HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUND OF REVIEW 8 - 31-95E - CORRESPONDENCE - CITY STAFF (3)5. Natural Resources Department
14. The letter discussed in Doug's comment was sent and I believe this issue has been
resolved.
15. The noted related to the sign has been removed from the Site and Landscape
Plan.
Hopefully this addresses all of the outstanding issues related to the submittal. Please review the
enclosed information and should you have any questions, feel free to give me a call.
Sincerely,
,LC
Cc: Tom Kennedy, Bill Yunker, Lucia Liley, Brian Shear, Hearthfire 2 Submittal
19. The landscaped berm has been modified in Tract E to completely remove any
landscaping from lot 1.
20. Copies of your red -lined plan are included in this resubmittal.
- Note the following items address your comments on the red -lined Site and
Landscape Plan.
a. the plant count has been revised to show 5-QG-2" cal. in the NW corner.
b. CR 13 annexation note has been revised.
c. the 20' wide crushed limestone trail is currently installed.
d. spelling errors have been corrected.
e. storm sewer profiles A, B, C, and D have been removed.
f. the wetland mitigation areas are shown on sheet 2 of 2.
g. the arrows on the bottom of the page have been moved and are pointing
to the Tumstone Lane ROW.
h. all non -legible notes have been either enlarged or removed if not needed.
i. The landscaped berm has been modified in Tract E to completely
remove
any landscaping from lot 1.
2. Engineering
1. & 5. Lucia Liley and Janelle Kechter of March, Liley and Olive have been
preparing all of the required easement documents and will submit them to
engineering for review prior to signatures by the owners. We understand that all
required easements must be signed and sent to the City prior to the project being
scheduled before the P & Z Board. Note: See attached letter from March, Liley
and Olive. Also enclosed is a copy of the recorded Lot 47-drainage easement
referenced in Ms. Wamhoffs comments.
2. & 6. We understand that the Douglas Road issues must be resolved prior to the
project being scheduled before the P & Z Board. Sherri Wamhoff has been
working with the Developer, Cam McNair and Matt Baker on resolving any
outstanding issues.
3. Stormwater
1. & 3. Lucia Liley and Janelle Kechter of March, Liley and Olive have been
preparing all of the required easement documents and will submit them to
engineering for review prior to signatures by the owners. We understand that all
required easements must be signed and sent to the City prior to the project being
scheduled before the P & Z Board. Note: See attached letter from March, Liley
and Olive.
3. The two -rail fence is to be installed by the developer at on the side yard property
lines of lots 25 and 26. This is a landscape element and because it is a open rail
style fence and out of the limits of the drainage easement. We do not believe that
it will affect the storm drainage in the area.
4. Technical Services (Mapping)
22. b. Town Center Way has been changed to Tumstone Lane and this was approved
by Current Planning on July 26, 2001.
22. c. The North County Road 13 annexation has not yet been processed by the City.
(See attached letter from March, Liley and Olive).
22. d. Lot 1 has a restriction that any home must be a minimum of 150' from any
existing oil well. The setbacks for this lot conform to this 150' requirement.
riN�CREST
September 28, 2001
Mr. Steve Olt
City of Fort Collins Planning Department
P.O. Box 580
281 N. College Ave
Fort Collins, Colorado 80522-0580
RE: Hearthfire P.U.D., 2Id Filing, Final, #31-95E
Resubmittal - Response Letter
Dear Steve:
Enclosed please find eight (8) copies of the revised Final Site and Landscape Plan as well as five
(5) copies of the revised Final Utility Plans as prepared by Shear Engineering Corporation, one
(1) copy of the revised Drainage Report, and six (6) copies of the revised Final Plat as prepared
by Fredrick Land Surveying for the Hearthfire P.U.D., Second Filing, Final. (As well as the
redlined prints from your last set of referral comments.) Note: also attached is one (1) copy of the
engineering response letter from Shear Engineering Corporation and the Revisions Routing Sheet
from Current Planning.
This is a response to the most recent review comments concerning the Final Site and Landscape
Plan, Final Utility Plans and Final Plat for the Hearthfire P.U.D., Second Filing. This response
will address some of the comments from the Current Planning, Natural Resources Planner,
Engineering, and Mapping, as noted in your letter and the Project Comment Sheets dated July 3,
2001. Shear Engineering Corporation has written separate letters to Engineering and Stormwater
to address their specific comments as well as the engineering and plat related comments from the
other departments. Copies of those letters are included in this resubmittal. Also, for your
information, Lucia Liley has been working directly with Bill Fischer and Paul Eckman on the
preparation of the required offsite drainage easements from the Water Supply and Storage
Company (see attached letter from Lucia Liley addressing all of the outstanding easements issues
and the annexation of the CR 13 ROW). We understand that these offsite easements must be
completed and signed prior to the Planning and Zoning Board hearing as well as the issues
regarding the final design of Douglas Road.
1. Current Planning (Note that you and I had discussed all of these issues in our
meeting of September 17d ).
16. The note on the Site and Landscape Plan has been revised to state that the
developer is responsible for the installation of this fence at the time of development.
17. Town Center Way has been changed to Tumstone Lane and this street name was
approved by Current Planning on July 26, 2001. A memo was sent to you at that
time.
18. The North County Road 13 annexation has not yet been processed by the City.
(See attached letter from March, Liley and Olive). Also the note on the Site and
Landscape Plan related to the annexation has been revised.
NA""i>"g & Desis» LLC
4225 Westshore Way Fort Collins, CO 80525
(970) 226-1655 • (970) 226-1635 fax