - Approach EB WB NB HCM Control Delay, s 0 0 10 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 726 - - 1246 - HCM Lane V/C Ratio 0.004 ---- HCM Control Delay (s) 10 - - 0 - HCM Lane LOS B - - A - HCM 95th %tile Q(veh) 0 - - 0 - 18 Lanes and Geometrics 8: Alley & Cherry recent pm 11/9/2015 Baseline Synchro 9 Light Report Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected Satd. Flow (prot) 1863 0 0 1863 1611 0 Flt Permitted Satd. Flow (perm) 1863 0 0 1863 1611 0 Link Speed (mph) 30 30 30 Link Distance (ft) 653 517 802 Travel Time (s) 14.8 11.8 18.2 Intersection Summary Area Type: Other 19 UNSIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50 20 Table 4-3 Fort Collins (GMA and City Limits) Motor Vehicle LOS Standards (Intersections) Intersection type Land Use (from structure plan) Commercial corridors Other corridors within: Mixed use districts Low density mixed use residential All other areas Signalized intersections (overall) D E* D D Any Leg E E D E Any Movement E E D E Stop sign control (arterial/arterial, arterial/collector or local- any approach leg) N/A F** F** E Stop sign control (collector/local--any approach leg) N/A C C C * mitigating measures required ** considered normal in an urban environment 21 APPENDIX D 22 HCM 2010 TWSC 3: Howes & Maple short background am 11/9/2015 Baseline Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 6.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 3 84 11 53 77 7 23 81 42 15 194 15 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 3 91 12 58 84 8 25 88 46 16 211 16 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 459 436 219 464 421 111 227 0 0 134 0 0 Stage 1 252 252 - 161 161 - - - - - - - Stage 2 207 184 - 303 260 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 512 514 821 508 524 942 1341 - - 1451 - - Stage 1 752 698 - 841 765 - - - - - - - Stage 2 795 747 - 706 693 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 433 497 821 420 507 942 1341 - - 1451 - - Mov Cap-2 Maneuver 433 497 - 420 507 - - - - - - - Stage 1 737 689 - 824 750 - - - - - - - Stage 2 687 732 - 596 684 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 13.7 15.8 1.2 0.5 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1341 - - 518 480 1451 - - HCM Lane V/C Ratio 0.019 - - 0.206 0.31 0.011 - - HCM Control Delay (s) 7.7 0 - 13.7 15.8 7.5 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0.1 - - 0.8 1.3 0 - - 23 Lanes and Geometrics 3: Howes & Maple short background am 11/9/2015 Baseline Synchro 9 Light Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.985 0.993 0.961 0.991 Flt Protected 0.999 0.981 0.992 0.997 Satd. Flow (prot) 0 1833 0 0 1815 0 0 1776 0 0 1840 0 Flt Permitted 0.999 0.981 0.992 0.997 Satd. Flow (perm) 0 1833 0 0 1815 0 0 1776 0 0 1840 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 847 476 297 335 Travel Time (s) 19.3 10.8 6.8 7.6 Intersection Summary Area Type: Other 24 HCM 2010 TWSC 3: Howes & Maple short background pm 11/9/2015 Baseline Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 6.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 6 82 18 42 107 17 8 158 34 11 167 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 89 20 46 116 18 9 172 37 12 182 4 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 483 434 184 470 418 190 186 0 0 209 0 0 Stage 1 208 208 - 208 208 - - - - - - - Stage 2 275 226 - 262 210 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 494 515 858 504 526 852 1388 - - 1362 - - Stage 1 794 730 - 794 730 - - - - - - - Stage 2 731 717 - 743 728 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 395 506 858 421 517 852 1388 - - 1362 - - Mov Cap-2 Maneuver 395 506 - 421 517 - - - - - - - Stage 1 788 723 - 788 725 - - - - - - - Stage 2 596 712 - 630 721 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 13.6 15.9 0.3 0.5 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1388 - - 535 508 1362 - - HCM Lane V/C Ratio 0.006 - - 0.215 0.355 0.009 - - HCM Control Delay (s) 7.6 0 - 13.6 15.9 7.7 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0 - - 0.8 1.6 0 - - 25 Lanes and Geometrics 3: Howes & Maple short background pm 11/9/2015 Baseline Synchro 9 Light Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.977 0.986 0.977 0.997 Flt Protected 0.997 0.987 0.998 0.997 Satd. Flow (prot) 0 1814 0 0 1813 0 0 1816 0 0 1852 0 Flt Permitted 0.997 0.987 0.998 0.997 Satd. Flow (perm) 0 1814 0 0 1813 0 0 1816 0 0 1852 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 847 476 297 335 Travel Time (s) 19.3 10.8 6.8 7.6 Intersection Summary Area Type: Other 26 HCM 2010 TWSC 6: Maple & Alley short background am 11/9/2015 Baseline Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 0 93 87 7 1 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 101 95 8 1 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 102 0 - 0 199 98 Stage 1 - - - - 98 - Stage 2 - - - - 101 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1490 - - - 790 958 Stage 1 - - - - 926 - Stage 2 - - - - 923 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1490 - - - 790 958 Mov Cap-2 Maneuver - - - - 790 - Stage 1 - - - - 926 - Stage 2 - - - - 923 - Approach EB WB SB HCM Control Delay, s 0 0 9.2 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1490 - - - 866 HCM Lane V/C Ratio ---- 0.003 HCM Control Delay (s) 0 - - - 9.2 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 27 Lanes and Geometrics 6: Maple & Alley short background am 11/9/2015 Baseline Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.990 0.932 Flt Protected 0.976 Satd. Flow (prot) 0 1863 1844 0 1694 0 Flt Permitted 0.976 Satd. Flow (perm) 0 1863 1844 0 1694 0 Link Speed (mph) 30 30 30 Link Distance (ft) 502 847 802 Travel Time (s) 11.4 19.3 18.2 Intersection Summary Area Type: Other 28 HCM 2010 TWSC 6: Maple & Alley short background pm 11/9/2015 Baseline Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.7 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 3 127 132 1 9 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 3 138 143 1 10 9 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 145 0 - 0 289 144 Stage 1 - - - - 144 - Stage 2 - - - - 145 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1437 - - - 702 903 Stage 1 - - - - 883 - Stage 2 - - - - 882 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1437 - - - 701 903 Mov Cap-2 Maneuver - - - - 701 - Stage 1 - - - - 883 - Stage 2 - - - - 880 - Approach EB WB SB HCM Control Delay, s 0.2 0 9.7 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1437 - - - 783 HCM Lane V/C Ratio 0.002 - - - 0.024 HCM Control Delay (s) 7.5 0 - - 9.7 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 29 Lanes and Geometrics 6: Maple & Alley short background pm 11/9/2015 Baseline Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.999 0.936 Flt Protected 0.999 0.974 Satd. Flow (prot) 0 1861 1861 0 1698 0 Flt Permitted 0.999 0.974 Satd. Flow (perm) 0 1861 1861 0 1698 0 Link Speed (mph) 30 30 30 Link Distance (ft) 502 847 802 Travel Time (s) 11.4 19.3 18.2 Intersection Summary Area Type: Other 30 HCM 2010 TWSC 8: Alley & Cherry short background am 11/9/2015 Baseline Synchro 9 Light Report Page 6 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 462 0 2 259 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 502 0 2 282 0 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 502 0 788 502 Stage 1 - - - - 502 - Stage 2 - - - - 286 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1062 - 360 569 Stage 1 - - - - 608 - Stage 2 - - - - 763 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1062 - 359 569 Mov Cap-2 Maneuver - - - - 359 - Stage 1 - - - - 608 - Stage 2 - - - - 761 - Approach EB WB NB HCM Control Delay, s 0 0.1 11.3 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 569 - - 1062 - HCM Lane V/C Ratio 0.002 - - 0.002 - HCM Control Delay (s) 11.3 - - 8.4 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0 - - 0 - 31 Lanes and Geometrics 8: Alley & Cherry short background am 11/9/2015 Baseline Synchro 9 Light Report Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected Satd. Flow (prot) 1863 0 0 1863 1611 0 Flt Permitted Satd. Flow (perm) 1863 0 0 1863 1611 0 Link Speed (mph) 30 30 30 Link Distance (ft) 653 517 802 Travel Time (s) 14.8 11.8 18.2 Intersection Summary Area Type: Other 32 HCM 2010 TWSC 8: Alley & Cherry short background pm 11/9/2015 Baseline Synchro 9 Light Report Page 6 Intersection Int Delay, s/veh 0 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 318 1 0 580 0 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 346 1 0 630 0 3 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 347 0 976 346 Stage 1 - - - - 346 - Stage 2 - - - - 630 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1212 - 279 697 Stage 1 - - - - 716 - Stage 2 - - - - 531 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1212 - 279 697 Mov Cap-2 Maneuver - - - - 279 - Stage 1 - - - - 716 - Stage 2 - - - - 531 - Approach EB WB NB HCM Control Delay, s 0 0 10.2 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 697 - - 1212 - HCM Lane V/C Ratio 0.005 ---- HCM Control Delay (s) 10.2 - - 0 - HCM Lane LOS B - - A - HCM 95th %tile Q(veh) 0 - - 0 - 33 Lanes and Geometrics 8: Alley & Cherry short background pm 11/9/2015 Baseline Synchro 9 Light Report Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected Satd. Flow (prot) 1863 0 0 1863 1611 0 Flt Permitted Satd. Flow (perm) 1863 0 0 1863 1611 0 Link Speed (mph) 30 30 30 Link Distance (ft) 653 517 802 Travel Time (s) 14.8 11.8 18.2 Intersection Summary Area Type: Other 34 APPENDIX E 35 HCM 2010 TWSC 3: Howes & Maple short total am 11/9/2015 Baseline Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 6.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 4 88 15 53 81 7 26 81 42 15 194 16 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 96 16 58 88 8 28 88 46 16 211 17 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 467 442 220 475 428 111 228 0 0 134 0 0 Stage 1 252 252 - 167 167 - - - - - - - Stage 2 215 190 - 308 261 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 506 510 820 500 519 942 1340 - - 1451 - - Stage 1 752 698 - 835 760 - - - - - - - Stage 2 787 743 - 702 692 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 423 492 820 406 500 942 1340 - - 1451 - - Mov Cap-2 Maneuver 423 492 - 406 500 - - - - - - - Stage 1 735 689 - 816 743 - - - - - - - Stage 2 672 726 - 585 683 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 14 16.3 1.4 0.5 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1340 - - 518 470 1451 - - HCM Lane V/C Ratio 0.021 - - 0.225 0.326 0.011 - - HCM Control Delay (s) 7.7 0 - 14 16.3 7.5 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0.1 - - 0.9 1.4 0 - - 36 Lanes and Geometrics 3: Howes & Maple short total am 11/9/2015 Baseline Synchro 9 Light Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.981 0.993 0.962 0.991 Flt Protected 0.998 0.982 0.991 0.997 Satd. Flow (prot) 0 1824 0 0 1816 0 0 1776 0 0 1840 0 Flt Permitted 0.998 0.982 0.991 0.997 Satd. Flow (perm) 0 1824 0 0 1816 0 0 1776 0 0 1840 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 847 476 297 335 Travel Time (s) 19.3 10.8 6.8 7.6 Intersection Summary Area Type: Other 37 HCM 2010 TWSC 3: Howes & Maple short total pm 11/9/2015 Baseline Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 6.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 7 86 22 42 111 17 12 158 34 11 167 5 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 8 93 24 46 121 18 13 172 37 12 182 5 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 494 443 184 483 427 190 187 0 0 209 0 0 Stage 1 208 208 - 216 216 - - - - - - - Stage 2 286 235 - 267 211 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 486 509 858 494 520 852 1387 - - 1362 - - Stage 1 794 730 - 786 724 - - - - - - - Stage 2 721 710 - 738 728 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 383 498 858 405 509 852 1387 - - 1362 - - Mov Cap-2 Maneuver 383 498 - 405 509 - - - - - - - Stage 1 785 723 - 777 716 - - - - - - - Stage 2 580 702 - 618 721 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 13.9 16.5 0.4 0.5 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1387 - - 531 497 1362 - - HCM Lane V/C Ratio 0.009 - - 0.235 0.372 0.009 - - HCM Control Delay (s) 7.6 0 - 13.9 16.5 7.7 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0 - - 0.9 1.7 0 - - 38 Lanes and Geometrics 3: Howes & Maple short total pm 11/9/2015 Baseline Synchro 9 Light Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.974 0.987 0.977 0.997 Flt Protected 0.997 0.988 0.997 0.997 Satd. Flow (prot) 0 1809 0 0 1816 0 0 1814 0 0 1852 0 Flt Permitted 0.997 0.988 0.997 0.997 Satd. Flow (perm) 0 1809 0 0 1816 0 0 1814 0 0 1852 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 847 476 297 335 Travel Time (s) 19.3 10.8 6.8 7.6 Intersection Summary Area Type: Other 39 HCM 2010 TWSC 6: Maple & Alley short total am 11/9/2015 Baseline Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.6 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 1 93 87 15 10 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 101 95 16 11 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 111 0 - 0 206 103 Stage 1 - - - - 103 - Stage 2 - - - - 103 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1479 - - - 782 952 Stage 1 - - - - 921 - Stage 2 - - - - 921 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1479 - - - 781 952 Mov Cap-2 Maneuver - - - - 781 - Stage 1 - - - - 921 - Stage 2 - - - - 920 - Approach EB WB SB HCM Control Delay, s 0.1 0 9.5 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1479 - - - 815 HCM Lane V/C Ratio 0.001 - - - 0.017 HCM Control Delay (s) 7.4 0 - - 9.5 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 40 Lanes and Geometrics 6: Maple & Alley short total am 11/9/2015 Baseline Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.981 0.971 Flt Protected 0.962 Satd. Flow (prot) 0 1863 1827 0 1740 0 Flt Permitted 0.962 Satd. Flow (perm) 0 1863 1827 0 1740 0 Link Speed (mph) 30 30 30 Link Distance (ft) 502 847 802 Travel Time (s) 11.4 19.3 18.2 Intersection Summary Area Type: Other 41 HCM 2010 TWSC 6: Maple & Alley short total pm 11/9/2015 Baseline Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 1.1 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 5 127 132 10 18 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 138 143 11 20 11 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 154 0 - 0 298 149 Stage 1 - - - - 149 - Stage 2 - - - - 149 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1426 - - - 693 898 Stage 1 - - - - 879 - Stage 2 - - - - 879 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1426 - - - 690 898 Mov Cap-2 Maneuver - - - - 690 - Stage 1 - - - - 879 - Stage 2 - - - - 875 - Approach EB WB SB HCM Control Delay, s 0.3 0 10 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1426 - - - 752 HCM Lane V/C Ratio 0.004 - - - 0.04 HCM Control Delay (s) 7.5 0 - - 10 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 42 Lanes and Geometrics 6: Maple & Alley short total pm 11/9/2015 Baseline Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.990 0.952 Flt Protected 0.998 0.969 Satd. Flow (prot) 0 1859 1844 0 1718 0 Flt Permitted 0.998 0.969 Satd. Flow (perm) 0 1859 1844 0 1718 0 Link Speed (mph) 30 30 30 Link Distance (ft) 502 847 802 Travel Time (s) 11.4 19.3 18.2 Intersection Summary Area Type: Other 43 HCM 2010 TWSC 8: Alley & Cherry short total am 11/9/2015 Baseline Synchro 9 Light Report Page 6 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 462 0 3 259 1 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 502 0 3 282 1 2 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 502 0 790 502 Stage 1 - - - - 502 - Stage 2 - - - - 288 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1062 - 359 569 Stage 1 - - - - 608 - Stage 2 - - - - 761 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1062 - 358 569 Mov Cap-2 Maneuver - - - - 358 - Stage 1 - - - - 608 - Stage 2 - - - - 759 - Approach EB WB NB HCM Control Delay, s 0 0.1 12.6 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 476 - - 1062 - HCM Lane V/C Ratio 0.007 - - 0.003 - HCM Control Delay (s) 12.6 - - 8.4 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0 - - 0 - 44 Lanes and Geometrics 8: Alley & Cherry short total am 11/9/2015 Baseline Synchro 9 Light Report Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.910 Flt Protected 0.999 0.984 Satd. Flow (prot) 1863 0 0 1861 1668 0 Flt Permitted 0.999 0.984 Satd. Flow (perm) 1863 0 0 1861 1668 0 Link Speed (mph) 30 30 30 Link Distance (ft) 653 517 802 Travel Time (s) 14.8 11.8 18.2 Intersection Summary Area Type: Other 45 HCM 2010 TWSC 8: Alley & Cherry short total pm 11/9/2015 Baseline Synchro 9 Light Report Page 6 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 318 2 1 580 1 4 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 346 2 1 630 1 4 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 348 0 980 347 Stage 1 - - - - 347 - Stage 2 - - - - 633 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1211 - 277 696 Stage 1 - - - - 716 - Stage 2 - - - - 529 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1211 - 277 696 Mov Cap-2 Maneuver - - - - 277 - Stage 1 - - - - 716 - Stage 2 - - - - 528 - Approach EB WB NB HCM Control Delay, s 0 0 11.8 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 534 - - 1211 - HCM Lane V/C Ratio 0.01 - - 0.001 - HCM Control Delay (s) 11.8 - - 8 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0 - - 0 - 46 Lanes and Geometrics 8: Alley & Cherry short total pm 11/9/2015 Baseline Synchro 9 Light Report Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.999 0.892 Flt Protected 0.990 Satd. Flow (prot) 1861 0 0 1863 1645 0 Flt Permitted 0.990 Satd. Flow (perm) 1861 0 0 1863 1645 0 Link Speed (mph) 30 30 30 Link Distance (ft) 653 517 802 Travel Time (s) 14.8 11.8 18.2 Intersection Summary Area Type: Other 47 APPENDIX F 48 SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Cherry Street Maple Street College Avenue Meldrum Street Mason Street Howes Street 320 Maple Street 49 Pedestrian LOS Worksheet Project Location Classification: Pedestrian District Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Neighborhood to the west Residential Minimum A A B A A 1 Actual A A B A A Proposed A A B A A Neighborhood to the north Residential Minimum A A B A A 2 Actual A A B A A Proposed A A B A A Commercial area to the east Commercial Minimum A A B A A 3 Actual A A B A A Proposed A A B A A Commercial area to the south Commercial Minimum A A B A A 4 Actual A A B A A Proposed A A B A A Minimum 5 Actual Proposed Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed 50 SCALE: 1"=500' BICYCLE INFLUENCE AREA DELICH ASSOCIATES 320 Maple Street TIS, November 2015 Cherry Street Maple Street College Avenue Meldrum Street Mason Street Howes Street 320 Maple Street 51 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C B B Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification 1 Fort Collins CBD Commercial B B B 2 3 4 52