HomeMy WebLinkAbout401 WEST MOUNTAIN AVENUE - PDP - 29-98 - CORRESPONDENCE - REVISIONSStormwater:
12. and 13. Our Civil Engineer coordinated these comments with Basil and he is o.k. with
allowing this project to go ahead for approval. These items will be addressed at
Final Compliance.
Transportation Planning:
14. and 15. Kathleen Reavis is o.k. with the walkway issue and has confirmed that the
diagonal parking on Meldrum is acceptable with Suzanne Edminster.
If you have any questions regarding the revisions or these comments, please
call.
Sincerely,
VF RIPLEY ASSOCIATES, Inc.
Cathy Mathis
October 13, 1998
e
Mike Ludwig
Planning Department
281 North College Avenue
V F R I P L E Y
Fort Collins, CO 80524
ASSOCIATES INC.
Landscape Architecture
Re: Response to comments:
urban Design
401 West Mountain PDP
Planning
Dear Mike:
I I I i Stoney Hill Unve
Fort Collins. Colorado 80525
PHONE (970) 224-5828
We have reviewed your e-mail at have the following comments:
FAX (9701 224-1662
Zoning:
1. The transformer has been relocated towards the southwest corner of the site due to
power coming in to the site from the alley and an easement through Ulrich's. Light
and Power has approved this location. The trash enclosure size will remain the
same to allow for an additional dumpster, if needed, and/or recycling facilities.
2. The note was already in the Land Use Statistics, but we re -worded it to match
exactly as your comment.
Current Planning:
3. Dimensions have been added to the sidewalks and other areas as requested.
4. No fences or walls surrounding the outdoor dining patios are planned at this time
due to the fact that we are not sure if the restaurant will require a fence. At the
time that the need is determined, we will submit a Minor Amendment.
5. O.K., we changed it.
6. O.K., the interior layout has been deleted.
7. This has been changed.
8. The height and location of the utility meters cannot be changed. The electric
company determines how high the meters are placed (6' high is preferred.) The
location cannot be moved because there is no other blank wall on the building. This
is the logical location because it is at the back of the building and there is a low wall
in front of it. Shrubs and multi -trunk ornamental trees will screen the meters. The
architect is attempting to make the height and spacing of these meters consistent.
The conduits could be painted in a color to match the building.
Engineering:
9. An Encroachment Permit has been submitted. Any fees assessed are
acknowledged.
10. Elevations of these elements were provided. Construction details will be provided
at Final Compliance.
11. Curb and gutter removals will be coordinated at time of construction.