HomeMy WebLinkAboutPVH HEALTH SYSTEM, HARMONY CAMPUS, 2ND FILING, INFRASTRUCTURE - PDP - 32-98D - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: f?U" F'c��MorovY.., T �,C_Y!Ye Date:
Planner r^ a+j e� Traffic Operations: Engineer.
Items RequElsted
Redlinedems Being Keturned
`7
0
_
16
a
N
m
a
Q
Other Items Required
q
°L_'
�
N
c "
1
Other Items being
Returned
Engineering
Stormwater
✓
'�
Water/Wastewater/FCLWD
Traffic Operations
Transportation Planning
Transfort
Engineering Pvmt.
Light & Power
Y
r
Technical Services
PFA
( PJ e_r
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET --F-pvvA 2
ITEM:
DATE RECEIVED: - '>
°;
F
-`�
G
C
<
w
a
'
�
< a
z
<
5
a z
Wa
= z
G
¢
F
o Z
F
Z
w
z
J
FILE: PROJECT PLANNER
ZONING
BUILDING INSPECTION
FORESTRY
POLICE - JOE GERDOM
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
QWEST
XCELENERGY
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
NATURAL RESOURCES
PARK PLANNING
TOTAL
/