Loading...
HomeMy WebLinkAboutPOUDRE VALLEY PLAZA PUD - PRELIMINARY - 30-95A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYLand Use Table 2 Trip Generation (Using land uses as submitted by the applicant) Daily Trips Bldg A - Bank - 3500 SF 492 Bldg A - Office - 5500 SF 108 Bldg B - Retail - 4000 SF 163 Bldg B - Office - 4000 SF 79 Bldg C - Restaurant 1232 6000 SF Bldg D - Restaurant 1232 6000 SF Bldg E - Retail - 8600 SF 350 Bldg E - Office - 8600 SF 170 Bldg F - Retail - 8000 SF 325 Bldg F - Office - 8000 SF 156 Bldg G - Townhome - 7 DU 41 Bldg G - Retail - 6000 SF 244 TOTAL 4594 s A.M. Peak P.M. Peak Trips Trips Trips Trips in out in out 12 5 27 34 13 1 3 12 3 2 11 8 9 1 2 9 47 47 53 45 47 47 53 45 5 6 24 18 20 2 4 19 5 5 22 18 19 3 3 18 1 2 3 1 4 4 16 13 185 125 221 240 Table 1 Trip Generation (From the Site Access Study) Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out Bldg A - Bank - 3500 SF 492 12 5 27 34 Bldg A - Office - 5500 SF 108 13 1 3 12 Bldg B - Retail - 3000 SF 122 2 2 8 7 Bldg B - Office - 3000 SF 59 7 1 1 7 Bldg C - Retail - 3000 SF 122 2 2 8 7 Bldg C - Office - 3000 SF 59 7 1 1 7 Bldg D - Restaurant 1232 47 47 53 45 6000 SF Bldg E - Retail - 8600 SF 350 5 6 24 18 Bldg E - Office - 8600 SF 170 20 2 4 19 Bldg F - Retail - 8000 SF 325 5 5 22 18 Bldg F - Office - 8000 SF 158 19 3 3 18 Bldg G- Townhome - 7 DU 41 1 2 3 1 Bldg G - Retail - 9600 SF 390 6 6 27 20 TOTAL 3628 146 83 184 213 co o MEMORANDUM co To: Linda Jackson, Shields Street Investors, LLC o Jim Sell,.Jim Sell Design Q Fort Collins Staff O o From: Matt De 1 ich ' M SDate: July 31, 1995 LU Subject: Addendum to the Poudre Valley Plaza Site Access Study (File: 9538MEM1) w D z This memorandum serves as an addendum to the Poudre > Valley Plaza Site Access Study and a response to "traffic a related" comments provided by Fort Collins staff. z a z The land uses in the site access study are slightly m different than the uses shown on the site plan as submitted M by Jim Sell Design. This occasionally happens when changes M occur to the site plan after the site access study was completed. Table 1 shows the trip generation from the site access.study. Table 2 shows the trip generation from the land uses on the submitted site plan. The changes occur in buildings B, C, and G. The changes cause increases in the generated trips as follows: Daily - 966 trip ends Morning peak hour - 83 trip ends Afternoon peak hour - 70 trip ends The increased trip generation causes changes in the site generated traffic assignment at the key intersections. The traffic increases do not cause a significant change in the operation of the key intersections. Delay will change Z Q slightly, but the level of service categories remain the same UJ as that indicated in the site access study. z The primary comment pertaining to the site access study W is from the Transportation Department: "Right -turn lanes are needed from Horsetooth Road (eastbound lane) into Century Drive and from Shields Street (northbound lane) into Arbor = o Drive." The need for these turn lanes (as well as other turn c-2 a lanes) was analyzed using criteria in the "Intersection W Channelization Design Guide," NCHRPR 279, TRB, 1985, Pg. 63- o a 65. Using these criteria, the above through and right -turn Z volumes do not warrant full width deceleration lane. A taper -� cc and increased radius will allow right -turning vehicles to enter the taper slowing to 15 mph to make the turn. If City 3 requires the aforementioned lanes, then they should be as W LL follows: the requested right -turn lane on Horsetooth Road = � a °` approaching Century Drive should be a continuous lane between PP g Y �-- the right-in/right-out access and Century Drive; and the Q requested right -turn lane on Shields Street approaching Arbor Drive should be 310 feet, including taper.