HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS - MAJOR AMENDMENT - 32-98C - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYTable 2
Trip Generation
(With Updated Floor Areas)
Daily
A.M.
Peak
P.M.
Peak
Land Use
Trips
Trips
Trips
Trips
Trips
in
out
in
out
INITIAL PHASE
Medical Office - 122 KSF
4408
237
59
120
326
Hospital - 85.8 KSF
1440
61
22
19
60
Subtotal
5848
298
81
139
386
FUTURE PHASE
Medical Office - 140 KSF
5058
272
68
139
379
Hospital - 260 KSF
4363
184
68
67
182
Health Club - 70 KSF
1200
51(1)
51
64(1)
64
- +20 KSF (3)
Rehab/Alt. Medicine -.50 KSF
1807
97
25
49
134
Day Care - 10 KSF
793
67
60
62
70
Assisted Living - 180 Units.
387
7
4
17
14
Elderly Detached - 91 Units
210(2)
7
12
13
8
Suites Hotel - 75 Rooms
468
24
12
17
24
Subtotal
14,286
709
300
428
870
TOTAL
20,134
1007
381
567
1256
(1) Assumed directional split
(2) Assumes PM = 10% of Daily
(3) Another 20 KSF used only rehabilitation/alternative medicine
APPENDIX A
MEMORANDUM
Co
co
LO
o
CD
o
TO: Angie Milewski, BHA Design
•
LO
City of Fort Collins Staff
O
0
6
CD
a
°C
CD
FROM: Matt Delich
0
O
U
DATE: September 7, 1999
•
z
X
LL
SUBJECT: PVH Harmony Campus - Radiation/Oncology Addition
(File: 9817ME06)
w
O
J
This memorandum documents the trip generation for the
CD
N
Radiation/Oncology Addition to the PVH Harmony Campus. This facility
>
Q
a)
is proposed to be located on the north side of the medical office
0
building that is currently approved. This facility will be used to
w
CDprovide
radiation treatment of cancer patients and to evaluate new
a
patients.
2
w
z
There will be 16 full time employees with two of these being
0
o
physicians. According to information supplied by the physicians, 35-
40 patients per day will be seen for treatment (4/hour) plus 6 new
Cn
patients for evaluation (spread over the entire day). This would
N
result in approximately 140 trip ends per day, using 2 trip ends per
patient and 3 trip ends per employee. Using the medical/dental
ITE
office building use (Code 720) from Trip Generation, 6th Edition,
results in the following, using number of employees as the trip
generation variable:
143 daily trip ends
8 morning peak hour trip ends
17 afternoon peak hour trip ends
It would appear that on a daily basis, use of the ITE reference
reasonably reflects the expected trip generation for this facility.
Appendix A shows the trip generation from the PVH Harmony
a
z
Campus as documented in the traffic study and subsequent memoranda.
^
W
The Radiation/Oncology Addition will increase the trip generation of
z
the initial phase of development by 2-3% on a daily and peak hour
(.%
basis. The Radiation/Oncology Addition will increase the trip
J
z
W
generation of full development by less than 1% on a daily and peak
o
hour basis.
W
0
~
It is concluded that the increase in trip generation due to the
p
Radiation/Oncology Addition will not significantly impact the
7
W
operation of the key intersections. Additional evaluation was deemed
a
to not be necessary.
¢
W
�
LL
QC
~
G