Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS, UTILITY ADMINISTRATION BUILDING - FDP - FDP150018 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSJE FF E R S ON S T. W I LLOW S T. L IND E N S T. N. COLLEGE AVE. E. LINCOLN BUCKINGHAM E. VINE DR. O L D TO WN BAS IN C A CH E L A P OUDR E BAS IN C A CH E L A P O UDR E BAS IN DR Y CR EEK BAS I N A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Final Drainage Report for City of Fort Collins Utilities Administration Building dated April 29, 2015 by Northern Engineering Services, Inc., shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction JE FF E R S ON S T. WILLOW S T. LIND E N S T. N. COLLEGE AVE. E. LINCOLN BUCKINGHAM E. VINE DR. OLD TOWN BAS IN C A CH E L A P OUDR E BAS IN C A CH E L A P O UDR E BAS IN DR Y CR EEK BAS I N MOUNTAIN AVE. E. MULBERRY ST S. COLLEGE AVE. LAPORTE AVE. MAPLE AVE. S. MASON AVE. S. HOWES AVE. OHE O H E OHE O HE OHE O HE O H E O H E O HE O H E O H E O HE O HE S T ST S T S T G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E F O FO F O F O F O F O F O F O FO F O F O FO FO FO FO F O SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS FO FO FO FO FO FO FO FO FO FO FO FO FO T PROPOSED 11' WIDE SIDEWALK PROPOSED 10' WIDE SIDEWALK 5 5 1 23' TYP. 8' TYP. 4 HOWES STREET (100' ROW) EXISTING 215 N. MASON BUILDING PROPOSED UTILITIES ADMINISTRATION BUILDING EXISTING 214 N. HOWES BUILDING RELOCATED BUTTERFLY BLDG PROPOSED SEAT WALL (RE: LANDSCAPE ARCHITECT) PROPOSED 8' WIDE SIDEWALK PROPOSED 10' WIDE SIDEWALK HANDICAP RAMP (TYP.) EXISTING STORM SEWER MANHOLE (TYP.) P R T O HE O HE O HE S T ST S T S T G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E UD UD UD UD UD UD UD UD S T ST S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S S T T RELOCATED BUTTERFLY BLDG FF = 4984.0 BUILDING COLUMN (RE: ARCHITECT - TYP.) EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR EXISTINGFLOODWAY RIGHT-OF-WAY CITY RELOCATED BUTTERFLY BLDG FF = 4984.0 PROPOSED SIDEWALK PROPOSED SIDEWALK PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) UD UD UD UD UD UD UD UD UD RD RD RD RD FUTURE PEDESTRIAN WALKWAY UD UD UD UD UD UD UD PROPOSED DRAINAGE ALIGNMENT Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Grad\940-002_GRAD2.dwg Wegert Provencio C401 GRADING PLAN DETAILS CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D PROPOSED 11' WIDE SIDEWALK P RO P O SE D 10 ' W I D E S I D EWA L K 12' WIDE EX. LEFT TURN LANE 11' WIDE EX. SB THROUGH LANE 13' WIDE EX. NB THROUGH LANE 11' WIDE EX. PARALLEL PARKING LANE 12' WIDE EX. PARALLEL PARKING LANE 14' WIDE EX. WB THROUGH LANE 7' WIDE EX. BIKE LANE 12' WIDE EX. EB THROUGH LANE 6' WIDE EX. BIKE LANE EXISTING SOLID DOUBLE YELLOW STRIPE EXISTING DASHED WHITE STRIPE EXISTING SOLID WHITE STRIPE EXISTING SOLID WHITE STRIPES EXISTING SOLID DOUBLE YELLOW STRIPE EXISTING SOLID WHITE STRIPE PROPOSED CURB & GUTTER EXISTING CURB & GUTTER EXISTING HANDICAP RAMPS EXISTING HANDICAP RAMPS EXISTING HANDICAP RAMPS 10' WIDE EX. LEFT TURN LANE 12' WIDE EX. NB THROUGH LANE 12' WIDE EX. LEFT TURN LANE 12' WIDE EX. PARALLEL ST ST S T ST S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T 10 + 00 10 + 50 11 + 00 11 + 50 12 + 00 12 + 50 4975 4980 4985 4990 4975 4980 4985 4990 12+50 12+00 11+00 10+00 9+75 5 .97 % 9 .31 % 0 .51 % 1 .14 % 0.52% 1 .24 % - 0 .58 % - 0 . 13 % - 1 .47 % PVI S T A = 10+00 . 00 PVI E L EV = 4980 . 09 PVI S T A = 10+27 . 81 PVI E T S T ST S T S T F O FO F O F O F O F O F O F O FO F O F O FO FO FO FO F O S T S T S T S T S T S T S T S T S T S T S T S T S T S T S Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Details\940-002-Details.dwg Wegert Provencio C700 CONSTRUCTION DETAILS CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E 001 HANDICAP PARKING REQUIREMENTS ATTACHED SIDEWALK DETAIL S lope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1 /4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4" 1/4 SLAB THICKNESS 1/4" DETACHED S IDEWALK DETAIL Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Details\940-002-Details.dwg Wegert Provencio C701 CONSTRUCTION DETAILS CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E 101 TYPICAL POINT OF CONNECTION CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R N OT FO R C O N S T MINIMUM 12" THICK LAYER OF BIORETENTION SAND MEDIA (SEE BIORETENTION SAND MEDIA SPECIFICATION FROM CITY OF FORT COLLINS) MINIMUM 6" THICK LAYER OF PEA GRAVEL DIAPHRAGM MINIMUM 4" PERFORATED PVC PIPE 2" 2" MINIMUM 2" OF CDOT NO. 4 AGGREGRATE ABOVE AND BELOW PIPE 10:1 SLOPE (TYP. - SEE GRADING PLAN) MINIMUM 8" THICK LAYER OF CDOT NO. 4 AGGREGRATE WATER SURFACE ELEVATION OF WQC POND SEE GRADING PLAN 24" DIA. NYLOPLAST DRAIN INLET DOME GRATE MINIMUM 12" SOLID PVC PIPE MINIMUM 12" THICK LAYER OF BIORETENTION SAND MEDIA (SEE BIORETENTION SAND MEDIA SPECIFICATION FROM CITY OF FORT COLLINS) MINIMUM 6" THICK LAYER OF PEA GRAVEL DIAPHRAGM MINIMUM 8" THICK LAYER OF CDOT NO. 4 AGGREGRATE MINIMUM 4" PERFORATED PVC PIPE 2" 2" MINIMUM 2" OF CDOT NO. 4 AGGREGRATE ABOVE AND BELOW PIPE 2' MIN. (WIDTH VARIES - SEE GRADING PLAN) MAX. 4:1 SLOPE MAX. 4:1 SLOPE FLOWLINE OF POND (SEE GRADING PLAN ) 1% 1% DEPTH VARIES (SEE GRADING PLAN) Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Details\940-002-Details.dwg Wegert Provencio C702 CONSTRUCTION DETAILS CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 LOWER LIMIT OF TRENCH WALL SLOPING INITIAL LIFT * 12 IN. MIN. PIPE O.D. 4 IN. MIN. TRENCH WIDTH AS SPECIFIED IN SECTION 02221 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 * BEDDING REQUIRMENTS WW-1 PLAN VIEW CROSS VIEW 45 ELBOW SERVICE WYE 8 IN. PVC SEWER PIPE COMPACTED GRANULAR MATERIAL AIR-TIGHT PLUG WITH 4 IN. X 4 IN. MARKER UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR LEAN CONCRETE PVC SEWER PIPE NOTE: WYE CONNECTION NOT ALLOWED ON VCP LEAN CONCRETE o 20 MIN. o 45 MAX. o TRENCH UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR 4 IN. X 4 IN. MARKER AIR-TIGHT PLUG SERVICE WYE DETAIL WW-9 FLOW DIRECTION TRAFFIC RATED CLEANOUT WW-15 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R N OT FO R C O N S T RUC TIO N CITY OF FORT COLLINS 204 WATER QUALITY OUTLET STRUCTURE DIMENSIONS FOR SLOTTED PVC PIPE SCREEN SLOT TABLE GUIDELINES ABCDE PIPE SIZE ROWS OF SLOTS SLOT LENGTH MAXIMUM SLOT WIDTH APPROX. SLOT/ROW PER FOOT APPROX. SLOT SPACING OPEN AREA PER FOOT 4" 3 (MIN.) - 6 (MAX.) 1.06"-2.35" 0.032" 14 1/2"-3/4" 1.90-3.15 SQ. IN. 201 F 206 TYPICAL CROSS-SECTION OF POND HEAVY DUTY/LIGHT DUTY CONCRETE PAVEMENT 202 PAVEMENT DETAIL (PRIVATE DEVELOPMENT AREAS) Walk Walk Pa rkway Pa rkway Concrete Bo rder R.O.W. 10'X10' S IGHT AREA AREA SIGHT 10'X10' Alle y Drive-Ove r o r Ve rtica l Curb & Gutter FL Curb 0" Curb Construction Joint Truncated Dom e 0" Curb Slope 1/4"/Ft. 6" Curb 6" Curb 1:12 STREET 6" Curb AREA SIGHT 10'X10' Pa rkway Truncated Dom e Warning Detection Walk R.O.W. STREET Slope 1 /4"/Ft. 0" Curb 0" Curb Pa rkwa y 6" Curb SIGHT AREA 10'X10' Walk Alle y MAX. 12:1 MAX. 12:1 FL ALLEY W/ S IDE DRAINAGE ALLEY W/ CENTER DRAINAGE Warning Detection (TYP.) (TYP.) FL Alle y Concre te FL concrete 8 " minimum thick concrete 8 " minimum thick 1:12 Truncated Dome Warning Detection 1:24 1:24 6" Curb Ve rtica l RUC TIO N Va ria b le S lope sidewalk to curb 1/4 " per foot. 2' m in. Sidewalk Drivewa y DRIVEWAY SIDEWALK SECTION A-A NOTE: 1 . Sidewalk grade shall remain consistent across driveway 3 . This de ta il applies to Residential & Commercial driveways . Detached Sidewalk Attached Sidewalk DETACHEDATTACHED All Sidewalk Thickness Shall Be 6" m in im um. SIDEWALK FL 6" 2"R. 2" 6" 6" 12" 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0 .5" 4.5" 18" 3.63" 21.75" R 0 .13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge m ay be tapered or battered. (Typical for all Curb & & Gutter Types) MIN. MIN. CAR ACCESSIBLEVAN ACCESSIBLE OR 8' 5' 8' 8' 8' 8' 11' 5' 11' 11' 5' ONE IN EVERY EIGHT ACCESSIBLE SPACES, BUT NOT LESS THAN ONE, SHALL BE VAN ACCESSIBLE. ONE SIGN PER SPACE REQUIRED R7-8 ONE SIGN PER SPACE REQUIRED R7-8 A "UNIVERSAL" PARKING SPACE DESIGN MAY BE USED. THIS DESIGN IS USED TO ACCOMMODATE CAR & VAN ACCESSIBLE PARKING SPACES, WHICH ELIMINATES THE NEED FOR TWO SIGN TYPES. "UNIVERSAL DESIGN" CAR & VAN ACCESSIBLE ONE SIGN PER SPACE REQUIRED R7-8 NO PARKING TYPICAL PAVEMENT MARKINGS 1. Attach the sign panels tightly to the post and use oversized washers to keep the sign from breaking loose from the post when hit by a vehicle. 2. Sign panels should be m ounted a m inim um of 7 feet above the pavem ent or ground. Cross section of post 2 1/4" Anchor 3. Signs larger than 36 inches in length or width require wind bracing and special post design. NOTES: 4. Anchor Stub and post are square steel tube (perforated). CRITERIA FOR SINGLE POST $OO1R3DUNLQJ VLJQVVKDOOEHLQVWDOOHGDWIURP )ORZ /LQH ** (22F12A31) 7'-0" MIN. CLEARANCE 2' - 3' FROM F S treet Curb See Figure 16-1 L * 12 Gauge 30" 8" 8" STANDARD GRAY CONCRETE RAMP WITH PARTIALLY COLORED CONCRETE PLAN VIEW SECTION A-A A A N.T.S. 6" N.T.S. 2' NOTES: t=6" or as specified MILL PAVEMENT MIN 2" SAW CUT LINE. CUT TO CLEAN EDGE. EX DEPTH PLUS 2" UP TO 8" THEN EX DEPTH. 0$ ; EXISTING PAVEMENT NEW PAVEMENT SAWCUT DETAIL TRUNCATED DOMES FOR HANDICAP RAMPS BOLLARD DETAIL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R N OT FO R C O N S T RUC TIO N 004 002 005 PROTECTED SWITCH BOX CONCRETE FILLED BOLLARD 0$ ; PROPOSED GRADE NEW PAVEMENT 003 THICKEN CONCRETE EDGE 1' MAX T S T S T S T S T S T SS SS SS SS SS SS SS SS SS SS S T S T S T SS SS SS S SS SS S SS SS SS SS S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T FO FO FO FO FO FO FO FO FO FO FO FO FO W RD RD RD RD RD S F S F S F S F S F S F S F S F SF SF SF SF SF SF SF SF SF SF SF SF LAPORTE AVENUE (100' ROW) HOWES STREET ( 100 ' R OW ) EXISTING 215 N. MASON BUILDING EXISTING 214 N. HOWES BUILDING P R O P O SED S I DEWA LK P RO P O SE D S I D EWA L K APPROXIMATE LOCATION OF 16' WIDE x5' TALL CONCRETE BOX CULVERT PR O P O SED C O NCRE T E T ERRACE (RE: LANDSCAPE ARCHI T EC T ) PROPOSED SIDEWALK P R OPOSED SIDE W A LK P R O P O SED SIDEWA LK PROPOSED POROUS LANDSCAPE DETENTION 1 2 OS1 1 2 OS2 OS1 OS2 OS3 OS3 EXISTING RIGHT-OF-WAY FUTURE PEDESTRIAN WALKWAY PROPOSED STORM SEWER B CONNECT PROPOSED STORM SEWER INTO EXISTING BOX CULVERT PROPOSED WATER QUALITY OUTLET STRUCTURE PROPOSED STORM SEWER A PROPOSED STORM SEWER D PROPOSED SIDEWALK PROPOSED UTILITIES ADMINISTRATION BUILDING FF = 4985.50 RELOCATED BUTTERFLY BLDG FF = 4984.0 4984 . 1 100 -Y R F L OO D E L EVATIO N (FT. C O LL I N S N GV D 29 ) EXISTING RIGHT-OF-WAY PROPOSED EMERGENCY ACCESS ALIGNMENT PROPOSED STORM SEWER C OS4 OS4 RS RS RS RS RS RS RS RS RS RW RW RW RS RS RS RS VTC IP IP SF SF SF RW CONTRACTOR TO PLACE VEHICLE TRACKING PAD AT CONSTRUCTION ENTRY (ASSUMED ON THIS PLAN TO BE AT SITE NE CORNER) PROPOSED STORM SEWER E EXISTING RIGHT-OF-WAY EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY EXISTING STORM SEWER MANHOLE (TYP.) PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Drng\940-002_DRNG.dwg Wegert Provencio C600 DRAINAGE & EROSION CONTROL PLAN CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E NOTES: A B2 1.45 ac N OT FO R C O N S T RUC TIO N LEGEND: ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET UD ST CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R PROJECT DATUM: NGVD29 Unadjusted (Old City of Fort Collins Datum) BENCHMARK #1: City of Fort Collins Benchmark 1-13 Southwest corner of College Avenue and Maple Street, on a concrete traffic signal base. Elevation= 4976.58 NOTE: If NAVD 88 Datum is required for any purpose, the following equation should be used: NAVD88 = NGVD29 Unadjusted + 3.17' PROJECT BENCHMARKS: SF NOTE: ALL BMP'S SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR. TEMPORARY BMP'S L EV = 4981 . 76 PVI S T A = 10+37 . 81 PVI E L EV = 4982 . 69 PVI S T A = 10+51 . 47 PVI E L EV = 4982 . 76 PVI S T A = 10+63 . 41 PVI E L EV = 4982 . 89 PVI S T A = 10+88 . 87 PVI E L EV = 4983 . 02 PVI S T A = 11+66 . 68 PVI E L EV = 4983 . 30 PVI S T A = 11+88 . 34 PVI E L EV = 4983 . 27 PVI S T A = 12+21 . 14 PVI E L EV = 4982 . 79 54.6' VC HP ELEV = 4983.41 HP STA = 11+38.91 PVI STA = 11+29.11 PVI ELEV = 4983.52 BV C S: 11+01 . 83 BV C E: 4983 . 18 EV C S: 11+56 . 39 EV C E: 4983 . 36 A.D. = 1.82 K = 30.00 TRANSITION FROM VERTICAL TO OUTFALL CURB AND GUTTER 4980 . 09 4981 . 59 4982 . 75 4982 . 95 4983 . 16 4983 . 38 4983 . 39 4983 . 29 4983 . 10 VERTICAL CATCH CURB AND GUTTER OUTFALL CURB AND GUTTER PROPOSED GROUND EXISTING GROUND 4975 4980 4985 4990 4975 4980 4985 4990 12+50 12+00 11+00 10+00 9+75 0 .79 % -0 .60 % PV I S T A = 10+88 . 04 PV I E L EV = 4982 . 31 PV I S T A = 11+41 . 80 PV I E L EV = 4982 . 73 PV I S T A = 12+06 . 33 PV I E L EV = 4982 . 35 4982 . 40 4982 . 60 4982 . 68 4982 . 53 4982 . 38 PROPOSED GROUND EXISTING GROUND REPLACE EXISTING CURB AND GUTTER (- 0 .59 %) (- 0 .77 %) (- 1 .92 %) (- 7 .60 %) MATCH INTO FLOWLINE OF EXISTING CURB & GUTTER MATCH INTO FLOWLINE OF EXISTING CURB & GUTTER T PROPOSED UTILITIES ADMINISTRATION BUILDING RELOCATED BUTTERFLY BLDG EXISTING STORM INLETS (TYP.) PROPOSEDSIDEWALK SIDEWALK EXISTING EXISTING 215 N. MASON BUILDING EXISTING SIDEWALK PROPOSED OUTFALL CURB AND GUTTER (SEE EAST ALLEY LEFT FLOWLINE PROFILE ON THIS SHEET) APPROXIMATE LOCATION OF 16' WIDE x5' TALL CONCRETE BOX CULVERT EXISTING RIGHT-OF-WAY PROPOSED EMERGENCY ACCESS ALIGNMENT PROPOSED OUTFALL CURB AND GUTTER (SEE EAST ALLEY LEFT FLOWLINE PROFILE ON THIS SHEET) PRESERVE AND PROTECT EXISTING CURB & GUTTER 10.0' EXISTING 20.0' WIDE PUBLIC ALLEY MATCH INTO FLOWLINE OF EXISTING CURB & GUTTER (SEE EAST ALLEY RIGHT FLOWLINE PROFILE ON THIS SHEET) MATCH INTO EXISTING SIDEWALK MATCH INTO FLOWLINE OF EXISTING CURB & GUTTER (SEE EAST ALLEY RIGHT FLOWLINE PROFILE ON THIS SHEET) REPLACE EXISTING CURB & GUTTER (SEE EAST ALLEY RIGHT FLOWLINE PROFILE ON THIS SHEET) END ALLEY CROSS-SECTION TRANSITION BEGIN ALLEY CROSS-SECTION TRANSITION 20' PROPOSED CURB AND GUTTER (SEE EAST ALLEY LEFT FLOWLINE PROFILE ON THIS SHEET) TRANSITION BETWEEN VERTICAL CURB & GUTTER AND OUTFALL CURB & GUTTER 10' P R O P O SED DRIVEWAY Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Strt\940-002_STRT_East Alley.dwg Wegert Provencio C502 EAST ALLEY FL PROFILES CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E N OT FO R C O N S T RUC TIO N ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 LEFT FLOWLINE EAST ALLEY SCALE : 1" = 20' HORIZ. 1" = 2' VERT. RIGHT FLOWLINE EAST ALLEY SCALE : 1" = 20' HORIZ. 1" = 2' VERT. LEGEND: UD ST T 13 + 00 13 + 50 14 + 00 14 + 50 LAPORTE AVENUE (100' ROW) EXISTING STORM INLETS (TYP.) PROPOSED SIDEWALK EXISTING STORM SEWER MANHOLE (TYP.) PROPOSEDSIDEWALK SIDEWALK EXISTING EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY FL RADIUS = 20' FL RADIUS = 15' FL RADIUS = 20' FL RADIUS = 15' EXISTING GROUND PROPOSED GROUND PROPOSED GROUND EXISTING GROUND EXISTING STORM INLETS 4975 4980 4985 4975 4980 4985 15+25 15+00 14+00 13+00 12+00 11+00 10+00 9+75 4979 . 72 4980 . 02 4980 . 32 4980 . 62 4980 . 92 4981 . 22 4981 . 65 2 .00 % 1 .20 % 1.19 % PVI S T A = 11+70 . 32 PVI E L EV = 4979 . 66 PVI S T A = 12+16 . 63 PVI E L EV = 4980 . 22 PVI S T A = 13+08 . 63 PVI E L EV = 4981 . 32 PVI S T A = 13+32 . 94 PVI E L EV = 4981 . 81 0 .70 % 1 .53 % 0 .50 % 0 .80 % -1.12% PVI S T A = 13+93 . 63 PVI E L EV = 4982 . 12 PVI S T A = 14+06 . 41 PVI E L EV = 4982 . 21 PVI S T A = 14+14 . 25 PVI E L EV = 4982 . 33 PVI S T A = 14+22 . 09 PVI E L EV = 4982 . 37 PVI S T A = 14+29 . 92 PVI E L EV = 4982 . 43 PVI S T A = 14+31 . 89 PVI E L EV = 4982 . 41 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 10+50 4976 4978 4980 4982 4984 4976 4978 4980 4982 4984 -60 -40 -20 0204060 0 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+00 4976 4978 4980 4982 4984 4976 4978 4980 4982 4984 -60 -40 -20 0204060 0 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+50 4976 4978 4980 4982 4984 4976 4978 4980 4982 4984 -60 -40 -0020406020 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+00 4976 4978 4980 4982 4984 4976 4978 4980 4982 4984 -60 -40 -0020406020 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+50 4978 4980 4982 4984 4986 4978 4980 4982 4984 4986 -60 -40 -0020406020 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+00 4978 4980 4982 4984 4986 4978 4980 4982 4984 4986 -60 -40 -20 0204060 0 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+50 4978 4980 4982 4984 4986 4978 4980 4982 4984 4986 -60 -40 -20 0204060 0 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+00 4978 4980 4982 4984 4986 4978 4980 4982 4984 4986 -60 -40 -20 0204060 0 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+50 4978 4980 4982 4984 4986 4978 4980 4982 4984 4986 -60 -40 -0020406020 SECTION LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 10+00 4976 4978 4980 4982 4984 4976 4978 4980 4982 4984 -60 -40 -20 0204060 0 EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D F R I N GE 100 -Y R F L OO D WAY 100 -Y R F L OO D F R I N GE 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D WAY 100 -Y R F L OO D F R I N GE 100 -Y R F L OO D F R I N GE 100 -Y R F L OO D F R I N GE 100 -Y R F L OO D F R I N GE 100 -Y R F L OO D WAY EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW EX. R OW ( 4 .68 % ) (- 1 .93 % ) (- 2.00% ) (- 1 .92 % ) ( 3 .24 % ) ( 3.29% ) ( 1 .94 % ) ( 2 .41% ) (- 2 .49% ) (- 1 .07 % ) (- 2 .09 % ) ( - 1 .69% ) ( 2 .00% ) ( 6 .07% ) ( 1 .70% ) (- 3 .63 % ) (- 0 . 85 % ) (- 2 .12 % ) (- 1 .84 % ) ( 2 .58 % ) ( 2 .89% ) (- 3.51% ) (- 1 .66% ) (- 1 .55 % ) (- 2 .10 % ) ( 2 .66%) ( 2 . 88 % ) (- 2 .32% ) (- 1.74% ) (- 1 .33 % ) ( 9 .15 % ) ( 6 .43% ) ( 1 .25% ) (- 1 .47 % ) (- 1.93% ) (- 1 .15%) (- 1 .71 % ) ( 2.47 % ) ( 1 .36% ) ( 3 .54 % ) (- 0 . 69 % ) (- 0 . 86% ) ( 0 .91% ) (- 0 . 80 % ) (- 2.23% ) ( 3 .41% ) ( 0 . 79 % ) (- 0 . 36% ) (- 0 . 07 % ) ( 27 .06 % ) (- 2 .60% ) (-1.6 1 % ) (- 1 .46% ) (- 2.22% ) ( 5 .03 % ) ( 1.39% ) (0 . 79 % ) ( 7 .03 % ) ( 6 .25 % ) (- 2 .25 % ) (- 1.41% ) (- 1 .48% ) (-1.63 % ) (- 1 .46% ) ( 8 .21 % ) ( 8 .56% ) ( 1.32% ) (- 0 . 49 % ) (- 7 .09% ) ( 0 . 24% ) (2.72 %) (- 0 . 24 % ) ( 0 . 43 % ) (- 3 .72%) ( 0 . 29% ) ( 0 . 10 % ) (- 0 . 22 % ) ( 0 . 91%) 4 .32 % 2 .01 % 11 .50 % - 2 .59 % 2 .00 % 1.98 % 0 . 47 % 1 .50 % 2.00 % 2.00 % 2 .52 % 2.00 % 2.57 % - 3 .49 % 2.00 % 2.00 % 1 . 58 % Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Strt\940-002_XSCT.dwg Wegert Provencio C501 LAPORTE AVENUE CROSS-SECTIONS CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E LEGEND: FIELD SURVEY BY: N OT FO R C O N S T RUC TIO N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 PROPOSED FLOWLINE LAPORTE AVENUE SCALE : 1" = 20'' HORIZ. 1" = 2' VERT. 1REVISED FLOWLINE ON LAPORTE 1/27/15 PARKING LANE 11' WIDE EX. SB THROUGH LANE 13' WIDE EX. PARALLEL PARKING LANE 11' WIDE EX. EB THROUGH LANE 11' WIDE EX. WB THROUGH LANE 6' WIDE EX. BIKE LANE 11' WIDE EX. EB THROUGH LANE 7' WIDE EX. BIKE LANE 12' WIDE EX. LEFT TURN LANE 12' WIDE EX. EB THROUGH LANE EXISTING SOLID WHITE STRIPES EXISTING SOLID WHITE STRIPE EXISTING SOLID WHITE STRIPE EXISTING SOLID WHITE STRIPE EXISTING DASHED WHITE STRIPE EXISTING SOLID DOUBLE YELLOW STRIPE EXISTING SOLID WHITE STRIPE EXISTING SOLID DOUBLE YELLOW STRIPE EXISTING SOLID WHITE STRIPES HANDICAP RAMP (TYP.) EXISTING STORM SEWER MANHOLE (TYP.) FL R = 5.0' FL R = 25' PROPOSED CURB & GUTTER MATCH INTO EXISTING CURB & GUTTER MATCH INTO EXISTING CURB & GUTTER EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY LAPORTE AVENUE (100' ROW) HOWES STREET (100' ROW) EX I S T I NG S I D EWA L K EXISTING SIDEWALK EXISTING SIDEWALK EX IS T I N G SIDEWA LK PROPOSED UTILITIES ADMINISTRATION BUILDING LAPORTE AVENUE (100' ROW) HOWES STREET (100' ROW) PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) PROPOSED BIKE RACKS (RE: LANDSCAPE ARCHITECT) PROPOSED RUNNEL (RE: LANDSCAPE ARCHITECT) PROPOSED DRAINAGE ALIGNMENT PROPOSED DRAINAGE ALIGNMENT Thursday, April 23, 2015 10:17 AM D:\Projects\940-002\Dwg\Site\940-002_HCP.dwg Wegert Provencio C500 INTERSECTION OF HOWES & LAPORTE CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E NOTES: LEGEND: FIELD SURVEY BY: N OT FO R C O N S T RUC TIO N ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R ABBREVIATIONS: E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 NOTES: N OT FO R C O N S T RUC TIO N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R BEGIN OUTFALL CURB AND GUTTER / END CURB AND GUTTER TRANSITION BEGIN CURB AND GUTTER TRANSITION / END VERTICAL CURB AND GUTTER BEGIN CATCH VERTICAL CURB AND GUTTER PROPOSED 6" STEP BETWEEN CONCRETE WALK AND BUTTERFLY BUILDING PLAZA (SEE NOTE 9). APPROXIMATE LOCATION OF 16' WIDE x 5' HIGH CONCRETE BOX CULVERT MATCH INTO EXISTING STORM INLETS MATCH INTO EXISTING SIDEWALK MATCH INTO EXISTING TOP BACK OF CURB MATCH INTO LIP OF EXISTING CURB AND GUTTER PRESERVE AND PROTECT EXISTING CURB & GUTTER PROPOSED TOP OF POROUS LANDSCAPE DETENTION (EL. 4983) END ALLEY CROSS-SECTION TRANSITION BEGIN ALLEY CROSS-SECTION TRANSITION D INTERSECTION OF ALLEY & LAPORTE E MAIN ENTRANCE PLAZA AT LAPORTE PROPOSED RUNNEL (RE: LANDSCAPE ARCHITECT) R A M P PROPOSED CONCRETE STEPS WITH 6 (SIX) 6.5" RISERS AND 5 (FIVE) 14" TREADS (SEE NOTE 9). ENTRY PLAZA PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) PROPOSED UTILITIES ADMINISTRATION BUILDING FINISH FLOOR ELEV. = 4985.50 LEGEND: UD ST FIELD SURVEY BY: T PROPOSED PLANTER CURB (RE: LANDSCAPE ARCHITECT) PROPOSED PLANTER CURB (RE: LANDSCAPE ARCHITECT) PROPOSED CONCRETE STEPS WITH 6 (SIX) 6" RISERS AND 5 (FIVE) 12" TREADS (SEE NOTE 9). PROPOSED UTILITIES ADMINISTRATION BUILDING FINISH FLOOR ELEV. = 4985.50 C REAR ENTRANCE PLAZA ENTRY PLAZA S I DE WA LK SIDEWALK INSTALL THICKENED EDGE ALONG CONCRETE INSTALL 6" DIAMETER DRAIN HOLE IN WALL @ 1.0% SLOPE (RE: ARCHITECT) BLOCK BENCH - TYP. (RE: LANDSCAPE ARCHITECT) B STORM SEWER ON EAST SIDE OUTFALL CURB AND GUTTER EDGE OF RIGHT-OF-WAY DR I VE WAY PLAZA BLOCK BENCH - TYP. (RE: LANDSCAPE ARCHITECT) A MECHANICAL YARD/ REAR SIDEWALK INSTALL 6" DIAMETER DRAIN HOLE IN WALL @ 1.0% SLOPE (RE: ARCHITECT) MECHANICAL YARD (RE: ARCHITECT) RD INSTALL VERTICAL CURB & GUTTER T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T T RD RD RD RD RD PROPOSED TREE GRATE (RE: LANDSCAPE ARCHITECT - TYP.) BUILDING COLUMN (RE: ARCHITECT - TYP.) PROPOSED MECHANICAL YARD (RE: ARCHITECT) PROPOSED WALL (RE: ARCHITECT) EXISTING STORM INLETS (TYP.) MATCH FL INTO EXISTING STORM SEWER INLET GRATE = 4982.09 EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY LAPORTE AVENUE (100' ROW) HOWES STREET (100' ROW) EXISTING 215 N. MASON BUILDING EXISTING 20' WIDE ALLEY PROPOSED UTILITIES ADMINISTRATION BUILDING FF = 4985.50 EXISTING 214 N. HOWES BUILDING RELOCATED BUTTERFLY BLDG FF = 4984.0 PROPOSED SIDEWALK P RO P O SE D S I D EWA L K P RO P O SE D S I D EWA L K PROPOSED SIDEWALK P R O P O SED SIDEWA LK P R O P O SED SIDE W A LK PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) 4984 . 1 100 - Y R F L OO D E L EVATIO N ( FT . C O LL I N S N GV D 29 ) PROPOSED STORM SEWER & AREA DRAIN INLET. SEE DETAIL E ON SHEET C401. APPROXIMATE LOCATION OF 16' WIDE x 5' HIGH CONCRETE BOX CULVERT END ALLEY CROSS-SECTION TRANSISTION BEGIN ALLEY CROSS-SECTION SEETRANSISTION DETAIL E ON SHEET C401 SEE DETAIL D ON SHEET C401 FUTURE PEDESTRIAN WALKWAY SEE DETAIL C ON SHEET C401 PROPOSED STORM SEWER SEE DETAIL C ON SHEET C401. PROPOSED STORM SEWER SEE DETAIL C ON SHEET C401. PROPOSED STORM SEWER SEE DETAIL B ON SHEET C401. PRESERVE AND PROTECT EXISTING TREE (SEE NOTE 12). SEE DETAIL A ON SHEET C401 Monday, April 14, 2014 10:17 AM D:\Projects\940-002\Dwg\Grad\940-002_GRAD2.dwg Wegert Provencio C400 GRADING PLAN CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E LEGEND: ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 UD ST NOTES: N OT FO R C O N S T RUC TIO N FIELD SURVEY BY: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R T T T T T T T T T T T T T T T T T T T T T T T T T T T T T F O FO F O F O F O F O F O F O FO F O F O FO FO FO FO F O CTV C T V C T V C T V CTV C T V C T V C T V C T V C T V C T V C T V CTV C T V C T V CTV CTV W W W W W W W W W W W W W W W W W W W S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T C T V E E E E E E E E E E E E E E S T S T E E SS SS SS SS SS SS SS SS SS SS E E E E E E E E E T T T W W W W W W W W W W W W W W W W W W W W W W W W W E E E E E E E E E E E E E E E W E E E S T S T S T W W W W E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W W W W W W W W W W W T T T E E E E E E E E E SS SS SS SS SS SS SS SS SS SS T E E S T S T E E E E E E E E E E E E E E S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T FO FO FO FO FO FO FO FO FO FO FO FO FO G C T V C T V CTV C T V C T V G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W CO ELEC UGE SS SS SS 2 . 5 " W 2 . 5 " W 2 . 5 " W 2 . 5 " W 2 . 5 " W 2 . 5 " W 4 " F 4 " F 4 " F 4 " F 4 " F 4 " F 4 " F 4 " F U G E U G E U G E U G E UGE UGE U G E U G E U G E UGE UGE U G E UGE U G E U G E UG E U G E G G G G G G G G T W SS T T T T 4" F 4" F RD RD RD RD RD 2 . 5 " W EXISTING 215 N. MASON BUILDING EXISTING 20' WIDE ALLEY EX. 20' WIDE ALLEY EXISTING 214 N. HOWES BUILDING TIE INTO EXISTING 12" WATER MAIN WITH 12"x4" TAPPING SADDLE, 4"x2 1/2" REDUCER, THRUST BLOCK, 2 1/2" GATE VALVE N:131691.32 E:194033.40 INSTALL 2.5" WATER SERVICE (RE: PLUMBING PLANS) INSTALL 4" FIRE SERVICE AND CONNECT TO BUILDING FIRE SYSTEM (RE: PLUMBING PLANS) INSTALL 6" PVC SANITARY SEWER SERVICE AT INVERT ELEVATION 4979.50. SEE PLUMBING PLANS FOR CONTINUATION. INSTALL ELECTRIC TRANSFORMER PER UTILITY CITY OF FORT COLLINS ELECTRIC STANDARDS AND REGULATIONS (SEE NOTE 18) N:131869.51 E:194019.09 INSTALL ELECTRIC SERVICE (RE: ELECTRICAL PLANS) INSTALL GAS SERVICE PER UTILITY COMPANY'S STANDARDS AND REGULATIONS. (RE: MECHANICAL PLANS) CONNECT TO EXISTING SANITARY SEWER MAIN WITH 8"x6" WYE SADDLE WITH STAINLESS STEEL STRAPS. INVERT ELEV. = 4974.21 (6" PVC SERVICE) SLOPE = 7.13% INSTALL CLEAN-OUT N:131831.44 E:194046.56 N:131831.71 E:193984.70 EX 6 " SA N I T ARY SEWER EX 8 " SAN I T ARY SEWER EX 4 " WA T E RL I NE EX 12 " WA T E RL I N E EX 6 " SAN I T ARY SEWER EX 4 " WA T E RL I NE EX 8 " SAN I TARY SE W E R EX 8 " SA N I T ARY SEWE R INSTALL 2" WATER METER & VAULT N:131854.79 E:194019.58 INSTALL TELECOMMUNICATION SERVICE (RE: ELECTRICAL PLANS) TIE INTO EXISTING 12" WATER MAIN WITH 12"x4" TAPPING SADDLE, THRUST BLOCK, AND 4" GATE VALVE N:131691.31 E:194035.40 EXISTING SANITARY MH RIM=4983.50 INV N=4975.12 (6") INV W=4975.26 (6") INV S=4975.10 (6") APPROXIMATE LOCATION OF 16' WIDE x5' HIGH CONCRETE BOX CULVERT EXISTING STORM INLET RIM=4979.10 INV N=4974.64 (BOX CULVERT) INSTALL ELECTRIC SERVICE TO RELOCATED BUILDING (RE: ELECTRICAL PLANS) EXISTING TRAFFIC SIGNAL AND TRAFFIC VAULT EXISTING ELECTRIC VAULTS CONNECT TO EXISTING ELECTRIC MAIN PER FORT COLLINS ELECTRIC STANDARDS AND REGULATIONS PROPOSED SWITCH GEAR INSTALL BOLLARDS AT CORNERS OF ELECTRIC SWITCH (TYP.) CONNECT TO EXISTING GAS MAIN PER UTILITY COMPANY'S STANDARDS AND REGULATIONS PROVIDE NEW TELECOMMUNICATIONS PEDESTAL OUTSIDE OF SIDEWALK AND CONNECT TELECOMMUNICATION SERVICES PER UTILITY COMPANY'S STANDARDS AND REGULATIONS EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY INSTALL CURB STOP N:131854.78 E:194023.58 ,1 6 7$/ / %( 1 ' :,7+7+5 8 67%/ 2 &. N:131859.96 E:194035.93 ,167$//%( 1 ' :,7+7+5 8 6 7%/ 2 &. N:131854.73 E:194033.92 ,1 6 7$/ / %( 1 ' :,7+7+5 8 67%/ 2 &. N:131858.06 E:193996.26 LAPORTE AVENUE (100' ROW) HOWES STREET (100' ROW) S TEPS STEPS PR O P O SED C O NCRE T E T ERRACE ( R E : LANDSCAPE ARCHI T EC T ) EXISTING RIGHT-OF-WAY BUILDING COLUMN (RE: ARCHITECT) S TEP 5' MIN. 4' MIN. 10' MIN. 5' MIN. CONNECT EXISTING 3 4" WATER SERVICE TO BUTTERFLY BUILDING (RE: PLUMBING PLANS) CONNECT PROPOSED IRRIGATION SYSTEM TO EXISTING 3 4" WATER SERVICE (RE: IRRIGATION SYSTEM PLANS) EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY PROPOSED UTILITIES ADMINISTRATION BUILDING RELOCATED BUTTERFLY BLDG EX 3 4 " WA T E R SE R V I C E INSTALL 4" PVC SANITARY SEWER SERVICE TO BUTTERFLY BUILDING AT INVERT ELEVATION 4978.0. SEE PLUMBING PLANS FOR CONTINUATION. CONNECT TO EXISTING SANITARY SEWER MAIN WITH 8"x4" WYE SADDLE WITH STAINLESS STEEL STRAPS. INVERT ELEV. = 4974.41 (4" PVC SERVICE) SLOPE = 9.86% N:131792.89 E:194046.12 INSTALL GAS SERVICE TO BUTTERFLY BUILDING PER UTILITY COMPANY'S STANDARDS AND REGULATIONS (RE: MECHANICAL DRAWINGS) RELOCATED EXISTING TELECOMMUNICATIONS PEDESTAL PROPOSED MECHANICAL YARD (RE: ARCHITECT) PROPOSED 6" HDPE STORM SEWER DRAINS TOWARD SWALE (SEE DETAIL B ON SHEET C401) PROPOSED 6" HDPE STORM SEWER (SEE DETAIL C ON SHEET C401) FUTURE PEDESTRIAN WALKWAY CONNECT PROPOSED STORM SEWER INTO EXISTING BOX CULVERT PROPOSED WATER QUALITY OUTLET STRUCTURE PROPOSED 12" HDPE STORM SEWER (SEE SHEET C400) PROPOSED WALL (RE: ARCHITECT) PROPOSED DRAINAGE ALIGNMENT PROPOSED DRAINAGE ALIGNMENT PROPOSED EMERGENCY ACCESS ALIGNMENT INSTALL 2 1/2" x 2" REDUCER N:131854.77 E:194025.46 INSTALL 2 1/2" x 2" REDUCER N:131854.81 E:194015.79 PROPOSED TOP OF POROUS LANDSCAPE DETENTION (EL. 4983) PROPOSED TOP OF POROUS LANDSCAPE DETENTION (EL. 4983) STEPS ,1 6 7$/ / %( 1 ' :,7+7+5 8 67%/ 2 &. N:131854.83 E:194012.17 EX 3 4 " W A T E R SE RV ICE 6' MIN. P R O P O SED PLA Z A ( RE : LANDSCAPE A RCH I T E CT ) PROPOSED PLAZA (RE: LANDSCAPE ARCHITECT) PROPOSED 6" HDPE STORM SEWER (SEE DETAIL B ON SHEET C401) PROPOSED 4" PVC STORM SEWER (SEE DETAIL E ON SHEET C401) PROPOSED 11' WIDE SIDEWALK P RO P O SE D 10 ' W I D E S I D EWA L K P RO P O SE D 8 ' W I D E S I D EWA L K P RO P O SE D 10 ' W I D E S I D EWA L K P RO P O SE D 12' WIDE DRI VEWAY PROPOSED 11' WIDE SIDEWALK PR O P O SED 5' WIDE SIDEWALK P RO P O SE D 5' W ID E S ID EWA L K PROPOSED DRAINAGE ALIGNMENT PROPOSED DRAINAGE ALIGNMENT Thursday, April 23, 2015 10:17 AM D:\Projects\940-002\Dwg\Util\940-002_UTIL.dwg Wegert Provencio C300 UTILITY PLAN CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E NOTES: UGE UGE G SS 2.5" W 4" F T DRY UTILITY NOTES: CO UD LEGEND: CTV FIELD SURVEY BY: SS W X VAULT ELEC H Y D CONTROL IRR FO G T ST E ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 N OT FO R C O N S T RUC TIO N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R W O P O SE D 12 ' WI DE DR I VEWAY EXISTING SIDEWALK 1 :  1 (  6 (  6 :  PROPOSED PLANTING AREA (RE: LANDSCAPE ARCHITECT - TYP.) FL R = 20' FL R = 20' FL R = 5.0' FL R = 10' FL R = 15' FL R = 25' FL R = 25' PROPOSED CURB AND GUTTER PROPOSED CURB & GUTTER PROPOSED CURB & GUTTER MATCH INTO EXISTING MATCH INTO EXISTING CURB & GUTTER CURB & GUTTER MATCH INTO EXISTING CURB & GUTTER APPROXIMATE LOCATION OF 16' WIDE x5' TALL CONCRETE BOX CULVERT P R O P O SED C O NCRE T E T ERRACE ( R E : LANDSCAPE ARCHI T EC T ) MATCH INTO EXISTING CURB & GUTTER PROPOSED 11' WIDE SIDEWALK EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY BUILDING COLUMN - TYP. (RE: ARCHITECT) PROPOSED EMERGENCY ACCESS ALIGNMENT FL R = 15' FL R = 15' P R O P O SED 5 ' WIDE SIDEWALK P R O P O SE D 5 ' W ID E S ID EWA L K PROPOSED PLANTER CURB (RE: LANDSCAPE ARCHITECT) PROPOSED PLANTER CURB (RE: LANDSCAPE ARCHITECT) PROPOSED RETAINING WALL (RE: LANDSCAPE ARCHITECT) PROPOSED RETAINING WALL (RE: LANDSCAPE ARCHITECT) PROPOSED RETAINING WALL (RE: LANDSCAPE ARCHITECT) PROPOSED CURB AND GUTTER PRESERVE AND PROTECT EXISTING CURB & GUTTER SAWCUT MINIMUM 1' FROM FLOWLINE OF EXISTING CURB TO PROVIDE CLEAN STRAIGHT EDGE. SAWCUT TO PROVIDE CLEAN STRAIGHT EDGE. SAWCUT TO PROVIDE CLEAN STRAIGHT EDGE. PROPOSED MECHANICAL YARD (RE: ARCHITECT) FUTURE PEDESTRIAN WALKWAY 12.30' 10.0' 8.0' 9.5' 10.25' 16.7' 6' 8.5' 33' 22.7' 9.5' 6' 33' 73' 183' 4.0' 26.5' EXISTING 20.0' WIDE PUBLIC ALLEY EXISTING 20.0' WIDE PUBLIC ALLEY 9.8' MATCH INTO FLOWLINE OF EXISTING STORM SEWER INLETS EXISTING STORM INLETS (TYP.) MATCH INTO EXISTING TOP BACK OF CURB PROPOSED RAIN GARDEN (RE: LANDSCAPE ARCHITECT) PROPOSED WALL (RE: ARCHITECT) MATCH INTO FLOWLINE OF EXISTING CURB & GUTTER MATCH INTO EXISTING SIDEWALK MATCH INTO FLOWLINE OF EXISTING CURB & GUTTER REPLACE EXISTING CURB & GUTTER (SEE SHEET C400) PROPOSED GATE (RE: ARCHITECT) PROPOSED FLUSH RIBBON CURB (RE: LANDSCAPE ARCHITECT) PROPOSED DRAINAGE ALIGNMENT PROPOSED DRAINAGE ALIGNMENT LAPORTE AVENUE (100' ROW) END ALLEY CROSS-SECTION TRANSITION BEGIN ALLEY CROSS-SECTION TRANSITION 20' 5 FL R = 15' FL R = 15' FL R = 15' FL R = 15' FL R = 15' PROPOSED TOP OF POROUS LANDSCAPE DETENTION (TYP.) PROPOSED BOTTOM OF POROUS LANDSCAPE DETENTION (TYP.) BLOCK BENCH - TYP. (RE: LANDSCAPE ARCHITECT) PROPOSED BIKE RACKS (RE: LANDSCAPE ARCHITECT) PROPOSED BIKE RACKS (RE: LANDSCAPE ARCHITECT) PROPOSED RUNNEL (RE: LANDSCAPE ARCHITECT) PROPOSED TRUNCATED DOMES AT ALLEY ENTRANCE 3.5' PROPOSED CONCRETE PLAZA (RE: LANDSCAPE ARCHITECT) PROPOSED CONCRETE PLAZA (RE: LANDSCAPE ARCHITECT) PROPOSED RETAINING WALL (RE: LANDSCAPE ARCHITECT) 8.0' 2' 1.8' 13.0' 25' FL TO FL 29' FL TO FL 25' FL TO FL PROPOSED BOTTOM OF POROUS LANDSCAPE DETENTION (TYP.) THICKENED CONCRETE EDGE (SEE DETAIL C ON SHEET C401) 1.8' PROPOSED DRAINAGE ALIGNMENT PROPOSED DRAINAGE ALIGNMENT PROPOSED DRAINAGE ALIGNMENT PRESERVE & PROTECT EXISTING TREE PROPOSED CURB AND GUTTER PROPOSED CONCRETE STEPS (SEE NOTE 5). PROPOSED CONCRETE STEPS (SEE NOTE 5). PROPOSED CONCRETE STEP (SEE NOTE 5). 8.0' REPLACE EXISTING CURB & GUTTER (SEE SHEET C400) Thursday, April 23, 2015 10:17 AM D:\Projects\940-002\Dwg\Site\940-002_HCP.dwg Wegert Provencio C200 HORIZONTAL CONTROL PLAN CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E NOTES: STRIPING AND SIGNAGE LEGEND: 1 4 5 LEGEND: FIELD SURVEY BY: N OT FO R C O N S T RUC TIO N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 T E E E E E E E E E E E E E E E E E E E E E E E E E E E E E T T T T T T T T T T T T T T T T T T T T T T T T T T T T F O FO FO FO FO FO FO FO FO FO FO FO FO FO FO F O C T V C T V C T V C T V C T V C T V C T V C T V C T V C T V C T V C T V CTV C T V C T V CTV C T V W W W W W W W W W W W W W W W 1 (  1 :  S T W W W W W S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T C T V E E E E E E E E E E E E E E S T S T E E SS S S SS SS SS SS SS SS SS SS E E E E E E E E E T T T W W W W W W W W W W W W W W W W W W W W W W W W W E E E E E E E E E E E E E E E W E E E S T S T S T W W W W W W W E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W W W W W W W W W W W T T T E E E E E E E E E SS SS SS SS SS SS SS SS SS SS T E E S T S T E E E E E E E E E E E E E E S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T S T FO FO FO FO FO FO FO FO FO FO FO FO FO G C T V C T V C T V C T V C T V G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING SANITARY MH RIM=4983.50 INV N=4975.12 (6") INV W=4975.26 (6") INV S=4975.10 (6") PRESERVE & PROTECT BRICK WALL 1 :  1 (  1 (  6 (  6 :  PRESERVE & PROTECT STORM INLET RIM=4982.09 INV W=4980.01 APPROXIMATE LOCATION OF 16' WIDE x5' TALL CONCRETE BOX CULVERT (100' ROW) (140' ROW) L AP O R T E AVE NU E H O W ES S T R EE T 20-FT WIDE ALLEY 20-FT WIDE ALLEY 215 N. MASON STREET BUILDING 222 LAPORTE AVE. 214 N. HOWES STREET 1-STORY BLOCK AND STUCCO 3-STORY BRICK ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT PRESERVE & PROTECT EXISTING TREE RELOCATE 1 STORY BRICK BUILDING (SEE HORIZONTAL CONTROL PLAN) PRESERVE EXISTING 3 4" WATER SERVICE (SEE UTILITY PLANS) REMOVE EXISTING CURB STOP AND PLUG WATER SERVICE AT THE MAIN PER CITY OF FORT COLLINS STANDARDS AND REGULATIONS REMOVE OVERHEAD ELECTRIC LINE REMOVE POWER POLE & OVERHEAD ELECTRIC LINE DEMOLISH EXISTING GUTTER, FLOWLINE , & CONCRETE DRIVEWAY PRESERVE & PROTECT EXISTING TELECOMMUNICATIONS, ELECTRIC, AND TV LINES REMOVE ELECTRIC SERVICE PER UTILITY COMPANY'S STANDARDS & REGULATIONS PRESERVE & PROTECT TRAFFIC SIGNAL & TRAFFIC CONTROL VAULTS RELOCATE IN SAME LOCATION TELECOMMUNICATIONS PEDESTAL MOUNTED ON POLE PER UTILITY COMPANY'S STANDARDS AND REGULATIONS PRESERVE & PROTECT ELECTRIC VAULTS DEMOLISH HANDICAP RAMP DEMOLISH HANDICAP RAMP DEMOLISH ASPHALT DRIVEWAY REMOVE "NO PARKING ANYTIME" SIGN & SIGN POST REMOVE "NO PARKING PRESERVE AND ANYTIME" SIGN & SIGN POST PROTECT TREE REMOVE TREE REMOVE TREE REMOVE CONCRETE CHASE DEMOLISH CONCRETE DRIVEWAY DEMOLISH CONCRETE DRIVEWAY DEMOLISH EXISTING IRRIGATION SYSTEM AND CONTROL BOXES DEMOLISH EXISTING IRRIGATION SYSTEM AND CONTROL BOXES REMOVE TREE PRESERVE & PROTECT EXISTING TREE DEMOLISH ASPHALT CURB DEMOLISH EXISTING IRRIGATION SYSTEM AND CONTROL VALVES REMOVE EXISTING ELECTRIC BOX REMOVE EXISTING ELECTRIC AND GAS METERS & SERVICES PER UTILITY COMPANY'S STANDARDS & REGULATIONS REMOVE "PEDESTRIAN CROSSING" SIGN AND SIGN POST REMOVE 4" PVC ROOF DRAIN PRESERVE AND PROTECT TREE PRESERVE AND PROTECT EXISTING STORM INLETS TO BOX CULVERT (RIM=4979.10, INV N=4974.64) REMOVE CONCRETE STEPS REMOVE STEEL POLES AND CHAIN LINK FENCE (TYP.) PRESERVE & PROTECT EXISTING TELECOMMUNICATIONS LINE PRESERVE AND PROTECT TREE REMOVE CURB AND GUTTER REMOVE CURB AND GUTTER TREE PLANTER (TYP.) EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY REMOVE EXISTING POWER POLE PRESERVE EXISTING 3 4" WATER SERVICE (SEE UTILITY PLAN) REMOVE ELECTRIC SERVICE PER UTILITY COMPANY'S STANDARDS & REGULATIONS REMOVE ELECTRIC SERVICE PER UTILITY COMPANY'S STANDARDS & REGULATIONS REMOVE EXISTING CURB STOP AND PLUG WATER SERVICE AT THE MAIN PER CITY OF FORT COLLINS STANDARDS AND REGULATIONS REMOVE CONCRETE DRIVEWAY REMOVE EXISTING CURB STOP AND PLUG WATER SERVICE AT THE MAIN PER CITY OF FORT COLLINS STANDARDS AND REGULATIONS SAWCUT MINIMUM 1' FROM FLOWLINE OF EXISTING CURB TO PROVIDE CLEAN STRAIGHT EDGE. Thursday, April 23, 2015 10:17 AM D:\Projects\940-002\Dwg\Exist\940-002_EXST.dwg Wegert Provencio C100 EXISTING CONDITIONS & DEMOLITION PLAN CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E LEGEND: CTV FIELD SURVEY BY: NOTES: SS W VAULT ELEC H Y D CONTROL IRR / / / / / / / / / E / / / / / / / / FO G T ST E N OT FO R C O N S T RUC TIO N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 / / / / / OHE / / / / / / OHE / / / / / / 1 :  1 (  6(  6:  L AP O R T E AVE NU E ( 100 ' R O W ) (PE R P L A T OF C IT Y OF FO R T C O LL I N S L ESS B OO K 175 , PA G E 40 ) H OW ES S T R EE T ( 140 ' R O W ) (PE R P L A T OF C IT Y OF FO R T C O LL I N S L ESS B OO K 69 , PA G E 261 ) B L O C K 42 C I T Y OF FO R T C O LL I N S BLOCK 31 CITY OF FORT COLLINS PART OF BLOCK 32, CITY OF FORT COLLINS PARCEL 9711126934 PARCEL 9711126938 PARCEL 9711126936 PARCEL 9711126937 PARCEL 9711126954 BLOCK 1 CIVIC CENTER OFFICE BUILDING LOT 1 20 ' A LL EY (PE R P L A T OF C IT Y OF FO R T C O LL I N S) 20 ' A LL EY (PE R P L A T OF C IT Y OF FO R T C O LL I N S) BASIS OF BEARINGS WEST LINE OF BLOCK 32 LOT 1 51,325 sq. ft. 1.178 ac. 10.00' 10' EMERGENCY ACCESS ALIGNMENT L5 (TIE) EXISTING 100-YR CITY HIGH RISK FLOOD FRINGE EXISTING 100-YR CITY FLOODWAY 35.03' L11 C 5 L6 L7 L8 L9 L10 L3 L4 C 4 C 3 L26 L27 L28 L25 L22 L23 39 . 13 ' L20 L21 L19 34.88' L17 L18 L15 L14 L13 L16 L1 C1 C 2 L2 L12 (TIE) 52 . 10 ' 35.96' 22.63' L24 ( TI E) CURVE TABLE CURVE C1 C2 C3 C4 C5 DELTA      RADIUS 25.00' 25.00' 332.17' 767.24' 767.24' LENGTH 8.46' 30.84' 83.44' 15.05' 50.31' BEARING 6( 6( 1( 1( 1( CHORD 8.42' 28.92' 83.22' 15.05' 50.30' LINE TABLE LINE L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 LENGTH 1.07' 7.54' 111.64' 20.46' 8.16' 18.68' 39.51' 11.44' 9.84' 12.32' 18.84' 6.00' 9.49' 8.00' BEARING 6 : 6 : 6 : 1( 6 : 6 : 6 : 6 : 6 : 1 : 1( 6 : 6( 1( LINE TABLE LINE L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 L27 L28 LENGTH 9.49' 8.00' 11.09' 34.25' 4.48' 7.75' 52.89' 15.17' 14.47' 23.48' 28.07' 21.49' 24.44' 16.47' BEARING 1: 6: 1: 6: 6 ( 1: 1 ( 6 ( 6: 1: 6: 1 ( 6 ( 6 ( NOTICE: According to Colorado law you must commence any legal action based upon any defect in this survey within three years after you discover such defect. In no event may any action based upon any defect in this survey be commenced more than ten years after the date of the certificate shown 301 North Howes Street, Suite 100 hereon. Fort Collins, Colorado 80521 NRN O R T H E PHONE: 970.221.4158 www.northernengineering.com 1 MAINTENANCE GUARANTEE: The Owner hereby warrants and guarantees to the City, for a period of two (2) years from the date of completion and first acceptance by the City of the improvements warranted hereunder, the full and complete maintenance and repair of the improvements to be constructed in connection with the Development which is the subject of this Plat. This warranty and guarantee is made in accordance with the City Land Use Code and/or the Transitional Land Use Regulations, as applicable. This guarantee applies to the streets and all other appurtenant structures and amenities lying within the rights-of-way, Easements and other public properties, including, without limitation, all curbing, sidewalks, bike paths, drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any maintenance and/or repair required on utilities shall be coordinated with the owning utility company or department. The Owner shall maintain said improvements in a manner that will assure compliance on a consistent basis with all construction standards, safety requirements and environmental protection requirements of the City. The Owner shall also correct and repair, or cause to be corrected and repaired, all damages to said improvements resulting from development-related or building-related activities. In the event the Owner fails to correct any damages within thirty (30) days after written notice thereof, then said damages may be corrected by the City and all costs and charges billed to and paid by the Owner. The City shall also have any other remedies available to it as authorized by law. Any damages which occurred prior to the end of said two (2) year period and which are unrepaired at the termination of said period shall remain the responsibility of the Owner. REPAIR GUARANTEE: In consideration of the approval of this final Plat and other valuable consideration, the Owner does hereby agree to hold the City harmless for a five (5) year period, commencing upon the date of completion and first acceptance by the City of the improvements to be constructed in connection with the Development which is the subject of this Plat, from any and all claims, damages, or demands arising on account of the design and construction of public improvements of the property shown herein; and the Owner furthermore commits to make necessary repairs to said public improvements, to include, without limitation, the roads, streets, fills, embankments, ditches, cross pans, sub-drains, culverts, walls and bridges within the right-of-way, Easements and other public properties, resulting from failures caused by design and/or construction defects. This agreement to hold the City harmless includes defects in materials and workmanship, as well as defects caused by or consisting of FNDtling trenches, fills or excavations. Further, the Owner warrants that he/she owns fee simple title to the property shown hereon and agrees that the City shall not be liable to the Owner or his/her successors in interest during the warranty period, for any claim of damages resulting from negligence in exercising engineering techniques and due caution in the construction of cross drains, drives, structures or buildings, the changing of courses of streams and rivers, flooding from natural creeks and rivers, and any other matter whatsoever on private property. Any and all monetary liability occurring under this paragraph shall be the liability of the Owner. The Owner further warrants that the Owner has the right to convey said land according to this Plat. NOTICE OF OTHER DOCUMENTS: All persons take notice that the Owner has executed certain documents pertaining to this Development which create certain rights and obligations of the Development, the Owner and/or subsequent Owners of all or portions of the Development site, many of which obligations constitute promises and covenants that, along with the obligations under this Plat, run with the land. The said documents may also be amended from time to time and may include, without limitation, the Development Agreement, Site And Landscape Covenants, Final Site Plan, Final Landscape Plan, and Architectural Elevations, which documents are on file in the office of the clerk of the City and should be closely examined by all persons interested in purchasing any portion of the Development site. SURVEYOR'S STATEMENT I, Eric R. Smith, a Colorado Registered Professional Land Surveyor do hereby state that this Subdivision Plat was prepared from an actual survey under my personal supervision, that the monumentation as indicated hereon were found or set as shown, and that the foregoing plat is an accurate representation thereof, all this to the best of my knowledge, information and belief. __________________________________ Eric R. Smith Colorado Registered Professional Land Surveyor No. 37987 for and on behalf of Northern Engineering Services, Inc. ATTORNEY'S CERTIFICATION I hereby certify that this Subdivision Plat has been duly executed as required pursuant to Section 2.2.3(C)(3)(a) through (e) inclusive of the Land Use Code of the City of Fort Collins and that all persons signing this Subdivision Plat on behalf of a corporation or other entity are duly authorized signatories under the laws of the State of Colorado. This Certification is based upon the records of the Clerk and Recorder of Larimer County, Colorado as of the date of execution of the Plat and other information discovered by me through reasonable inquiry and is limited as authorized by Section 2.2.3(C)(3)(f) of the Land Use Code. Attorney:________________________________________ Address: ________________________________________ ________________________________________ Registration No.:__________________________________ APPROVED AS TO FORM, CITY ENGINEER By the City Engineer of the City of Fort Collins, Colorado this ______day of _____________ A.D., 20_____. ____________________________________________________ City Engineer PLANNING APPROVAL By the Director of Planning the City of Fort Collins, Colorado this _____ day of ___________ A.D., 20_____. ____________________________________________________ Director of Planning NOTES: 1) The Basis of Bearings is the:HVWOLQH%ORFNDVEHDULQJ1RUWK(DVW(assumed bearing) and monumented as shown on plat. 2) All information regarding easements, right-of-way or title of record, Northern Engineering relied upon Property Information Binder Policy Number PIB25127047.635060, dated November 19, 2014, prepared by Land Title Guarantee Company. 3) The lineal unit of measurement for this plat is U. S. Survey Feet. 4) PROJECT DATUM: NGVD29 Unadjusted (Old City of Fort Collins Datum) BENCHMARK #1: City of Fort Collins Benchmark 1-13 Southwest corner of College Avenue and Maple Street, on a concrete traffic signal base. Elevation= 4976.58 BENCHMARK #2: City of Fort Collins Benchmark 5-00 On the top of curb at the signal pole base at the northwest corner of Linden Street and Jefferson Street. Elevation= 4974.87 NOTE: If NAVD 88 Datum is required for any purpose, the following equation should be used: NAVD88 = NGVD29 Unadjusted + 3.17' STATEMENT OF OWNERSHIP AND SUBDIVISION: Know all persons by these presents, that the undersigned owner(s) of the following described land: A tract of land being a portion of Block 32, City of Fort Collins, located in Section 11, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado being more particularly described as follows: &RQVLGHULQJWKH:HVWOLQHRI%ORFNDVEHDULQJ1RUWK(DVWDQGZLWKDOOEHDULQJVFRQWDLQHGKHUHLQUHODWLYHWKHUHWR %(*,11,1*DWWKH6RXWKZHVWFRUQHURIVDLG%ORFNWKHQFHDORQJVDLG:HVWOLQH1RUWK(DVWIHHWWRDSRLQWRQWKH6RXWKOLQHRID DOOH\WKHQFHDORQJVDLG6RXWKOLQH6RXWK(DVWIHHWWRDSRLQWRQWKH:HVWOLQHRIDDOOH\WKHQFHDORQJVDLG:HVWOLQH6RXWK :HVWIHHWWRDSRLQWRQWKH6RXWKOLQHRIVDLG%ORFNWKHQFHDORQJVDLG6RXWKOLQH1RUWK:HVWIHHWWRWKH POINT OF BEGINNING. The above described area contains 51,325 square feet or 1.178 acres more or less and is subject to all easements and rights-of-way now on record or existing. For themselves and their successors in interest (collectively "Owner") have caused the above described land to be surveyed and subdivided into lots, tracts and streets as shown on this Plat to be known as COFC UTILITIES ADMINISTRATION BUILDING (the "Development"), subject to all easements and rights-of-way now of record or existing or indicated on this Plat. The rights and obligations of this Plat shall run with the land. A REPLAT OF A PORTION OF BLOCK 32, CITY OF FORT COLLINS, LOCATED IN THE NORTHEAST QUARTER OF SECTION 11, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO PROJECT LOCATION VICINITY MAP NORTH NORTH SET CORNER AS DESCRIBED BOUNDARY LINE EASEMENT LINE LOT LINE FOUND PROPERTY CORNER AS DESCRIBED DAALIGNMENT DRAINAGE CERTIFICATE OF DEDICATION: The undersigned does hereby give notice in accordance with applicable City policies and standards, of the public utility and emergency access alignments as laid out and designated on this plat. OWNER: City of Fort Collins BY:_________________________________ City Manager, City of Fort Collins STATE OF COLORADO ) )SS COUNTY OF LARIMER ) The foregoing instrument was acknowledged before me this _____ day of ___________________, 20____, by _____________________________________________. City Manager, City of Fort Collins Witness my hand and official seal My commission expires: ________________ _______________________________ Notary Public NOTICE: This plat generally shows certain alignments to document the existence of the alignments for public access, drainage, emergency access, trail, and utility improvements, for the benefit of the City of Fort Collins. The depiction of these alignments on this plat is further intended to give general notice to the public of the existence of the alignments and the associated improvements. The City of Fort Collins, prior to conveying its interest in the City property to any person, shall take note, and, to the extent it determines at that time to be appropriate, reserve from such conveyance an easement or right-of-way or other interest in land sufficient to reserve a right for the continued existence, operation, maintenance, repair and, if necessary, enlargement of said alignments and improvements. More particularly, this plat shows certain designated drainage alignments, within which certain storm drainage improvements are intended to be constructed (drainage alignment). Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the City of Fort Collins Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (1) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NGVD29 Unadjusted (Old City of Fort Collins Datum) BENCHMARK #1: City of Fort Collins Benchmark 1-13 Southwest corner of College Avenue and Maple Street, on a concrete traffic signal base. Elevation= 4976.58 BENCHMARK #2: City of Fort Collins Benchmark 5-00 On the top of curb at the signal pole base at the northwest corner of Linden Street and Jefferson Street. Elevation= 4974.87 NOTE: If NAVD 88 Datum is required for any purpose, the following equation should be used: NAVD88 = NGVD29 Unadjusted + 3.17' BASIS OF BEARING: Basis of Bearings is the :HVWOLQHRI%ORFNEHDULQJ6:DVVXP HGEHDULQJ . 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: - None CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7.In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8.When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer or their designate. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Final Drainage Report for City of Fort Collins Utilities Administration Building dated April 29, 2015 by Northern Engineering Services, Inc., shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3.Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. Thursday, April 23, 2015 10:17 AM D:\Projects\940-002\Dwg\940-002_COVR.dwg Wegert Provencio C001 GENERAL & CONSTRUCTION NOTES CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R N OT FO R C O N S T RUC TIO N MOUNTAIN AVE. E. MULBERRY ST S. COLLEGE AVE. LAPORTE AVE. MAPLE AVE. S. MASON AVE. S. HOWES AVE. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R APRIL 2015 UTILITY PLANS FOR CONTACT INFORMATION PROJECT TEAM: Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT LOCATION VICINITY MAP PROJECT DATUM: NGVD29 Unadjusted (Old City of Fort Collins Datum) BENCHMARK #1: City of Fort Collins Benchmark 1-13 Southwest corner of College Avenue and Maple Street, on a concrete traffic signal base. Elevation= 4976.58 BENCHMARK #2: City of Fort Collins Benchmark 5-00 On the top of curb at the signal pole base at the northwest corner of Linden Street and Jefferson Street. Elevation= 4974.87 NOTE: If NAVD 88 Datum is required for any purpose, the following equation should be used: NAVD88 = NGVD29 Unadjusted + 3.17' Basis of Bearings Basis of Bearings is the :HVWOLQHRI%ORFNEHDULQJ6:DVVXP HG bearing). Northern Engineering Services, Inc NE Project No. 100-010 Date: February 2013 ORIGINAL FIELD SURVEY BY: CTL Thompson 351 Linden Street, Suite 140 Fort Collins, Colorado 80524 (970) 206-9455 SUBSURFACE EXPLORATION BY: PROJECT BENCHMARKS: SHEET INDEX A REPLAT OF A PORTION OF BLOCK 32, CITY OF FORT COLLINS, LOCATED IN THE NORTHEAST QUARTER OF SECTION 11, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO C000 COVER SHEET C001 GENERAL & CONSTRUCTION NOTES SUBDIVISION PLAT (FOR REFERENCE ONLY) C100 EXISTING CONDITIONS & DEMOLITION PLAN C200 HORIZONTAL CONTROL PLAN C300 UTILITY PLAN C400 GRADING PLAN C401 GRADING PLAN DETAILS C500 INTERSECTION OF HOWES & LAPORTE C501 LAPORTE AVENUE CROSS-SECTIONS C502 EAST ALLEY FL PROFILES C600 DRAINAGE & EROSION CONTROL PLAN C700 - C702 CONSTRUCTION DETAILS GAS---------Xcel Energy---------------Amanda Stanley(970) 225-7848 ELECTRIC----- City of Fort Collins Light & Power-- Janet McTague (970) 224-6154 CABLE-------Xfinity-------------------- Don Kapperman (970) 567-0245 TELECOM.----Centurylink----------------Bill Johnson (970) 490-7501 WATER------- City of Fort Collins Utilities------Shane Boyle (970) 221-6854 WASTEWATER--City of Fort Collins Utilities------Shane Boyle (970) 221-6854 STORMWATER- City of Fort Collins Utilities------Glen Schlueter(970) 224-6065 UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER *The underground utility locates provided by SiteWise are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. RNL Design 1050 17th Street, Suite A200 Denver, Colorado 80265 (303) 295-1717 City of Fort Collins PO Box 580 Fort Collins, Colorado 80522 (970) 221-6804 Logan Simpson Design 123 North College Avenue, Suite 206 Fort Collins, Colorado (970) 449-4100 Delich Associates 2272 Glen Haven Drive Loveland, Colorado 80538 (970) 669-2061 SiteWise 7000 N. Broadway Building 3, Suite 305 Denver, Colorado 80221 (303) 430-1414 Thursday, April 23, 2015 10:17 AM D:\Projects\940-002\Dwg\940-002_COVR.dwg Wegert Provencio C000 COVER SHEET CITY OF FORT COLLINS 222 Laporte Avenue Fort Collins, CO 80524 UTILITIES ADMINISTRATION BUILDING PROJECT DEVELOPMENT PLAN NRN O R T H E NRN O R T H E 1050 17th STREET, SUITE A200 DENVER, CO 80265 303 295 1717 t 303 292 0845 f DRAWN BY: CHECKED BY: A B C D E F G H I J A B C D E F G H I J 1234567891011121314 14 13 12 11 10 9 8 7 6 5 4 3 2 1 15 15 K K NRN O R T H E N O T FO R C O N S T RUC TIO N