Loading...
HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT, CENTENIAL HIGH SCHOOL EXPANSION & REMODEL - SITE PLAN ADVISORY REVIEW - 39-02 - CORRESPONDENCE - REVISIONS5 How was the existing alley ROW vacated? Or was it? Coordinate the various plan sets so that they present the same information. The utility plans do not match the site or landscape plan. Page 2 Project Comments Sheet Citvof Fort Collins Selected Departments Department: Engineering Date: October 15, 2002 Project: POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT EXPANSION AND REMODEL All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: October 16, 2002 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General 3 This is an incomplete submittal. All public improvements must be designed in accordance with LCUASS. Please read Chapter 2 and 3 of LCUASS for submittal and design requirements. Please complete and submit the checklist in appendix E-4. Submit a TIS, soils report, and drainage report. See redlines. This review is general in nature only. A more detailed review will be given when a more detailed design is submitted. 4 Comments given at the Conceptual Review (April 1, 2002) still stand. They are as follows: Traffic Impact Study may be required. Contact Eric Bracke. Directional ramps required at intersections. See detail 7-12F for alley design. No high volume drive allowed off Mathews or Peterson. Could submit a variance request in accordance with section 1.9.2 for the delivery drive. Parking setback of 50' from local streets. Applicant proposed to vacate the alley ROW bisecting the property and dedicating a utility easement for the existing utilities. All ROW vacations must go through City Council. Any existing damaged curb/gutter/sidewalk must be replaced. Underground any existing overhead utilities. Contact Rick Richter (221-6605) for possible alley improvements. All improvements to LCUASS. Possible ROW and utility easement dedications. /c (Ihr' Date Lri>r;c K-11TERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site ! Drainage Report Other _ Utility -c Redline Utility 1 Landscape Page I 25 Please provide basin summary table, pond tables, etc., on the Drainage Plan at 90% submittal. 26 Please provide contours at least 50 feet from property boundary around site. The northwest corner of the site needs to be documented and shown where the drainage flows. Please add another basin for this part of the site. 27 Please see comments on detail sheet regarding water qujjjijW.-oytlet structure. t Topic: Erosion/Sediment Control 28 Review will take place at 90% submittal. Page 2 e Project Comments Sheet CitvofFort Collins Selected Departments Department: Stormwater Utility Date: October 17, 2002 - Project: POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT EXPANSION AND REMODEL All comments must be received by TED SHEPARD in Current Planning no later than the staff review. meeting: October 16, 2002 Note - Please identify your redlines for future reference Issue Contact: Wes Lamarque Topic: F/oodplain 16 The adopted floodplain mapping for the Old Town Basin does not show any of the proposed structures in the floodplain. However, due to the information presented in a previous meeting between the City of Fort Collins and the applicant regarding that this site will be in the Moderate Risk Floodplain (shallow flooding, less than 1-foot deep) once the new Old Town Drainage Master Plan is adopted, the City recommends that all proposed buildings should be elevated 2 1/2 feet from existing grade ( 1-foot to BFE plus 18-inches of freeboard) and existing buildings be flood -proofed up to this same elevation. 24 Please document in the text of the report that the site will be in the moderate risk floodplain (less than 1- foot deep) once the new Old Town Master Drainage Plan is officially adopted. Topic: Drainage 15 Due to the major changes with the drainage infrastructure, a detailed review will take place at the next submittal after these changes have been designed. A general review will be done for this submittal. CO ,rer) Signature ID i-7 a Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site ✓ Drainage Report Other ✓ Utility ✓ Redline Utility ✓ Landscape Page 1 C-C_ 1 ed S Le� d S J m Project Comments Sheet City of Fort Collins Selected Departments Department: Water Wastewater Date: October 17, 2002 Project: POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT EXPANSION AND REMODEL - All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: October 16, 2002 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General 17 Is alley ROW being vacated? If so provide A. 630 foot utili asement for existing sanitary sewer main. Provide utility easement documentation for our review. 18 No permanent structures are permitted in utility easements (i.e. seating walls, trash enclosures, retaining walls, etc.). 19 Clearly show and label all water and sewer appurtenances (I.e. valves, thrust blocks, curb stops, etc.). 20 Provide standard landscape separation distances from all water/sewer lines. Include all standard general notes on landscape plans and utility plans. See site, landscape and utility plans for other comments. Signature _ Date — CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat I Site Drainage Report Other 1 Utility Redline Utility_ Landscape Page i City of Fort Collins LETTER OF TRANSMITTAL To: Date: P'S D Project: TRANSMITTED HEREWITH ARE: CV Redlined Utility Plans See attached sheet for number of copies to resubmit. t Resubmit copies to: ❑Current Planning ❑Engineering ❑ Redlined Storm Drainage Report See attached sheet for number of copies to resubmit. Resubmit copies to: ❑Current Planning ❑Engineering ❑ Development Agreement Please sign, seal, date, and return all copies of this agreement. Changes in the agreement take two (2) days to process if they are acceptable to the City. Please take this into account in your schedule. Again, all copies must be returned. ❑ Original Mylars Needing Revisions Please return with the "post -it" notes intact. ❑ Original Mylars with City Signatures Please return one (1) mylar and four (4) signed and stamped blueline print copies for our files. ❑ Development Construction Permit Application Please fill out and return to Engineering counter with application fee and all required attachments. ❑ Development Construction Permit for your Signatures Please sign (but do not date) and return. ❑ Attached is your Copy of the Development Construction Permit ❑ Draft Development Agreement For your review and comments. Please call with your comments or questions. Let me know if everything is okay. ❑ Attached is your Copy of the Development Agreement. ❑ Other Transportation Services — Engineering Department 281 North College Avenue — P.O. Box 580 — Fort Collins. CO 80522-0580 — (970) 221-6750 Mr. Ted Shepard April 9, 2003 Page 2 Engineering Comments Topic: General 3. Engineering did receive the entire submittal package. A drainage report and soils report were submitted along with civil Utility Improvement Plans, Landscape Plan and Site Plan. A Traffic Impact Study was not required per the direction of Mr. Eric Bracke, CFC Traffic Engineer. 4. Directional ramps on the corners of site have been recently constructed as part of the Laurel Street pavement improvements. The service entrance driveway on Mathews Street has been revised to reflect the City detail 729A, "Standard Driveway Approach —Types 1 & 2". Parking setback of 50 feet will require a variance since parking on the site has been an issue with the neighborhood and the Planning and Zoning Commission. The Poudre School District will process the Right -of -Way vacation. A 30-foot wide utility easement will be dedicated. Noted. All damaged curb and gutter will be replaced per City standards. Overhead utilities will be placed underground and are noted on the Utility Plan. The Poudre School District will process the Right -of -Way vacation. A 30-foot wide utility easement will be dedicated. 6. The civil Utility Improvement Plans, Landscape Plan and Site Plan have been updated to match. Thank you for your review and approval of these plans and responses. If you need further clarification on any of the above responses, please call me (419-1316) at your convenience. Sincerely, Nolte Associiapptes, Inc Thomas Ochwat, P.E. Project Manager NOLTE ASSOCIATES. INC. April 9, 2003 FCO22701 Mr. Ted Shepard Senior Planner - Current Planning Division City of Fort Collins 281 N. College Ave. .Fort Collins, CO 80524 NOEM B E Y O N D E N G I N E E R I N G RE: Response to City of Fort Collins Comments dated October 16, 2002 PSD — Centennial High School Expansion and Remodel Dear Mr. Shepard: This letter is in response to the comments received from the City of Fort Collins. Specific responses are in the order of each comment sheet and reference the note number where applicable. Water/Wastewater Comments 17. The alley will be vacated and a 30-foot wide easement will be dedicated. 18. Permanent structures have been removed from within the proposed 30-foot wide utility easement. 19. The utility plan labeling has been completed. 20. Noted Stormwater Utility Comments Topic: Floodplain 16. This comment is further addressed in the Final Drainage Report. 24. Noted. Please refer to the drainage report. Topic: Drainage 15. Noted. 25. Noted. This information has been included on the Drainage Plan. 26. Noted. Contours have been extended. 27. Noted. Topic: Erosion/Sediment Control 28. Noted. Erosion control features have been included on the grading plan. NOLTE ASSOCIATES, INC. 1901 SHARP POINT DRIVE, SUITE A FORT COLLINS, CO 80525 970.221.2400 TEL 970.221.2415 FAX WWW.NOLTE.COM