Loading...
HomeMy WebLinkAboutFRCC HEALTH CARE CAREERS CENTER - PDR180013 - CORRESPONDENCE -sides and rear.) Comment Number: 3 Comment Originated: 09/11/2018: Please provide a one -line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be found at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf Comment Number: 4 Comment Originated: 09/11/2018: Contact Light and Power Engineering to coordinate the transformer and electric meter locations, please show the locations on the utility plans. Comment Number: 5 09/11/2018 09/11/2018 Comment Originated: 09/11/2018 09/11/2018: You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. You may reference Light & Power's Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FINAL_18November2016_Amendment.pdf You may reference our policies, development charge processes, and use the fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/30/2018 O8/30/2018: As of January 1, 2015, all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. Please contact our office for up to date Benchmark Statement format and City Vertical Control Network information. Comment Number: 2 Comment Originated: 08/30/2018 08/30/2018: This property is not platted. If submitting a Subdivision Plat for this property/project, addresses are not acceptable in the Plat title/name. 11 Department: Forestry Contact: Molly Roche, mroche@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 09/11/2018 9/11 /2018: The appear to be existing trees on -site. Prior to the next submittal, please schedule an on -site meeting with City Forestry to obtain tree inventory and mitigation information. Existing significant trees should be retained to the extent reasonably feasible. Comment Number: 2 Comment Originated: 09/11/2018 09/11/2018: Please provide a landscape plan for City Forestry to review and comment on. If applicable, include the City of Fort Collins General Landscape Notes, Tree Protection Notes, and Street Tree Permit Note, providing a detailed Plant List species, quantity, size, method of transplant, and species percentage, and including current and proposed utility lines as well as proper tree separation requirements. Please contact Molly Roche (mroche@fcgov.com) if you have any questions. Required tree sizes and method of transplant: Canopy Shade Tree: 2.06 caliper balled and burlapped Evergreen tree: 6.0L height balled and burlapped Ornamental tree: 1.5� caliper balled and burlapped If any mitigation is required, trees must be upsized to the following dimensions: Canopy Shade Trees: 3.0" caliper balled and burlap or equivalent. Evergreen Trees: 8' height balled and burlap or equivalent. Ornamental Trees: 2.5" caliper balled and burlap or equivalent. Comment Number: 3 Comment Originated: 09/11/2018 09/11/2018: Include locations of any water or sewer lines on the landscape plan. Please adjust street tree locations to provide for proper tree/utility separation. 10' between trees and public water, sanitary, and storm sewer main lines 6' between trees and public water, sanitary, and storm sewer service lines 4' between trees and gas lines Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/11/2018 09/11/2018: There is an existing switch cabinet near the north west corner of the building labeled "Blanca Peak". This switch cabinet has the ability to run new primary to a dedicated transformer for the proposed new building. Comment Number: 2 Comment Originated: 09/11/2018 09/11/2018: Transformer locations shall be within 10' of a paved surface and must have a minimum of an 8' clearance from the front side and a 3' clearance around the sides and rear. (1000 kVA up to 2500 WA requires 4' around the 10 Plants document available online and published by the City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants20l3.pdf. Also see the City of Fort Collins Plant List: https://www.fcgov.com/forestry/plant_list.pdf. Comment Number: 2 Comment Originated: 09/11/2018 09/11/2018: If there may be impacts to trees note LUC Section 3.2.1(C) requires developments to submit a landscape and tree protection plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat, and (5) enhances the pedestrian environment. " Note that a significant tree is defined as one having DBH (Diameter at Breast Height) of six inches or more. If trees may be impacted then a review of trees shall be conducted with Ralph Zentz, Senior Urban Forester (970-221-6302 or rzentz@fcgov.com) to determine the status of existing trees and any mitigation requirements that could result from the proposed development. Comment Number: 3 Comment Originated: 09/11/2018 09/11/2018: Note that in regard to lighting, especially LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian (biological) rhythms for both humans and wildlife. Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is preferred. Please also consider fixtures with motion -sensing or dimming capabilities so that light levels can be adjusted as needed. Site light sources shall be fully shielded and down -directional to minimize up -light, light spillage and glare [see LUC 3.2.4(D) (3)]. Thank you in advance for supporting City of Fort Collins Night Sky Objectives. For further information regarding health effects please see: http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/ Comment Number: 4 Comment Originated: 09/11/2018 09/11/2018: Our city has an established identity as a forward -thinking community that cares about the quality of life it offers its residents now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit this project. Of particular interest may be the: 1) ClimateWise program: hitp://fcgov.com/climatewise, contact Heidi Wagner at 970-416-2230 or climatewise@fcgov.com 2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program (WRAP): http://fcgov.com/recycling/wrap.php, contact Jonathon Nagel at 970-416-2701 or jnagel @fcgov.com 3) Green Building Program: http://fcgov.com/greenbuilding contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 4) Solar Energy: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416-2312 or rgatzke@fcgov.com 5) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gschroeder@fcgov.com 6) Bike Share Program: hftp://fcgov.com/bikeshare, contact Stacy Sebeczek at Bike Fort Collins at stacy@bikefortcollins.org or 970-481-5577 7) Nature in the City Program: http://fcgov.com/natureinthecity, contact Justin Scharton at 970-221-6213 orjscharton@fcgov.com 7 Comment Number: 4 09/10/2018: Comment Originated: 09/10/2018 EMERGENCY RESPONDER RADIO COMMUNICATION - AMPLIFICATION SYSTEM TEST > IFC 510 & 1103.2: New & existing buildings require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. The installation of required ERRC systems shall be reviewed and approved under a separate permit process through PFA. LOCAL EXCEPTION: PFA will waive the testing requirement and system installation in all buildings less than 10,000 sq. ft. and any Type V construction building less than 15,000 sq. ft. PFA policy P15-510.1 Comment Number: 5 09/10/2018: Comment Originated: 09/10/2018 FIRE ALARM AND DETECTION SYSTEMS (Group E) > IFC 907.2.3: A manual fire alarm system that initiates the occupant notification signal utilizing an emergency voice/alarm communication system meeting the requirements of Section 907.5.2.2 and installed in accordance with Section 907.6 shall be installed in Group E occupancies. When automatic sprinkler systems or smoke detectors are installed, such systems or detectors shall be connected to the building fire alarm system. With Exceptions. Comment Number: 6 09/10/2018: ADDRESSING/WAYFINDING Comment Originated: 09/10/2018 >The address shall be clearly visible from the street in no less than 10" numerals. Because this new building is located adjacent to Harmony Road but addressed from Shields the full address, including street name, shall be visible from the elevation facing Harmony. Af there are different entrances planned, wayfinding signage shall be provided that indicates the most appropriate entrance. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, Topic: General Comment Number: 1 sblochowiak@fcgov.com Comment Originated: 09/11/2018 09/11/2018: A landscape plan is needed. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and techniques. This includes use of low -water -use plants and grasses in landscaping or re -landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife -friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. Please refer to the Fort Collins Native 9/10/2018: ACCESS >Access is required to within 150ft of all exterior portions of the perimeter of the building. The roll-over curb is noted on the provided documents but it is unclear exactly how this required access will be achieved. >Should this building exceed 30ft in height then aerial apparatus access requirements will be triggered as shown below. Comment Number: 2 Comment Originated: 09/10/2018 09/10/2018: FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be dedicated by plat or separate document as an Emergency Access Easement. > Maintain the required 20-foot minimum unobstructed width & 14 foot minimum overhead clearance. Where road widths exceed 20 feet in width, the full width shall be dedicated unless otherwise approved by the AHJ. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Dedicated fire lanes are required to connect to the Public Way unless otherwise approved by the AHJ. > Be visible by red curb and/or signage, and maintained unobstructed at all times. Sign locations or red curbing should be labeled and detailed on final plans. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate directional arrows required on all signs. > Additional access requirements exist for buildings greater than 30' in height. Refer to Appendix D of the 2015 IFC or contact PFA for details. "STRUCTURES EXCEEDING 30' IN HEIGHT > IFC Appendix D: In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 26 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. Comment Number: 3 Comment Originated: 09/10/2018 09/10/2018: AUTOMATIC FIRE SPRINKLER SYSTEM As noted in the provided documents this building will require an automatic fire sprinkler system under a separate permit. Please contact Assistant Fire Marshal, Jerry Howell with any fire sprinkler related questions at 970-416-2868. 7 They are available online at: https://www.ladmer.org/engineering/streets Comment Number: 11 Comment Originated: 09/11/2018 09/11/2018: This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. Most easements to be dedicated need to be public easements dedicated to the City. This shall include the standard utility easements that are to be provided behind the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other street classifications). Information on the dedication process can be found at: hftp://www.fcgov.com/engineering/devrev.php Comment Number: 12 Comment Originated: 09/11/2018: Civil construction plans maybe required. Comment Number: 13 Comment Originated: 09/11/2018: A Development Agreement or IGA may be required. Comment Number: 14 Comment Originated: 09/11/2018: As of January 1, 2015, all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. Comment Number: 15 Comment Originated: 09/11/2018: All fences, barriers, posts or other encroachments within the public right-of-way are only permitted upon approval of an encroachment permit. Applications for encroachment permits shall be made to the Engineering Department for review and approval prior to installation. Encroachment items shall not be shown on the site plan as they may not be approved, need to be modified or moved, or if the permit is revoked then the site/ landscape plan is in non-compliance. Comment Number: 16 Comment Originated: 09/11/2018: In regard to construction of this site, the public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary staging and/or parking needs associated with the completion of the Development. Information on the location(s) of these areas will be required to be provided to the City as a part of the Development Construction Permit application. Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-tire.org Topic: General Comment Number: 1 09/11/2018 09/11/2018 09/11/2018 09/11/2018 09/11/2018 Comment Originated: 09/10/2018 PFA and the City of Fort Collins is expecting to adopt the 2018 International Fire Code in January 2019. 9-12-2018 UPDATE At the staff meeting the project team stated that they will be meeting with PFA to discuss updated location of the Fire Lane to ensure compliance with the 150ft access requirement. The required hydrant will be located close to the Fire Lane at the front of the building. A Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: General Comment Number: 1 Comment Originated 09/11/2018: The temporary access drive onto Shields would need to be further reviewed in its design and spacing, to ensure it operates as right -in, right -out and that its access spacing is not detrimental to the overall traffic in the area. Comment Number: 2 Comment Originated 09/11/2018: The construction of the project should be staging in a manner that allows two feet of separation/buffer from the back of sidewalk along Harmony and Shields. Comment Number: 3 09/11/2018 09/11/2018 Comment Originated: 09/11/2018 09/11/2018: There was a parking lot project built on the south end of the campus with a replat that was part of an earlier submittal. It does not appear that this project was ever completed with the City between plans and the plat. Comment Number: 4 Comment Originated: 09/11/2018 09/11/2018: Street cuts onto Harmony Road or Shields Street, such as for utilities and/or the temporary driveway connection, would require a Development Construction Permit (DCP) and/or an excavation permit/drive approach permit prior to starting any work. Comment Number: 5 Comment Originated: 09/11/2018 09/11/2018: If going through City of Fort Collins for building permitting, Larimer County Road Impact Fees and Transportation Expansion Fees are due at the time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any questions. Comment Number: 6 Comment Originated: 09/11/2018: The remaining comments are standard comments for reference. Comment Number: 7 Comment Originated: 09/11/2018: The City's Transportation Development Review Fee (TDRF) is due at the time of submittal for any appropriate City review. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php Comment Number: 8 09/11/2018 09/11/2018 Comment Originated: 09/11/2018 09/11/2018: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense. Comment Number: 9 Comment Originated: 09/11/2018: All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the site, need to meet ADA standards. If they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. Comment Number: 10 Comment Originated: 09/11/2018: Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). 09/11/2018 09/11/2018 N1 are no fees charged for existing impervious areas. Stormwater Development Fees for parking lots or other projects that do not require a building permit are due prior to project approval. The fees are calculated the same as for project sites with buildings. More information on stormwater fees can be found at: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen t-development-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. Contact: Jesse Schlam, 970-218-2932, Ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 08/30/2018 08/30/2018: The site disturbs more than 10,000 sq. ft. and if it were constructed within the City's MS4 Boundaries then Erosion and Sediment Control Materials would need to be submitted. The erosion control requirements can be located in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be found at www.fcgov.com/erosion. The Erosion Control Materials would normally be submitted at time of the first round of FDP. Based upon the area of disturbance, State permits for stormwater will be required since the site is over an acre and should be pulled before Construction Activities begin. Please consult with FRCC's Permit Compliance folks to discuss meeting the FRCC's MS4 Permit requirements. If you need clarification concerning the Erosion Control Material Requirements or Comments presented above please contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com Department: Water -Wastewater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcqov.com Topic: General Comment Number: 1 Comment Originated: 09/10/2018 09/10/2018: OTHER SERVICE DISTRICT (SITE SPECIFIC COMMENT): This project site is located within the Fort Collins Loveland Water District and the South Fort Collins Sanitation District for water and sewer service. Please contact them at (970) 226-3104 for development requirements. Department: Traffic Operation Contact: Tim Tuttle, 970-221-6820, TTUTTLE@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/10/2018 09/10/2018: Based on the ITE Trip Generation Manual the estimated number of trips generated for the new building would warrant a Traffic Impact Study. The TIS will help the City analyze the operations of the intersections and make adjustments if needed. Please contact me to scope the study at 970-221-6820. Comment Number: 2 Comment Originated: 09/10/2018 09/10/2018: Will the temporary construction access be returned to its existing condition following construction. 4 09/10/2018: STANDARD WATER QUALITY REQUIREMENTS (STANDARD COMMENT) Standard water quality is provided in the existing extended detention basin located at the northeast corner of the campus. The water quality capture volume must be shown to be adequate with the addition of this project, or additional water quality capture volume will need to be added somewhere on the campus. The general requirement for water quality is that fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-f orms-guidelines-regulations/stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however, the use of any of the BMPs is encouraged. Comment Number: 6 Comment Originated: 09/10/2018 09/10/2018: LID REQUIREMENTS (STANDARD COMMENT): (??) Low Impact Development (LID) requirements are required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment with one of the two following options: 1. 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. 2.75% of all newly added or modified impervious area must be treated by LID techniques. Comment Number: 7 Comment Originated: 09/10/2018 09/10/2018: INSPECTION AND MAINTENANCE (STANDARD COMMENT): There will be a final site inspection of the stormwater facilities when the project is complete and the maintenance is handed over to an HOA or another maintenance organization. Standard operating procedures (SOPs) for on -going maintenance of all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http://www.fcgov. com/utilities/what-we-do/stormwater/stormwater-quality/low-im pact -development Comment Number: 8 Comment Originated: 09/10/2018 09/10/2018: FEES (STANDARD COMMENT): Stormwater Development Fees include two components: Plant Investment Fees (PIFs) and Review Fees. 1. PIFs (2018) are $8,217/acre of new impervious area over 350 square feet ($8,217 x % imperviousness x site acreage) 2. Review Fees are $1,045/acre of new impervious area and based on the impervious area rate factor (i.e. $1,045 x rate factor (based on imperviousness) x site acreage) Fees are to be paid at the time of the issuance of the first building permit. There i1 gross leasable space of proposed building. For medical office use it is min. 2/1000 SF and 4.5/1000 SF max. Please provide information on how existing parking lot will be used for this new Addition, vs. library. Comment Number: 4 Comment Originated: 09/10/2018 Please provide lighting plan and details. It would help to show the locations for new exterior lighting fixtures and clarify full cutoff/down directional lighting will be provided. Comment Number: 5 Comment Originated: 09/10/2018 Please provide building elevations and material/color details and schedules. It might help to clarify on the elevations the character of the glazing material for building windows. How much opacity/reflectivity? Example photographs of materials for P&Z might be helpful. Department: Stormwater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcqov.com Topic: General Comment Number: 2 Comment Originated: 09/10/2018 09/10/2018: MASTER PLAN AND CRITERIA COMPLIANCE (SITE SPECIFIC COMMENT): This site is part of Front Range Community College Campus development and must conform to the drainage design of the approved development plans and Reports. Referenced drainage reports are the Master Drainage Study - Front Range Community College Campus, dated May 22, 2014 and the Master Drainage Study — Front Range Community College Campus, dated December 1, 2010. Comment Number: 3 Comment Originated: 09/10/2018 09/10/2018: DOCUMENTATION REQUIREMENTS (SITE SPECIFIC COMMENT): A drainage report (or addendum to the previous master drainage study) and construction plans are required, and they must be prepared by a Professional Engineer registered in the State of Colorado. The drainage report must address the four -step process for selecting structural BMPs as well as show how the added building is within the impervious assumptions, runoff values and volume provided in the existing detention pond and conveyance systems. Comment Number: 4 Comment Originated: 09/10/2018 09/10/2018: IMPERVIOUSNESS DOCUMENTATION (STANDARD COMMENT): It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. Comment Number: 5 Comment Originated: 09/10/2018 2 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221,6750 970.224.6134 - fax kgov. com/developmentreview September 14, 2018 Derek Brown Front Range Community College 4616 S Shields Street Fort Collins, CO 80526 RE: FRCC Health Care Careers Center, PDR180013, Round Number Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/10/2018 The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public hearing. The applicant for this development request is required to hold a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221 6343, to assist you in setting a date, time, and location. I and possibly other City staff would be present to facilitate the meeting. Comment Number: 2 Comment Originated: 09/10/2018 Please provide landscape plans and details with planting list and legend. Overall planting plan to show full tree stocking, building foundation planting and parking lot screening and interior lot planting islands. Comment Number: 3 Comment Originated: 09/10/2018 Off-street parking requirements for proposed 55,333 SF building. The parking requirements for general office use is minimum 1/1000 SF and 3/1000 SF of