HomeMy WebLinkAboutPINNACLE TOWNHOMES - PDP - 34-00A - CORRESPONDENCE -73 Issue Contact: Ron Gonzales
Per 97UFC901.4.4, address numerals shall be visible from the street on which
the property fronts with minimum 6-inch numerals on contrasting background.
74 Issue Contact: Ron Gonzales
Per 97UFC901.2.2.2, fire hydrants shall be provided within 300 feet of any
building, and on 600 foot centers thereafter. Shall provide 1500 gpm @ 20 psi
75 Issue Contact: Ron Gonzales
Per 97UFC901.4.5, street names shall be reviewed prior to being put in service
by Planning Dept. & LETA
Police
63 Issue Contact: Joseph Gerdom
Lighting: Insufficient. Need additional lighting in northwest area and between
buildings. Proposed lighting has limited value.
64 Issue Contact: Joseph Gerdom
Landscape: Lower materials (1' - 2') should be used for foundation planting.
Lighting and landscape plans create several potential security/safety problems
(esp. northwest).
Stormwater Utility
52
Issue Contact: Wes Lamarque
Grading:
Please tie-in grading to existing contours around perimeter of site.
Please incorporate new drainage features from water quality detail sheet into all
relevant sheets.
Please show F.F. elevations for each building and corner lot elevations for each
lot and tract. Plat shows that the townhomes will have individual lots.
Please show more spot elevations around buildings and in parking lots to better
clarify grading.
53 Issue Contact: Wes Lamarque
Drainage Plan:
Please show and label size and type of all drainage features on the drainage
plan including, sidewalk chases, swales, storm sewers, curb cuts, etc.
Please show complete basin summary table and water quality pond table on
drainage plan.
Please show basin labels for all basins.
Please provide swale cross -sections and calculations.
8of14
50 Issue Contact: Jeff Hill
Provide insulation over all sanitary sewer mains which have less than 4 feet of
cover. Include a detail and calculation for the insulation.
Zoning
2 Issue Contact: Gary Lopez
1. Bldg. Dimensions or their typicals needed on site plan though bldg.
Envelopes recommended instead of footprints on site plan.
3 Issue Contact: Gary Lopez
2.. Add'I tree required in landscape buffer to the east of 6-space parking south
of 8-plex.
4 Issue Contact: Gary Lopez
3. Gary's note on #1 refers to the 8-plex's, not townhomes.
5 Issue Contact: Gary Lopez
4. HC spaces need direct ramp to sidewalk. Indicate all ramped areas with "R"
6 Issue Contact: Gary Lopez
5. Bicycle racks required for 8-plexes and shown on site plan per no's required
in article 3 of LUC.
7 Issue Contact: Gary Lopez
6. It appears by the plat that the 8-plexs are actually single family attached.
These should be indicated as such throughout documents.
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
CAMERON GLOSS
City Planner
14 of 14
Water Wastewater
40
41
42
43
44
45
46
47
48
49
Issue Contact: Jeff Hill
Show all water and sewer lines on the landscape plans.
Issue Contact: Jeff Hill
Coordinate landscape design with the civil design and provide the required
landscape/utility separation distances.
Issue Contact: Jeff Hill
Provide utility easements for all fire hydrants, water/sewer mains, curb stops,
etc.
Issue Contact: Jeff Hill
Indicate sizes of all services including irrigation taps. Show and label all curb
stops and meter pits.
Issue Contact: Jeff Hill
No PVC water main pipe is allowed in our system.
Issue Contact: Jeff Hill
Realign the water and sewer main layout in order to keep sanitary sewer
manhole locations on the center line of the streets.
Issue Contact: Jeff Hill
Provide a means of access to the existing sanitary sewer manholes located to
the south of this development.
Issue Contact: Jeff Hill
Include a note to core drill the new opening into the existing sanitary sewer
manhole and to reshape the bench of the existing manhole to direct flow
through the manhole.
Issue Contact: Jeff Hill
Provide an air relief valve or fire hydrant at the high point of the water main in
Robertson Street.
Issue Contact: Jeff Hill
Provide a complete design of the water main lowering at Robertson Street and
Prospect.
13 of 14
80 Issue Contact: Tom Reiff
The main trail connection from Robertson Street to Spring Creek Trail needs to
be designed more for the general public use. The 8 foot concrete walk should
be extended an additional 10 feet minimum from the front of the homes (# 48
thru 51). See red lines
81 Issue Contact: Tom Reiff
Locate and label bike racks for units without garages (i.e. 8 plexes)
82 Issue Contact: Tom Reiff
Refer to the transit stop design manual for proper design and required and
recommended amenities.
83 Issue Contact: Tom Reiff
Show and label all necessary handicap ramps.
84 Issue Contact: Tom Reiff
Need to provide a cross section of Prospect Rd.
85 Issue Contact: Tom Reiff
Minimum six foot walks are required where cars overhang sidewalks.
i
86 Issue Contact: Tom Reiff
Units #52 and 53 need a 4.5 foot sidewalk connection from the front of the
dwelling unit out to Meadowlark Lane.
87 Issue Contact. Tom Reiff
Increase the sidewalk width along the west side of Robertson St. to 6 feet to
accommodate the higher pedestrian traffic.
88 Issue Contact: Tom Reiff
Proposed development is located within the walking area for Lesher Jr. High,
Harris Bilingual Elem. and Laurel Elem. Schools. The project needs to address
how students will safely access the schools from the site and surrounding land
uses.
Water Conservation
Ok.
12of14
Issue Contact. Laurie D'Audney
62
65
Issue Contact: Wes Lamarque
Erosion/Sediment Control Comments
It is preferable that City Standard Erosion Control Notes be on the erosion
control plan, and.that other notes (e.g. # 8, 9, & 10 of your general notes), be
combined with them.
Why is the swale and water quality pond outside the limits of the silt fencing,
and why is there no BMP in evidence protecting Spring Creek from their
construction? Also, where are the contours on these constuctions?
Why does the report state that silt fence is to be installed "slightly north of Dry
Creek"? Will doing that help keep sediments from leaving this project?
Your Note # 10 - Why are the flat areas to be hydroseeded and hydromulched
instead of the preferred drill seeding? And why are the slopes to be
mechanically seeded? And why is straw mulch to be applied at a rate double
what is required to smother all seeds planted? Why is the seeding rate to be
double that used in field planting?
What is a "Natural Grass" lined swale?
Where are the calculations?
Where is the schedule?
Your surety estimate includes revegetation/mulching costs far greater than
those in the City revegetation bid. Your developer will pay a significantly lower
surety if you utilize City approved costs.
Why are straw bales noted for use in the report but not shown on the plan?
Issue Contact: Wes Lamarque
Quantity detention is required for this site even with it being next to Spring
Creek. If it can be proven that the drainage from this site beats the peak and
there is adequate capacity downstream, than quantity detention may not be
required.
Issue Contact: Wes Lamarque
Please provide drainage easements for all drainage features on plat.
Transportation Planning
79
Issue Contact: Tom Reiff
Interior roads and Prospect Ave. need to be constructed to the new Larimer
Urban area Standards, including directional ramps.
11 of 14
A
61
Issue Contact: Wes Lamarque
Floodplain Comments:
There is concern about the existing condition survey used to design the site. The topography and the
stream alignment do not match the Spring Creek floodplain work map. In addition, the corrected
effective floodway is shown on the utility plans as crossing the top of bank of Spring Creek. This is
of concern because floodplain and floodway limits have been transposed from the floodplain work
map to the utility plans leading to an inaccurate representation of the fl000dplain on the utility plans.
Please verify the survey data for the site and obtain additional survey data in the vicinity of the creek
if needed. Also, please provide a map showing the survey points used to develop the contours. If it
is determined that the survey data is the most accurate information, then a revised
floodplain/floodway analysis will be needed based on the new survey data. The revised
floodplain/floodway limits will need to be consistent with the information used for the site design.
Table 4 and 5 show a different water surface elevation for cross-section 10968. The corrected
effective model and the floodway model also report a different water surface elevation for this cross-
section. Please determine why these two scenarios show a different water surface elevation given
that they should be the same model and revise as necessary.
Please use encroachment method 10 for the final floodway run
Please add a note to the text of the report stating the floodplain and floodway determined from this
report apply only to the Pinnacle PDP. Property owners wanting to know floodplain and floodway
data for this area should contact the City.
The report states that the vertical datum for these maps was assumed to be NGVD 1929. Please
verify this is the datum that was used for the flooplain analysis. Also, please verify that the same
datum was used for the survey of the site.
There are locations were the corrected effective half -foot floodway is within the effective one -foot
floodway. This does not make intuitive sense. Please revise the corrected effective floodway to at
minimum be outside the effective floodway.
It appears the floodplain and floodway shown on the plat does not match the floodplain and
floodway developed from the floodplain report. Please verify the floodplain and floodway shown on
the plat with the report. Please state the title, date, and author on the utility plans and plat for the
report that generated the floodplain.
The drainage plans show a water quality pond within the corrected effective floodway. Water
quality ponds are only permitted within the floodway, if the proposed grading is below the existing
ground. Please show the proposed grading for the water quality pond and revise if necessary.
Please indicate the lines for the effective floodplain and floodway on the corrected effective map
Issue Contact: Wes Lamarque
Please provide street calculations for actual flows for the site to compare with
capacities.
10 of 14
54
55
56
57
59
Issue Contact: Wes Lamarque
Please provide riprap, riprap detail if needed and calculations to verify.
Issue Contact: Wes Lamarque
Please provide storm sewer plan and profiles and calculations.
Issue Contact: Wes Lamarque
Please provide a spillway to pass the 100-year flow from the site, show on
plans and provide calculations in the report.
Issue Contact: Wes Lamarque
Please provide a stage -storage rating curve for the water quality pond and
calculate WQ surface elevation. Show on plans and details all relevant
elevations.
Issue Contact: Wes Lamarque
Please provide water quality outlet structure calculations in the report.
Issue Contact: Wes Lamarque
Please provide historic and more detailed developed hydrology calculations in
the report and more detail time of concentration calculations.
9of14
Natural Resources
77 Issue Contact: Doug Moore
Preble's Mouse Survey -
The Preble's Mouse Survey that was included with this last submittal
expired on August 8, 2001. The U.S. Fish and Wildlife Service requires
that the survey and permits are only valid for 1 year. The City of Fort
Collins Land Use Code requires proof of compliance to applicable state,
county, and federal environmental regulations. 3.4.1(0)(2)
78 Issue Contact: Doug Moore
Buffer Zone Performance Standards are not being meet -
Natural habitat or features buffer may be modified but the performance
standards subsection of the Land Use Code must be met. 3.4.1(D)
89 Issue Contact: Doug Moore
Recommended Buffer Less Than 80%-Requires Planning & Zoning Board
Approval
• The recommended Natural Habitats & Features Buffer is proposed at
75.5% of the minimum general buffer distance recommended for the
buffer adjacent to Spring Creek and will need to be reviewed by the
Planning and Zoning Board as defined in Section 2.1.1 of the Land Use
Code. 3.4.1(E)(3)
Park Planning
100 Issue Contact: Craig Foreman
Construction of the Spring Creek Trail connection needs to include
warning/safety about construction near the trail
101 Issue Contact. Craig Foreman
Contact Park Maintenance 24 hours prior to start of work- 221-6660
PFA
71 Issue Contact. Ron Gonzales
In accordance w/FCLUC3.6.2(C), Meadowlands Lane shall terminate at both
ends with a turnaround having proper dimensions.
72 Issue Contact: Ron Gonzales
In accordance w/FCLUC3.6.2(J)1, public alleys in residential subdivisions shall
only be permitted on a narrow residential local street, which Meadowlands Lane
is not.
7of14
Forestry
95 Issue Contact: Tim Buchanan
Red Sunset Maple/Autumn Purple Ash as Street Trees
These are street trees, but need to be changed to another species because
they are not the Approved Street Tree List. The applicant needs to
select species from the street tree list (see attached)
96 Issue Contact: Tim Buchanan
Red Sunset Maple Not Appropriate
The City Forester also does not recommend that Red Sunset Maple be used in
Fort Collins due to our soils and climate. It will not survive or thrive. The
recommendation is not to use Red Sunset Maple anywhere on this project.
97 Issue Contact: Tim Buchanan
Add the attached Tree Protection Standards and Specifications
Light & Power
102
103
Tract "B" also needs to be a utility easement
Issue Contact. Doug Martine
Issue Contact. Doug Martine
Electric System to serve Lots 36-39 and 48-53 will be along the south side of
the alley (in the easement)
There may be conflicts with utilities. Light and Power will provide an electric
system design for a deposit of $50 per lot which would be credited to the
electric development charges a the time the development occurs (assuming no
substantial changes to the preliminary site plan)
104 Issue Contact: Doug Martine
After the electric system preliminary design is prepared, a utility coordination
meeting is recommended.
105 Issue Contact: Doug Martine
It is assumed that electric heat will not be used in any of these units. If electric
heat is to be used, transformers will be Pad type between the walk and curb.
106 Issue Contact: Doug Martine
Electric meters will need to be'ganged' at one location on each building
107 Issue Contact: Doug Martine
Street Trees along Dedicated Streets
Must be a minimum of 40 feet from street lights. A streetlight plan will be
incluced as part of the preliminary electric plan (above). The planned
streetlights must then be shown on the landscape plan.
6of14
32
33
34
35
36
37
38
39
rL
Issue Contact: Dave Stringer
Show r.o.w. widths on plat for Robertson from intersection to intersection
Use type III barricades not type II
Show that existing tree is to remain
Issue Contact: Dave Stringer
Issue Contact. Dave Stringer
Issue Contact: Dave Stringer
Need to show concrete from property line to flow line for existing drive at
second point of access
or reference detail number and page that detail is on in your plans
Issue Contact: Dave Stringer
Provide design of water quality pond with outlet location and design
Issue Contact: Dave Stringer
r.o.w on plat and site/landscpe plans don't match
Issue Contact: Dave Stringer
Please submit all redline plans with next submital
Issue Contact: Dave Stringer
Street oversizing participation in improvements to prospect Road
Full reimbursement for Bus Bay improvements
Return redline plans with next submital
Excel Energy
4.1
Issue Contact. Dave Stringer
Issue Contact: Len Hilderbrand
Utility Easements
Must be a minimum of 9 feet wide and if tele cable or water stops are located
within the easement, the minimum width is 11 feet. Meters will need to be
clustered at one end of the attached units. Gas piping will need to travel
through attached units. Easements through units will be required.
5of14
19
W
Indicate radii size at all intersections
Provide cross section of Prospect Road
Issue Contact: Dave Stringer
Issue Contact: Dave Stringer
21 Issue Contact: Dave Stringer
Show dimensions and flowline grades of Bus Bay
22 Issue Contact: Dave Stringer
Show what type of curb and gutter are being proposed on all streets
23 Issue Contact: Dave Stringer
Provide cross section of cul-de-sac island
24 Issue Contact: Dave Stringer
Show water service line location for island
25 Issue Contact: Dave Stringer
A drainage system may be required with irrigated median/island
26 Issue Contact: Dave Stringer
Provide radii and flowline dimensions for cul-de-sac
27 Issue Contact: Dave Stringer
Provide grades for intersections as per LCUAS Standards 7-32B
28 Issue Contact: Dave Stringer
How much drainage is crossing sidewalks at driveways/alleys. Can only put 2-
year flows across walk, may need stormsewer inlet or underwalk drains
29 Issue Contact: Dave Stringer
Use City's standard undewalk drain, looks like type R inlet
30 Issue Contact: Dave Stringer
Use 2% slope in cul-de-sac, Reduce 3.55% at back of bulb
31
Additional comments on redline plans
4 of 14
Issue.Contact: Dave Stringer
Engineering
8
E
Need to provide an updated Soils Report
Issue Contact: Dave Stringer
Issue Contact: Dave Stringer
Need a groundwater report - high ground water is present in much of site.
Buildings appear to need sump pumps/or other dewatering system
10 Issue Contact: Dave Stringer
need to provide street signing and striping plan
Need to provide pedestrian crossing at intersection of Prospect and new street.
This is a high traffic area for schools
11 Issue Contact: Dave Stringer
Many problems with plat as it relates to reproduction
12 Issue Contact: Dave Stringer
May need to change street name of Meadowsland Lane
13 Issue Contact: Dave Stringer
What is rectangle at northwest side of property? Need to dedicate r.o.w. in this
area
14 Issue Contact: Dave Stringer
Areas being dedicated as alleys need to be tracts. Alleys cannot be used
unless the City's narrow street design is being used
15 Issue Contact: Dave Stringer
Plat name needs to reflect this plan is a replat of Pinnacle planned unit
development
16 Issue Contact: Dave Stringer
Why is ATT Broad band signing plat?
17 Issue Contact: Dave Stringer
Add repair limits note as described on page 4/19
18 Issue Contact. Dave Stringer
Access ramps.at intersection are to be directional ramps, See Section 16.3.1(5)
of the Larimer Urban Area Street Standards
3of14
91
92
93
1�6Z!
Issue Contact: Cameron Gloss
Parking Area perimeter landscaping
All parking lots with greater than 6 spaces must be screened from the street
and adjacent uses. Under the proposed design, screening will need to be
provided in the following locations:
1. North and east of the 8 space parking area abutting the east property line
and north of the single
family house (shown as unit 52)
2. South and east of the 6 space parking area abutting the east property line
and south of the 8-plex
(shown as units 1-8)
3. South of the parking area located between the two 8-plex units.
Pursuant to Section 3.2.1 (4)(a), screening adjacent the single family house to
the east must consist ofa fence or wall at least six (6) feet in height in
combination with plan material and of sufficient opacity to block at lest 75% of
the vehicles headlights. Screening from the street and the shop building shall
consist of a wall, fence, planter, earthen bern, plant material or a combination of
such elements, each of which shall have a minimum of seventy (70) percent of
the length of the street frontage of the parking lot and also seventy (70) percent
of the length of any boundary of the parking lot that abuts any non-residential
use. Plant material used for the required screening shall achieve required
opacity in its winter seasonal condition within three (3) years of construction.
Issue Contact: Cameron Gloss
Street Name Conflict- Meadowlands Lane
Please provide a different name for the east -west public street that is not
redundant or a "sound -alike" with an existing street.
Issue Contact: Cameron Gloss
Building Elevations- 8-Plex units
On the 8-plex units, the roof form and main facade elements are mismatched in
both form and proportion.
Issue Contact: Cameron Gloss
Building Elevations Mislabeled
Please revise elevations to reflect which are for townhouse versus 8-plex units.
Issue Contact: Cameron Gloss
Building Elevations- Scale
Please provide a scale on the building elevations so that staff may determine
appropriateness of the proposed overall/eave heights and that buildings will 'fit'
into the proposed envelopes.
2 of 14
STAFF PROJECT REVIEW
City of Forl Collins
PINECREST PLANNING AND DESIGN Date: 8/23/2001
C/O TOM DUGAN
4225 WESTSHORE WAY
FT. COLLINS, CO 80525
Staff has reviewed your submittal for PINNACLE TOWNHOMES PDP - TYPE I (LUC) #34-
OOA, and we offer the following comments:
ISSUES:
Current Planning
66
Issue Contact. Cameron Gloss
Architectural Variety -Townhouse Units
Please provide additional architectural elevations showing variations in building
materials and architectural detailing within the townhouse units. The submitted
plans only show two basic variations to siding/trim details (Elevation A/B and
Elevation C) where greater variety has been requested in previous meetings
with the applicant.
67 Issue Contact: Cameron Gloss
Color
Please provide a color palette for the development. Consistent with Section 4.4
(E)(4)(d), multi -family buildings must feature a palette of muted colors, earth
tone colors, natural colors found in the surrounding landscape or colors
consistent with the adjacent neighborhood. Also, for all development, no more
than two (2) similarly colored structures may be placed next to each other along
a street or a major walkway spine.
69 Issue Contact: Cameron Gloss
Handicap Parking
Please show dimensions of all handicap parking spaces and provide a ramp
access to the adjacent walkway
70 Issue Contact: Cameron Gloss
Parking Lot Interior Landscaping
All lots with six or more parking spaces and exceeding 1800 square feet must
have a minimum of 6% internal landscaping, consistent with Section 3.2.1(E)(5)
and 3.3.2(M)(1). Based on the submitted plans, it appears that the two fields of
surface parking adjacent the single family houses (units 52 and 53) fail to meet
this requirement. Please revise the plans accordingly.
1 of 14