HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProje(t: N '
r--
Planner: �� d 51 ��
�-�r Traffic Operations:
Engineer:
DPP
Items Requested
Site land Plat I Ufiliq Drainage R t I Other Items Required
Engineering x
Redlined Itt
Site land Plat
x x
Stormwater
Hater/Wastewater
Tragic Operations
i
x
X
x
x
X
X
Trans. Planning
Tramlbrt
Natural Resources
Park Planning
Totals
y
y
3
`i
t
Ober:
Mote: All redlined items should be returned with the resubmittal/ revisions.
Date: L217C)X
ms Being Returned
Revisions RI
off
FILE: PROJECT PIANNER,
m
III
ma
ADVANCE PLANNING
mR.O.W. ��
PLANNING
m
WATER CONSERVATION
.• •
m�
iiii���������
PUBLIC SERVICE
.
mm���
STATE HIGHWAY DEPARTM
INiiim
mDITCH ���
RAILROAD:, :
iii����������
Bin
mLmommmmm
an off- X O v N O