Loading...
HomeMy WebLinkAboutTIMBERLINE CENTER REZONING - 41-05 - CORRESPONDENCE - CORRESPONDENCE-HEARINGI. (2.) The north -south walkway that connects Building E to Building F shall be redesigned so that pedestrians have an unobstructed walkway to the building entrance. (3.) The area associated with the drive-thru lane, pick-up window and cashier window shall be buffered more effectively to mitigate the impact on future development. This area shall upgraded with a dense planting of evergreen trees so that future uses in the Employment zone are properly screened. This screening enhancement would further compliance with Section 3.2.1(E)(6) — Screening. (4.) The patio area shall be moved to the east near the front entrance. The patio should feature a sufficient amount of trees, planted in grates if necessary, to shade the customers. Such redesign would further compliance with Section 3.2.2(C)(3) — Site Amenities. C. The Board voted 4 — 0 to approve the Modification Request to Section 4.23(E)(3) with regard to screening along the west of the Enclosed Mini -Storage buildings. D. The Board voted 4 — 0 to approve the Modification Request to Section 3.5.3(B)(2) with regard to the build -to lines for Buildings B and C. E. The Board voted 4 — 0 to approve the Timberline Center P.D.P. subject to the following conditions: (1.) At the time of submittal for Final Plan, the request to rezone 16.13 acres of the P.D.P. from T, Transition to I, Industrial must be approved by City Council on Second Reading. (2.) At the time of submittal for Final Plan, architectural elevations for Building E shall be provided that demonstrate compatibility through cohesive and unified architecture with ' the established architectural character of all buildings within the center with the exception of the Enclosed Mini -Storage. If you have any questions regarding these actions, or the subsequent City Council meetings, please feel free to contact the Current Planning Department at 221-6750. STince�rely- Ill Ted Shepard Chief Planner 1. Comn _ .ity Planning and Environment:, ,ervices Current Planning December 9, 2005 City of Fort Collins Sandy McFeron V-F Ripley Associates 401 West Mountain Avenue Fort Collins, CO 80521 RE: Timberline Center Rezoning #41-05 and Timberline Center PDP #41-05A Dear Sandy: On Thursday, December 8, 2005, at the regular meeting of the City of Fort Collins Planning and Zoning Board, the Board took the following actions: 1. Timberline Center Rezoning #41-05: The Board voted 4 — 0 to approve the request to rezone the 16.13 from T, Transition to I, Industrial. This recommendation will be forwarded to City Council for their consideration on First Reading on December 20, 2005. 2. Timberline Center P.D.P. #41-05A: The Board to the following five actions with regard to Timberline Center P.D.P.: A. Voted 3 — 1 to deny the Modification Request to Section 4.23(B)(c)5. with regard to allowing a Convenience Retail Store With Fuel Sales within 3/ mile from any other such use and from any fueling station. B. Voted 4 — 0 to approve the Modification Request to Section 3.2.2(H) and 3.5.3(B)(1) with regard to the relationship of the building to the connecting walkway for Building E, subject to the following conditions: (1.) The connecting walkway and crosswalk to Building A to the west shall be redesigned so that the walkway does not make two 90-degree angles but continues in a straight alignment similar to the connection to the bank to the east. The three parking spaces should be eliminated or redesigned in such a way as to not discourage or convolute pedestrian travel. Such redesign would further compliance with Section 3.2.2(C)(5)(a) — Walkways. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 0 (970) 221-6750 • FAX (970) 416-2020