6. PFA (Ron Gonzales)
71. The emergency access.turnaround has been revised per the last meeting with
Ron Gonzales, Dave Stringer and Shear Engineering.
123. The emergency access turnaround has been revised per the last meeting with, --
Ron Gonzales, Dave Stringer and Shear Engineering.
7. Transportation Planning (Tom_ Reiff)
80. The trail has been moved 20' from the homes.
81: An additional bike rack has been added and it is my understanding that that
handicap parking space issue was. resolved in your meeting with Russ Wells and
Tom Peterson.
87. The 6' wide walk has been moved to the.east side of Robertson Street.
131. The directional ramps were designed with the guidance of Mike Herzig in the
Engineering Department.
8. Technical Services (J.R. Wilson)
139. E. Prospect has been relabeled to rear Road and, not Street.
I believe this addresses all of the outstanding issues related to the Site and Landscape Plans.
Once the City gives approval to these two plans, the utility plans and plat will be revised to,
I
esolve any outstanding issues. Please review the, enclosed information and should' you have any
questions, feel free to give me a call:
Sincerely,
PineCrest Ebitiming and Design LLC
as an
Manager
Enclosures '
Cc: Russ Wells, Mark Corbridge, Brian Shear, Pinnacle Submittal -
January 8, 2002
Mr. Cameron Gloss
City -of Fort Collins Current Planning Director
P.O. Box, 580
281 N. College: Ave
Fort Collins,.Colorado 80522-0580
RE:,Pinnacle Townhomes PDP - Type 1 (LUC), #34-OOA .
Resubmittal - Response Letter to Site and Landscape Plans
Dear Cameron:
As requested in your memo of January Yd, enclosed, please find five (5) copies of.the revised Site
Alan, five (5) copies of the revised Landscape Plan as well as a letter from Tom Peterson
addressing the pedestrian connectivity concerns. 1 believe that the two sets of building elevations
have already been submitted toyou by Russ Wells.
In response to the most recent review comments concerning the Site Plan -and Landscape Plan,
please note the following:..
1.1 Current Planning (Cameron Gloss)
135. Revised rear and side elevations have,been submitted for your review by the
developer.
2. Engineering (Dave Stringer)
109. The emergency access turnaround has been revised per the last meeting with
Ron Gonzales, Dave Stringer and Shear Engineering.
117. The.emergency access turnaround has been revised per the last meeting with
Ron Gonzales, Dave Stringer and Shear Engineering.
1 16. Although the plan on Sheet I is a small scale (1"=100'), she 2 and 3 enlarge
the landscape plan (sheet l) to a scale of l" 30' so that is easier to read. Also, the
plantings in the cul-de-sac have been changed to only one tree and low growing
shrubs.
3. Xcel Energy (Len Hilderbrand)
145. Item noted.
146. Item noted.
147. The 1 1' easement has been revised to 16' wide.
4.. Light & Power (Alan Rutz))
.118. All lights on private drives have been relabeled to floodlights.
5. Natural Resources (Doug Moore)
148. Additional trees and shrubs have. been added along Spring Creek to enhance the
Desig» LLC
4225 Westshore Way Fort Collins, CO 80525
(00) 226-1655 • (970) 226-1635 fax