Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 19 - FDP - 28-98F - CORRESPONDENCE - (4)FINAL PLAN ROUTING SHEET Item: This The 1va.v"aLA5 aava. aanw au.... V..... ......— r.. J---. A final fee of $1,000.00 is required at the time 4submittal less otherwise waived or reduced. Fee Waiver A royal: Planner: / Engineer: 0 Items Requested Advance Planning Building Inspection Engineering man Street Oversizm*g Technical Services Water & Wastewater thsalm MEMNON Water Conservation Ditch Co.: Schools: Poudre Thompson OMEN I I' Ito 61 Ca but e�? 7 Ul�lrr�! ivtj't'�ewgpa Steve Olt RE: Lot 19, Holsinger Drywall Page 3; Donald Brookshire A Design Collaborative 552 Kinnikinnik Ct. Windsor, CO 80550 phone (970)218-1132 fax (970)206-0183 e-mail <mailto:eastpoint(a)frii.com> eastpoint(abfrii.com Steve Olt - RE: Lot 19, Holsinger Drywall Page 2 following that. Please remember to schedule a submittal appointment with Sandy, Doreen, or Mary Jane in Neighborhood & Building Services, at 221-6760. Thanks, Steve >>> Randy Maizland 03/01/2007 8:17 AM >>> Hello Don, As far as I can tell, you are basically ready for mylar however, You will need to make one FCP submittal package to be routed to all of the potential reviewers and I will get with Steve to complete a routing sheet for you. I was the only one that recieved a revised copy of the Utility Plan prior to the hearing and that was only for reference for that hearing. There may also be easements that need to be recorded before approving the plans ? The Transportation Development review Fee still applies as we still need to do at least one round of FCP review + the mylar review and prepare a development agreement. Steve, I am leaving at noon today and off tomorrow to get a Lasik procedure done on my eyes. Can we meet and fill out the routing sheet before noon today ? Thank you, Randy >>> Steve Olt 2/28/2007 2:21 PM >>> Don, I have been out of my office, on vacation, from February 16th until today, February 28th. I have to talk to Randy Maizland about his submittal requirements and then we can get you the Final Plan Routing Sheet and requirements. Randy is not in his office at the moment. Steve >>> "Don Brookshire" <eastooint(d,)frii.com> 02/26/2007 10:53 AM >>> Steve, I have not heard anything about what is needed for FDP to Proceed to Mylar. We have all the drawings and everything ready, and they have been ready since our Public Hearing. We need to know if engineering is going to need a full review, if we need to pay for the TDR fee, and the number of copies to submit for routing. Thanks Steve Olt - RE: Lot. 19, Holsinger Drywall Page 1 From: Steve Olt To: Don Brookshire Date: 03/01/2007 3:38:12 PM Subject: RE: Lot 19, Holsinger Drywall, Don, I appreciate your reminder about our position on the Current Planning fee of $1,000.00 for Final Plan review. We will waive that fee with your Final Plan submittal. You are still, however, subject to the Transportation Development Review Fee of $1,215.00 to be paid to the Engineering Department. The submittal requirements as indicated on the FINAL PLAN ROUTING SHEET that was sent to you still apply. Steve >>> "Don Brookshire" <eastpoint@frii.com> 03/01/2007 2:46 PM >>> Thanks Steve, You said at our hearing there would not be a The for Planning and that we were ready for Mylar. Has this changed? Thanks -----Original Message ----- From: Steve Olt fmailto:SOLT(a)fcgov.coml Sent: Thursday, March 01, 2007 10:30 AM To: Randy Maizland; Don Brookshire Cc: Cameron Gloss; Sheri Langenberger Subject: Re: Lot 19, Holsinger Drywall, Don, Randy and I did talk this morning and arrived at the following submittal requirements for the Prospect Industrial Park, Lot 19 (Holsinger Drywall) - Final Plan review: * Application Form * Fees: Current Planning ........................... $1,000.00 Transportation Development Review ... $1,215.00 (includes $215 shortage from PDP) * Site/Landscape Plan (previously combined) .... 7 copies * Subdivision Replat................................. 6 copies * Building Elevations ................................. 2 copies * Utility Plans .......................................... 5 sets * Drainage Report .................................... 3 copies * TIA Update .......................................... 3 copies (unless waived by Traffic/Transportation) * 2 Off -site Easements ............................... 1 copy each, with Reception #'s from Larimer County These are the numbers of paper copies of each document we need. We will do an initial 3-week round of Final Plan review and, hopefully, ask for mylars