Loading...
HomeMy WebLinkAboutPOUDRE RIVER FIRST ANNEXATION & ZONING - 25-02 - CORRESPONDENCE - CITY STAFFEX 8" 4 -LA e I SAN-"-- WTR— 'Iding -CL SAN-- IM X 8' SAN�1e IIIIIIIIIIIIIIIIII.............. IIIIIIIIIIIIIIIIIIIIIIII........ Lit 2 11XIS PROPOSED BUILDING A Ul PROPOSED BUILDING 8 4917 uilding Cn C P4 - 1 buddin r f buiiii ' 1 �I 7 PROPOSED 4 BUILDING D 00 YR FLOOD PLAIN LOT 5 LINE BUILDING C',V. (i .1 FLOOD WAY' f j LINE qncreie- es iih 1.1 • Con 0 Crete —7 4 Is, "It q concrete,. F1, 9�5 8 FROM : DES IGNN/LEIJD COMPANIES OF COLO PHO14E NO. : 970 282 7123 Jun. 17 2002 11:32AM P1 COLORADO HIGHWAY 14 ylj sr , •r , � �� 111.N�1'C�� wi�.� �t itJ �fi� � Js�d�l' �� �.� ��yi r arld i arld :-1✓a..yif�:.=__=__r __.. - - �+.Jf�, wAlCk_ �. ... - ___ �--G.. a — I FROM : DESIGN/LEND COMPANIES OF COLO PHONE NO. : 970 282 7123 Jun. 17 2002 11:24AM P3 New structures are allowed outside of the City's floodway or product corridor, but not within the City, s floodway or product corridor. • Because the building pads have been removed from the floodplain, which also results in the removal from the floodway and product corridor during the County's land use adoption process and are no longer in the floodplain, new structures would be allowed if the other applicable City floodplain regulations listed below are met. Additional fill would not be allowed in the area of the City's floodway or product • corridor. This would require either the area of fill to be removed from the floodplain through the map revision process or a study to show that no net increase in fill is occurring for the panting or landscaped area. • > by land access would be required from property outside of the floodpWm to each of the new buildings surrounded by the City's floodway or product corridor. This dry access is established to ensure vehicle movement to and from the buildings during flooding and needs to be elevated just above the loo-year flood elevation. • Floatable materials would not be allowed outside of any enclosed structure. Listed above are those floodplain regulations that would be applicable to the development today, any new regulations that may be adopted between today and the application of the building permits would also apply. At this time I'm not aware of any changes to the existing regulations that are being considered. If you have nay questions on the above please don't hesitate to contact me. Thank you. Sincerely, 065 Bob Smith Water Planning Manager Cc: Matt Lafferty, Larimer County Planning Rex Burns, Larimer County Engineering Roger Buffington, City of Fort Collins Utilities Glen Schlueter, City of Fort Collins Utilities Marsha Rdmes-Robinson, City of Fort Collins Utilities FROM : DESIGN/LEND COMPANIES OF COLO PHONE NO. : 970 282 7123 Jun. 17 2002 11:24AM P2 Utilities light & power • stormwater • wastewater • water Ci Of Fort Collins May 14, 2002 Donald Leffler Design Development Consultants 2627 Redwing Road, Suite 350 Fort Collins, CO 80526 Re: Hudek Business Park — Poudre Floodplain Regulations Dear Don, With this correspondence I would like to summarize our discussion of the City's Poudre River floodplain regulations as they pertain to the proposed new development entitled "Hudek Business Park". The Hudek Business Park is located on the south side of East Mulberry Street with the entire parcel located in the Poudre River floodplain. The parcel is proposed to be subdivided into five lots with one of the lots associated with the already existing structure. Approximately the southern third of the parcel is located in Larimer County's regulatory one-half foot rise floodway. The City's regulatory floodway-product corridor encompasses about three/fourths of the southern portion of the property (see the attached map). This new development is being proposed under the jurisdiction of Larimer County and sometime in the future may be annexed into the City of Fort Collins_ You have inquired as to the effect of annexation on this property. Any building permits issued after annexation would be required to meet the City' a floodplain regulations applicable at that time. The County's current regulations do not allow creation of new building sites anywhere within the floodplain, whether floodway or flood fringe_ For this reason, building sites on the proposed four new lots would have to be removed from the floodplain through the Federal Emergency Management Agency map revision process prior to being created. In regard to the City's floodplain regulations that would be applicable at the time of building permit issuance, assuming approval of the plat by the County before annexation into the City and the building pads removed from the floodplain through the map revision process, would be as follows: 700 Wood St. • P.O. [lox 580 • Fort Collins, CO 8052) 0580 • (970) 221-6700 - FAX (970) 221-M19 • FAX (970) 221-6593 • TDD (970) 224-6003 o-mail: utilities(rjrci.fort-collins.co.us • www.ci.fort-collins.co.u.vl-MLMES