HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS - ODP - 32-98 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: P61-%E& Date: /3 196
Planner: i� Tr4c Operations. a
Wneer: -ntA a D n
ingineering
Stormwater
Water/Wastewate
Tragic Operations
Site land
Items Requested
Plat UtilityI Drainage Rpt
Other Items Required
�DY
SOP
Site
Redlined
land
Items Being Returned
Plat I Utility Drainage Rpt I Other Items Being Returned
cfr
ov
trans. Planning
Tran*rt
'arn+aa; s�aT
Natural Resources
Park Planning
itals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
r
Project: RX... Vqua-y , 6y, s - 06P
Planner: i�p$ acAp4ciralficOperatiom:
Engineer:
Items Requested
Site Land Plat Utility Drainage Rpt Other Items
�v-
2 I otP
Operations
Planning
tural Resources
rk Planning
itak
Other:
Note: All redlined items should be returned with the resubmittaV recisions.
Date: ' 1 /3 /Cie
Redlined Items Being Returned
Site I land I Plat I Utility I wovr
Other Items
a�
c'zvir ayT
Returned
6".
Revisions Routing I
all
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
mm
....-
•
.
.
.
No
.
.
.
.
.
.
.
IN
BUILDING •
..-.........-
m=lffW"fAWw
............-
•
........�.m
FCLWIXELCOIBOXELDER
-.--------.--
•
.
....
..
.
.
.
..-
ADVANCE
.
.
.
.
.
..
.....-
R.O.W.
.......
�....
NVATER CONSERNATION.......s....�
POST OFFICE
.....
......�
.....�......
PUBLIC SERVICE
....
.......=
SCHOOLS:• . 1 •E /TIIOMPSON....
�..CABLE
....
TV
STATE 1
........
�.....
1 ..
..........ON
RAILROAD: . , :
..........mm
• . 1 . ..
..........ON
......Now
mm..
..........mm
iiiiismmm
mm�
iiiiii�
..
m...o..
IN