Loading...
HomeMy WebLinkAboutTHE HUMAN BEAN, 799 N. COLLEGE AVE. - MODIFICATION OF STANDARD - 28-04 - CORRESPONDENCE - (5)m Transportation Planning Contact Info: Dave Averill 416-2643, daverill@fcgov.com 1. The project needs to meet CDOT access requirements for North College. Current Planning Contact Info: Anne Aspen, 221-6206, aaspen@fcgov.com 1. This development proposal is subject to all applicable standards of the Fort Collins Land Use Code (LUC), specifically Articles 2 - Administration (Development Review Procedures), Article 3 - General Development Standards, and Division 4.18 — Commercial — North College District (C-N) 2. The entire Fort Collins Land Use Code (LUC) is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm 3. As you prepare your plans for development review submittal, pay particular attention to the following standards: • Landscaping and Tree Protection Standards [LUC 3.2.1] • Access and Parking Lot Requirements [LUC 3.2.2, especially (H)] • Site Lighting [LUC 3.2.4] • Mixed -Use, Institutional, and Commercial Buildings [LUC 3.5.3] • Signs [3.8.7] 4. Please visit our website at www.fcgov.com/currentplanning/submittals.php for a complete list of submittal requirements. _ 5. You will need to set up an appointment to submit your application with Ginger Dodge in Current Planning at 221-6750. Incomplete submittals will not be accepted. 6. A neighborhood meeting will need to be held for this application. Neighborhood meetings are typically held prior to submitting the project to the City for review in order to facilitate citizen participation early in the development process and to incorporate needed changes before time and effort have been expended by the applicant. Please contact me to coordinate this meeting. 4 a 7. The applicant will need to design and build the curb and gutter improvements along the frontage of the property. The design will need to tie into the end of the recent curb and gutter improvements and extend north for a thousand feet beyond the property line in accordance with standards. 8. The crossing vehicular movements on the plan are a concern. 9. What is the parking to the north side of the property for? Is it employee parking? 10. How will delivery service and drop-off work? Light and Power Contact Info: Alan Rutz, 224-6153, arutz@fcgov.com 1. Please contact Light and Power to coordinate the location of the transformer. 2. Development charges will be assessed. Stormwater Utility Contact Info: Glen Schlueter, 221-6700, gschlueter@fcgov.com 1. This site is in the Poudre River Basin where there are no new development fees. 2. A drainage and erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. 3. Onsite detention is required with a 2 year historic release rate for water quantity and extended detention is required for water quality treatment. These are required if there is an increase in imperviousness greater than 1000 square feet. If there is less than 1000 square feet of new imperviousness a site grading plan is all that is required. 4. This site is on the Stormwater Utility inventory map 7F. 5. The outfall to this site is the abandoned Josh Ames irrigation ditch south of the site. Easements may be needed from the lot to the south to get the drainage to the Josh Ames ditch. If a pipe or borrow ditch can be built in the College Ave. ROW to covey it to the ditch, an easement is not needed. The ditch the applicant talked about along the rear of the lot can be used, but if it isn't in an easement, one will be needed. 6. Most of the site is in the 100 year Poudre River floodplain, but not in the floodway or product corridor. Structures would have to be elevated or commercial buildings can be floodproofed 2 ft. above the Base Flood Elevation (BFE). Dryland access is required and no floatables are allowed to be stored outside. A Floodplain Use Permit is required prior to release of a building permit. An elevation or floodproofing certification is required prior to the release of a Certificate of Occupancy. Water/ Wastewater Contact Info: Roger Buffington, 221-6854, rbuffington@fcgov.com 1. An 8" water main exists in the west side of College Ave. 2. A 15' wide easement will be required for sewer line. 3. An as -built of the sewer will be required. 4. Development fees and water rights will be assessed and provided at the time the building permit is issued. 3 ITEM: Proposed Human Bean drive through coffee shop at 799 N. College MEETING DATE: June 21, 2004 APPLICANT: Joe Carter on behalf of: Director of Planning Sam Wray Cityscape Urban Design, Inc. SS Blue Sky, LLC 3555 Stanford Road, Suite 105 4625 Regency Dr. Fort Collins, CO 80525 Fort Collins, CO 80526 LAND USE DATA: Request to build a 400 sf drive through coffee shop at 799 N. College Ave. The property is within the City of Fort Collins and is currently zoned C-N — Commercial - North College District. The following departmental agencies have offered comments for this proposal: COMMENTS: Zoning Contact Info: Jenny Nuckols, 416-2313, inuckols@fcgov.com 1. The proposed use is allowable in the C-N District subject to a Type II process/P&Z Board review. 2. Please provide and label bike parking on site plan. 3. A 16' van accessible parking space is required. 8' is not sufficient. 4. The proposed development will need plantings to meet foundation plantings requirement. Perimeter will need to include landscaping other than sod. A 5' landscape strip is required along the west side. Engineering Contact Info: Marc Virata, 221-6605 ext. 7188, mvirata@fcgov.com Or Sheri Wamhoff, 221-6605 ext. 7140, swamhoff@fcgov.com 1. Sheri discussed the conceptual proposal for Human Bean at a Transportation Coordination meeting and then with Tess Jones of CDOT yesterday. The following are comments that came out of those discussions: 2. Only a single point of access (a driveway meeting standards without the median) will be allowed to the property. 3. Applicant needs to show on the plans that this driveway aligns with the center line of the driveway across the street (SH287). This will need to be shown on the plans. 4. Applicant needs to show that cross access is allowed for in the design. The cross access needs to be accommodated within the parcel area under review. If the intent is that it is across the back piece of the property, then that portion needs to be included in the submittal (this does not mean that the entire parcel out to Alpine needs to be included). 5. The applicant will be responsible for the installation of sidewalk along SH287 along the property frontage. The sidewalk is to be concrete, built to arterial standards. 6. If a Transportation Impact Study (TIS) is required, then a pedestrian Level Of Service (LOS) analysis will need to be included and will need to identify all pedestrian destinations within a quarter mile to determine if any off -site sidewalk connections will need to be made. 2 CommL ry Planning and Environmental rvices Current Planning Citv of Fort Collins June 28, 2004 Joe Carter Director of Planning Cityscape Urban Design, Inc. 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 Joe: For your information, attached is a copy of the Staff's comments for the proposed Human Bean Drive -Through Coffee Shop at 799 N. College Ave, which was presented before the Conceptual Review Team on June 21, 2004. The comments are informally offered by staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. The City's current planning department coordinates the development review process. I am the project planner for your project. I will be commenting and assisting in the coordination process. If you have any questions regarding these comments or the next steps in the review process, please feel free to call me at 970-221-6750. Sincerely, ;;�, lllqll,� 641 Anne H. Aspen City Planner cc: Project File cc: ' ema � Jenny Nuckols Glen Schlueter Roger Buffington Marc Virata David Averill Alan Rutz 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-67 50 • FA\ (970) 416-2020