Loading...
HomeMy WebLinkAboutPOUDRE RIVER BUSINESS PARK 2ND FILING PDP - FINAL PLAT REVIEW - 24-99 - CORRESPONDENCE - (6)areas with the a plan clearly identifying the extent and location of all plant material and landscape features. Please note LUC requirement that trees be planted every.25' between parking lots and the street, and every 40' between parking lots and interior lot lines. It is important to note that upon review of the minutes granting exception to landscape strip setbacks, street tree amount, location and placement are still required to meet Land Use Code standards. d. The burden of demonstrating compliance with all Land Use Code criteria is with the applicant. Prior to formally scheduling a public hearing, a shortened brief round of review is needed to adequately address staffs concerns. To facilitate the complete re - submittal of the application including redlined plans with supplemental materials, please have your project manager contact Ginger Dodge and/or Voneen Macklin of the Current Planning Department at 970.221.6750. Please contact me at 970.221.6750 and/or e-mail:. rfuchs6j)ci.fort-collins.co.us if you should have any questions or concerns related to these comments. Sincerely, A Ronald G. Fuchs City Planner rN DAMy Documents\Planning Document\Poudre River Business Park #24-99\Poudre River Business Plat Comments 3.doc 2 Comm ty Planning and Environmenta: !rvices Current Planning STAFF REVIEW COMMENTS fvtkA 3 July 25, 2000 LHA Partnership 1100 Poudre River Drive Fort Collins, CO 80524 Staff reviewed the re -submittal of the Poudre Business Park Plat dated 6.23.00 and plan dates of 06/23/00 and would like to offer the following comments: COMMENTS: 1. Mapping and Drafting: a. See attached comments- 2. Engineering Department: a. See attached comments. 3. Stormwater Utility Department: a. See attached comments. 4. Water/Wastewater: a. See attached comments 5. Current Planning: a. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by October 24, 2000. A 30-day extension to this deadline is available. Request for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. b. Once again, prior to formal re -submittal, it is pertinent that staff meets with your team to discuss the specific issues raised with the plan sets dated 06.23.00. c. Per sheet 2 of 2 (Landscape Plan) please note LUC Section 3.2.1(E)(4) Parking Lot Perimeter Landscaping addresses the need to screen parking 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020