HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - CORRESPONDENCE - STAFF'S PROJECT COMMENTS3 Issue Contact: Jenny Nuckols Plant notes #4 - add to "valuation of materials" ""and installation"" 4 Issue Contact. Jenny Nuckols Site plan - need to see building envelope, dimension, distance to property lines 5 Issue Contact: Jenny Nuckols land Use table notes 1 truck dock/parking space. I don't see that noted anywhere on the plan - please clarify 0 Issue Contact. Jenny Nuckols Be sure and return all of your redlined plans when you re -submit. If you have questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, TED SHEPARD City Planner 5 of 6 26 Issue Contact: Basil Harridan Report Issues: Please stamp report. Why were the release rate of 0.2 cfs for mainor storm and 0.5 cfs for major storm mentioned in the report ? This site is in Dry Creek Basin mostly and does not have these release criteria. Please provide more discussion in the report for the proposed outfall and where would the site drain. Transportation Planning 27 Issue Contact: Mark Jackson -Need to make improvements to frontage on Buckingham, including connection of sidewalk from its current termination at 1 st street east to site boundary. Improve sidewalk, parkway, bike lanes to Collector Street standards. 29 Issue Contact: Mark Jackson Buckingham cross section shown in the TIS is incorrect. 4' Bike Lanes are not satisfactory. Water Wastewater 14 Issue Contact: Jeff Hill Chain link fence separation Maintain a 10 foot minimum separation between proposed chain link fence and existing 24-inch sanitary sewer trunk. 15 Issue Contact: Jeff Hill Provide a 30 foot wide minimum utility easement for the existing 24-inch sanitary sewer trunk. 16 Issue Contact: Jeff Hill Will proposed process plant need a domestic water service? 17 Issue Contact: Jeff Hill Match the invert of the proposed sanitary sewer service to the crown of the existing sanitary sewer trunk. Zoning ) q Issue Contact: Jenny Nuckols de le.kc . 2 Contact: Jenny Nuckols oK :1;Fl�t.�- �5 �e 4 of 6 1, "4 z Sc.✓vurol IOU 5ue.,-;11 j . 22 Issue Contact Basil Hamdan Utility plan issues: Please clarify on the utility plan what lines are existing and which one(s) is proposed. It seems that not all existing storm lines are shown as existing according to plan key. Please call out class of proposed storm sewer. 23 Issue Contact. Basil Hamdan Detail sheet issues: The provided detail for the detention/water quality outlet pond is generic. Please provide all actual inverts and proposed water surface elevations on the detail sheet in a form that can be built by the contractor. Please show proposed water quality detail with proposed orifice sizing as per calculation in the report on the shown detail. Provide a spillway detail for the pond. The spillway should be protected agianst rosion. Please call out the pipe size on the trench drain detail. 24 Issue Contact. Basil Hamdan Outfall Issues: The plan does not address where the flows leave once they are released form the site. There seems to be several locations where undetained runoff could leave the site. Please direct all developed flows to proposed water quality/detention pond. There is no planned outfall shown for the releease from the pond. As previously mentioned at the ODP stage, the proposed pond would drain seemingly into the existing borrow ditch along Lemay. The City and the County have agreed that no new developed dtrainage should be directed toward the Lincoln Stret ditch since it is caiusing flooding in existing County businesses. Please contact City and County staff to schedule a meeting to discuss outfall issue. 25 Issue Contact. Basil Hamdan Landscape Plan issues: The propsed landscape plan does not address what will be done as far as landscaping in the proposed detention/water quality pond. The seeding of native non -irrigated grasses as shown on the Landscape Plan should be reflected on the Erosion Control Plan- 3 of 6 Stormwater Utility 18 Issue Contact. Basil Hamdan Plat issues: Please dedicate on the plat all necessary drainage easements for the proposed detention/water quality ponds on the property. 1 g Issue Contact: Basil Hamdan Grading issues: The grading plan does not match up with the drainage plan. It seems that there are basin divides that are not indicated by the drainage plan. Call out spillway location and elevations on the grading plan. The grading plan is missing some of the existing grading on sheet 4. The slopes should be called out at several locations rather than the generic indication of "slope varies". 20 Issue Contact. Basil Hamdan Drainage issues: The drainage plan should show flow arrows indicating the general direction of flows. A legend should be added to the drainage plan. Please provide a drainage as well as a pond summary table on the drainage plan. The grading is such that there is nothing to prevent flows from the proposed wastewater treatment facility from flowing off -site undetained. Please correct. Basin lines do not follow shown grading. Basin lines do not close. It seems that more drainage sub -basins should be delineated to reflect the proposed grading. There are concentrated flows from the West that are being directed toward Buckingham Street, how will these flows be handled ? 21 Issue Contact: Basil Hamdan Erosion Control issues: All disturbed areas should be seeded and mulched. Call out sediment trap at the water quality pond outlet. Make sure silt fence is tied in continuously around the site. Please make sure that construction schedule BMP's match those shown on the plan. Provided efficiency calcs do not reflect BMP's shown on the plan. Please provide a security deposit cost estimate calculation in the report. 2 of 6 ��" irpC'A71 STAFF PROJECT R New Belgium Brewing Co. BHA Design 4803 Innovation Drive Fort Collins, CO 80525 r ew 0694 F Date: 6/13/2001 Staff has reviewed your submittal for NEW BELGIUM BREWERY EXPANSION, PDP, #1- 95D, and we offer the following comments: ISSUES: Natural Resources PFA 30 �7 Issue Contact: Doug Moore Has the City Forester reviewed the two tree�o be removed? Two Existing Plains Cottonwoods, o e 24" and the other 36" are shown as being removed. Has the City Forester look at these tree to determine if they are consider significant under the Fort Collins Land Use Code? If these trees are significant what mitigation or protection is being recommended under the Tree Preservation Standards. 3.2.1(F) 7 0 11 12 13 ACCESS A fire lane will be required construction. Issue Contact. Ron Gonzales Submit a plan for review/approval prior to start of Issue Contact. Ron Gonzales WATER SUPPLY A fire hydrant is required w/in 300 ft of the building. Thereafter, they are located on 600 ft. centers down the street and/or fire lane. Issue Contact: Ron Gonzales FIRE SPRINKLERS Sprinklers required for expansion fire protection. Also required in H-7 Occupancy. Issue Contact: Ron Gonzales HAZMAT Enough hazmat (corrosives) to warrant H-7 Occupancy. All UFC Art. 80 systems required for use and storage of corrosives. KNOX BOX REQUIRED Issue Contact Ron Gonzales