HomeMy WebLinkAboutPROSPECT COMMONS (FORMERLY GREENS) PUD - FINAL - 15-95A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSPlease contact me at 221-6750 if you have questions or concerns
related to these comments. I would like to schedule a meeting with
you as soon as possible, ifnecessary, to discuss these comments.
Sinc rely,
Steve Olt
Project Planner
xc: Kerrie Ashbeck
Stormwater Utility
Transportation
Parsons & Associates
file/Project Planner
mi
10. A copy of the comments received from the Stormwater Utility is .
attached to this letter.
11. A copy of the comments received from the Engineering
Department is attached to this letter. Also, a red -lined copy
of the Site Plan, with additional comments, is enclosed with
the letter to Architectural Horizons.
12. The Natural Resources Division has stated that it would be
preferable that the European Mountain Ash be replaced with a
non-invasive ornamental in the residential area, and native
species in the "Active Open Space" near Spring Creek. These
trees are invading some natural areas in Fort Collins, and
could pose future maintenance of water flow problems in Spring
Creek.
13. What is the surface of the bicycle path to Spring Creek going
to be? The 8' trail width seems sufficient. What is the trail
setback from the east property line? There will be cost to the
developer for the trail provision.
14. The planting plan for the "Active Recreation Area" appears to
be a little weak.
15. How are the stormwater crossing under the bike path, along the
east and west sides of the property, going to function? The
points of stormwater outfall into Spring Creek must be
aesthetically pleasing.
16. The new bike path connection to the Spring Creek Trail must
intersect at 90 degrees or be flared in some manner..
17. The owner of the ditch lateral to the north end of the
property will need to sign the subdivision plat and utility
plans.
This completes the review comments at this time. Additional
comments may be forthcoming as the various departments and
reviewing agencies continue to review this request. Please be aware
of the followincr dates and deadlines to assure your ability to stay
on schedule for the July 24, 1995 Planning and zoning Board
hearing:
******************************************************************
Plan revisions are due no later than the end of the working day,
July 5, 1995. Please contact me for the number of folds revisions
required for each document.
PMTIs (photo reduction of Site Plan to 8.511. x 1111), rendering (one
colored full size Site Plan), and 8 folded copies of. final full
size Site Plan revisions (for the Planning and Zoning Board
packets) are due by 3:00 p.m. on July 17, 1995.
******************************************************************
e. The .legal description should go around the "excepting
parcel".
f. This plat is too incomplete. Please redo and resubmit.
A red -lined copy of the plat is enclosed with this letter.
5. The following comments have been received from the Light &
Power Department:
a. Note the attached Light & Power estimating guide.
b. If Ukiah Lane is a dedicated City street, the Light &
Power development fees could increase by approximately
$10,000 versus being a private street (not dedicated to
the public).
C. Street lighting would not be provided by the City if this
were a private street.
6. The Water/Wastewater Department comments have been forwarded
to your engineer on a red -lined set of utility plans and to
Architectural Horizons on a red -lined Landscape Plan.
7. The following comments have been received from the Parks &
Recreation Department: .
a. Replace the proposed European Mountain Ash with Willows
or Cottonwoods along the bike trail.
b. Maintain a 16' clear zone from the centerline of the
sidewalk - no trees or shrubs.
C. A red -lined construction detail sheet 5 of 8 in the
utility plans, with concerns regarding the bike trail,
has been forwarded to your engineer. A red -lined
Landscape Plan, with comments, is enclosed with this
letter to Architectural Horizons.
8. A copy of the plant list, with recommendations from the City
Forester for species changes, is attached to this letter to
Architectural Horizons. Also, please add a note to the
Landscape Plan that reads:
All existing trees will be pruned to City Forestry medium
prune standards.
9. This is a relatively tight single family project. A Planning
Department observation --- It would be a nicer project if the
cramped garage/ street scape were countered with an open view
down to Spring Creek, with no homes at the south end (meaning
the elimination of two homes).
Commv--'ty Planning and Environmental '-rvices
Current 1 —aning
June 16, 1995
Bob Sutter
Architectural Horizons
4730 South College Avenue
Fott Collins, CO. 80525
Dear Bob,
Staff has reviewed your documents for the Prospect Greens P.U.D. -
Final that were submitted to the City on May 22, 1995, and would
like to offer the following comments:
1. The following comments have been received from the Zoning
Department:
a. Some of the lot dimensions shown on the Site Plan do not
agree with the subdivision plat.
b. It is too hard to tell what the building envelopes or the
setbacks are from the Site Plan information.
C. When will the common areas landscaping be completed? It
is very difficult to tell from Note 4 on the Landscape
Plan.
2. A copy of the comments received from the Building Inspection
Department is attached to this letter.
3. The City Right of Way Agent has requested that you make sure
the necessary language is on the final subdivision plat
concerning the required easement(s) for the Spring Creek trail
(see attached Exhibit A).
4. The following comments have been received from the
Mapping/Surveying Department:
a. This is a duplicate subdivision name.
b. There are missing lot dimensions.
C. The radius at the street intersection is needed.
d. All easements should be dimensioned so they can be field
located.
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 TDD (970) 224-6002