HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - CORRESPONDENCE - (3)along each development boundary that abuts potentially developable or
redevelopable land. It is possible that street connections will be desired
through your site to the north.
c. Pay particular attention to section 3.2.1 of the LUC for landscaping
standards, section 3.2.2 for parking standards, section 3.4.1 for Natural
Habitats and Features standards, and section 3.5.1 for applicable building
standards. -
d. Be sure to read sections 4.23(D)(1) Dimensional Standards, 4.23(E)(2)
Building Design, and 4.23(E)(3) Site Design for standards specific to
development within the I -Industrial zone.
W
(cardboard, cans, plastics, etc.), and dumpsters must be enclosed within a
fenced or walled area.
d. We ask that a single trash hauler be used to minimize traffic impacts.
e. Native grasses and plant materials should be used wherever appropriate, and
blue9rosses should be minimized.
f. If construction lasts for more Than 6 months, you will have to file a permit
for fugitive dust control with Lorimer County.
6. Fire Department:
a. The chemical storage for the treatment plant - involve PFA in the planning.
b. The building must be sprinklered:
c. Fire hydrants - capacity of 1500 g.p.m @ 20 p.s.i. Hydrants must be spaced
no further apart than 600 feet on center.
7. Light and Power:
a. Single phase power is available on Laporte Avenue.
b. You may need an easement to get the power from Laporte Avenue onto your
site.
c. If you build a commercial component to this development, 3 phase power
would not be practical.
d. Normal development fees apply.
8. Transportation:
a. The TIS update will need to address all modes of transportation including
vehicle, bicycle, pedestrian and transit. Contact Eric Bracke (vehicular),
Mark Jackson (ped & bike), and Gayleene Possiter (transit) for scoping.
b. Be sure that your internal pedestrian and bicycle circulation provides direct
connections to nearby destinations.
c. Bicycle parking must be provided near building entrances.
d. Option 2 may have neighborhood opposition to the south. Keep that in mind.
e. Buckingham is a collector.
f. The proposed rail spur may conflict with the Fort Collins Streets Facility
and the CDOT Facility north of this site.
9. Current Planning:
a. Refer to Section 3 (General Development Standards), and Section 4.23
(Industrial Zoning District) in the Land Use Code for the standards that
apply to your proposed development. The Land Use Code is available to view
on the internet at www.ci.fort-collins.co.us/CITY HALL/CODES..
b. As per Section 3.6.3(F) of the LUC, your development plan shall provide for
future public street connections to adjacent developable parcels by
providing a local street connection spaced at intervals not to exceed 660'
4
3. Engineering Department:
a. The project will require a Traffic Impact Study (TIS) that addresses site
access, and all modes of transportation including automobile, bicycle,
pedestrian, and transit.
b. Street Oversizing Fees are based on the Traffic Impacts. Check with Matt
Baker for the specific amount of this fee for your project.
c. The property will need to be platted where the proposed water treatment
plant will be located. The dedication of right-of-way to standards includes
necessary easements.
d. The irrigation ditch on Buckingham will need to be relocated.
e. Improvements will be needed to the frontage along the area being platted
(dedicate ROW and easements, move ditch out of ROW).
f. Need to see any changes to existing drives.
g. Need to see how proposed drives align with existing streets.
h. Railroad spur - include info on use. Need to see how you plan on getting
tracks to the site, how it affects other properties. Need easements and
right-of-way.
i. Lemay - if the project gets out this far, you would probably only need to
escrow for improvements at this time.
j. Need to plat.
k. You will be required to have a Development Agreement, a Development
Construction Permit, and Utility Plans.
4. Water & Wastewater Utility:
a. An 8" sewer main was extended across the site of the building expansion. If
this sewer runs under a area with only overhead conveyers, we may be able
to make it work.
b. There is and existing 12" water main, and an 8" sewer main in Buckingham.
We are experiencing capacity problems in this area.
c. Water Plant Investment Fees and Water Rights are due at the time of
building permit.
d. Water conservation standards for landscape irrigation will apply.
5. Natural Resources:
a. An Ecological Characterization Study is required because there is a Riparian
Forest identified on the city's for Natural Habitats and Features plan just
south of this site.
b. If there are any prairie dogs on site, they will have to be relocated or
humainly eradicated.
c. Trash enclosures should accommodate recycling containers of sufficient size
to accommodate the type of recycling appropriate for the building use
3
Light and Power Doug Martine 221-6700
Transportation Services (ped. & transit) Mark Jackson 416-2029
Transportation Services (traffic) Eric Bracke 224-6062
Transfort (local bus service) Gaylene Rossiter 224-6195
Park Planning Craig Foremean 221-6618
COMMENTS:
1. Zoning Department:
a. The property is located in the I -Industrial zoning district.
b. The use would be considered light industrial and office which are both Type
1 uses.
c. An ODP would be Type 2 review.
d. Ensure that there is adequate bicycle parking close to the door. It appears
that you may need an additional rack.
e. Provide trash enclosures.
f. Provide the required number of handicap parking spaces.
g. The landscaping looks good, but keep the residential buffer in mind.
h. Industrial uses limit parking spaces to no more than 0.75 spaces per
employee.
i. No more than 15 parking spaces are allowed in a row without an intervening
landscape island. All landscape islands within parking lots must have a tree
and be at least 8 feet in their smallest dimension.
2. Stormwater Utility Department:
a. This site is in the Dry Creek drainage basin where the new development fee
is $5,000/acre which is subject to the runoff coefficient reduction. The
brew house addition may be in the Poudre River basin where there are
currently no new development fees.
b. The site is in inventory grid #96.
c. The standard drainage and erosion control reports and construction plans
are required and they must be prepared by a professional engineer
registered in Colorado.
d. The existing outfalls for the site are limited so onsite detention is required.
The standard release rate is the 2 year historic rate. However, the outfalls
may even limit it more. I would suggest a meeting with 5tormwater staff
once the design engineer has reviewed the site constraints and has
preliminary ideas of how to drain the site as well as the historic drainage
patterns. A new outfall system to the Poudre River may be needed since
there are properties in the County that are flooded frequently now.
e. Water quality extended detention is required to treat runoff.
f, This site is not in a floodplain or the Poudre River "product corridor".
1)
MEETING DATE: August 7, 2000
ITEM: Expansion of New Belgium Brewery.
APPLICANT: Angie Melewski
BHA Design
4803 Innovation Drive
Fort Collins, CO 80525
LAND USE DATA:
The New Belgium owners actually own (or have an option on) all the property
between the existing brewery building and Lemay. The applicant intends to submit
an application for an ODP by early September. The expansion is proposed in 2 to 3
phases. This conceptual includes 2 future phases: (1) an addition to expand storage
and distribution to the east of the existing building, and (2) an addition to expand
the brew house to the north west between the existing building and Linden Street.
The applicant is proposing an on site water treatment plant to reuse some of the
water. A visitor center and possible bed & breakfast building are proposed in a new
detached building near the south property line. The applicant is exploring the
possibility of extending a rail spur from the railroad along drive to the site. Two
alternatives were presented: option 1 had a new parking lot on the north side of the
building, option 2 had an expanded parking lot on the south side of the building and
a new service drive on the north. .
DEPARTMENTAL CONTACTS:
Current Planning-
Troy Jones
221-6750
Zoning Department-
Jenny Nuckols
221-6760
Engineering Department-
Sheri Wamhoff
221-6605
Street Oversizing Coordinator-
Matt Baker
221-6605
Poudre Fire Authority-
Ron Gonzales
221-6570
Stormwater Utility- ,
Glen Schlueter
224-6065
Water & Sewer Utilities-
Roger Buffington
221-6854
Natural Resources Development Planner
Kim Kreimeyer
221-6750
COMMUNITYPLANNINGAND ENVIRONMENTAL SERVICES 281 N. College Ac e. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750
CURRENT PLANNING DEPARTMENT
Comni -pity Planning and Environmental Services
Current . tanning
City of Fort Collins
Angie. Melewski
BHA Design
4803 Innovation Drive
Fort Collins, CO 80525
Dear Ms. Melewski:
August 25, 2000
For your information, attached is a copy of the 5taff's comments concerning
the New Belgium Brewery expansion presented before the Conceptual Review
Team on August 14, 2000.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions
to these comments may be made at the time of formal review of this
project.
If you should have any questions regarding these comments or the next
steps in the review process, please feel free to call me at 221-6750.
Sihcerely,
i
Troy W. Jon s
City Planner
cc: Eric Bracke, Streets Department
Stormwater Department
Project Planner
File