Project name at conceptual review: "Townscluare Apartments".
DEVELOPMENT SCHEDULE
Construction is anticipated for spring, 1998 for the first two structures to the west.
Completion would be within six months of the start of construction. The balance of
structures would be constructed based on market acceptability.
HAZARDOUS MATERIAL IMPACT ANALYSIS
There shall be no hazardous materials associated with the project.
ENVIRONMENTAL STUDY
There are no wetlands or natural areas associated with the project.
CCD-1.8: The streetscape of the parking/pedestrian circulation area shall
provide a safe and attractive environment for the pedestrian.
CCD-1.14: Project provides a pedestrian link to the Town Square Shopping
Center that utilizes an existing park -like setting that avoids arterial
streets.
CCD-1.16: Project is adjacent to established protected transit stops.
i. Project Description:
The project is 1.24 acres located north of the Town Square Shopping Center on
west Elizabeth at City Park Avenue. The project site is bordered on three sides by
housing geared to CSU students. The project shall provide a transition to the Town
Square center. The site has existing asphalt that is the north access to the center
and to the McDonald's Restaurant drive -up window. The access to these adjoining
uses shall be maintained with the development of the project.
The primary time that traffic backs up from Mcdonald's drive -up is over the lunch
hour. It is during this time that many of the project's occupants shall be "on -
campus" or at places of employment. Therefore it is not considered a conflict or
hazard. Certainly from time -to -time there shall be inconvenience, however that is to
be expected and accepted with an urban setting. The proximity of the project -
and subsequent convenience - far outweighs the minor accommodations that may
have to be made.
The project does not contain any wetlands or natural areas. Existing landscaping
shall be maintained and increased with the development.
iii. The project shall be developed as condominium units as part of a home -owners'
association that shall be responsible for the maintenance of the buildings and the
grounds.
iv. NA.
V. The project layout has been largely dictated by the existing traffic patterns and
uses that must be maintained. Because the site is long and narrow, it became
obvious that the building layout must be linear. There is a steep slope to the north
that required that the first level be designed as a basement walk -out in order to
accommodate handicapped accessibility/adaptability on the ground floor.
vi. NA
vii The site has no wetlands. The site has no natural areas.
viii. A neighborhood meeting is pending.
CAD-1.5: Street lighting shall be with fixtures that have a compatible historic
motif.
CAD-4: Project is designed for security issues. Visual access from
neighbors is available on all sides.
HSG-1.1: Project has higher density near public transportation, shopping,
employment and service centers, and CSU.
HSG-2: Project shall have densities that the unit costs could qualify for
affordable housing.
HSG-3.1: Project compliments the surrounding stable residential
neighborhood.
ENV-1:
Project location promotes pedestrian and bicycle access; therefore
the project complies with the City air quality objectives.
ENV-2:
Project shall have recycling containers in the dumpster locations.
ENV-3.3:
Project landscaping utilizes ground covers that reduce water
consumption.
ENV-4:
Project utilizes solar orientation.
ENV-7:
Project improves the flood control in a historically difficult area.
Adjoining buildings shall have more protection as a result of the
project.
NOL-1:
Project does not deplete any recognized natural habitat or
ecosystem.
NOL-3:
Project provides sidewalk gathering places enhanced with seat -
walls and landscaping.
GM-1:
Project does not impact boundary growth management issues.
GM-5:
Project takes advantage of existing infrastructure improvements.
GM-6:
By the time it's done, rest assured, the project shall pay its fair
share of the cost of growth.
GM-7:
This is a private development of a Community Commercial District
GM-8:
Project represents a compatible infill development within the
Community Growth Management Area Boundary. Special incentives
have not been identified.
MMN-1:
Project overall density is 21 dwelling units/acre which exceeds the
minimum average density of 12 DU/A.
MMN-2:
Project provides a transition link between the surrounding
neighborhood and the Town Square Shopping Center. Project shall
continue to provide the access to the McDonald's drive -up window.
MMN-3:
Project relates to and links with the existing Town Square Shopping
Center. The buildings are two story with basement walk -out and
there are central gathering places incorporated in the design. The
project is adjacent to existing transit stops.
CCD-1:
Project provides higher density housing. The physical environment
will promote walking, bicycling, transit and ridesharing. The
convenience to adjoining shopping, entertainment, and service
facilities shall provide a high quality urban life-style.
October 28, 1997
STATEMENT OF PLANNING OBJECTIVES
The Lofts at Campus West
816 City Park Avenue
Fort Collins, Colorado
SUMMARY:
The Lofts at Campus West ("Project') is a higher density infill housing project intended
for students attending Colorado State University. The project is designed in a
San Francisco/ Neo-Victorian style with lofts "nested" with the next floor to provide a
unique approach to student housing.
i. City Plan Principles and Policies achieved:
LU-1:
Project achieves growth within the city on established pedestrian
and transit systems.
LU-2.1:
Project compatibly adds to neighborhood, creates an identifiable
place, and achieves compact development.
LU-2.2:
Project contributes positively to neighborhood.
LU-3:
Project is compatible with designated land use.
LU-4:
Project shall be reviewed by the West Central Neighborhood.
T-2:
Project is adjacent to established transit systems and is located
close to shopping, entertainment establishments, and campus that
will encourage pedestrian access.
T-4:
As per T-2, bicycle access shall be encouraged by the location and
design of the project. Bicycle racks shall be provided.
T-5:
Project has a direct pedestrian access to Town Square Shopping
Center and adjoining business uses, churches, entertainment, and
CSU.
T-6: Project has a enhanced pedestrian link to the Town Square
Shopping Center.
T-7: Project has wide walks, bench seats and landscaping to enhance
pedestrian network.
T-8: Pedestrian walks shall be well lit with fixtures that have a
compatible historic motif.
T-9: Project provides 48 standard and 8 handicapped parking spaces
This exceeds the 48 standard and 2 handicapped parking spaces
required.
CAD-1.3: The parking lot has been treated as a visually appealing
11steetscape" with landscaping, seat -walls, and wider walks that
have an additional 24" buffer strip from the adjoining parking.
CAD-1.4: Street trees for the project have a formal appearance that will
create a canopy. Existing trees shall be preserved.