HomeMy WebLinkAboutGLOBAL VILLAGE ACADEMY - FORT COLLINS PHASE II - Filed DCP-DEV. CONSTRUCTION PERMIT - 2015-11-10City of
F6rt Collins
Engineering
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: /5%iIssuance Date: 55 / 1 � 5—
Project Name: Global Village Academy- Phase II
Project Location: Northwest corner of Taft Hill Road and West Horsetooth Road
Permittee: Matt Disney- Faurot Construction- 303.349.6464
City and developer contacts: See attached Exhibit `A' for names hnd phone numbers of all
contact persons for this project
Fees: Permit Application Fee (paid 7/06/15- BMISC150401) $ 400.00- paid
Construction Inspection Fee: (paid 6/11/14 check #30590)13pli5ciTow$ 1,210.45- paid
Street Cut Fee (if applicable to be paid separately) N/A
Total amount due $ 0.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 33,346.00
Form of security deposited with the City: check # 30591
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
Page 1 of 5
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
y
7. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and
(4) the `as -constructed' plans have been received and accepted by the City.
8. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
9. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
10. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
11. Other conditions: N/A.
Page 2 of 5
Permittee's acknowledgment signature:
By slgrnilg tIns penyit I ackiiciwlcuges that I alll aaillD wiib 111G klio-WI ;uL(:, Cullb,�lit, aliu dulllolliy of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature -Date:
Approval for issuance:
.D_ City Engineer Approv WI -Date:.
(Perntit I su nce Date)
Page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Global Village Academy- Phase II
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Tyler Siegmund
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6501
Construction Inspector: Wayne Lenard
281 N. College Avenue, Fort Collins, CO 80524
(970) 222-6824
Water Utilities Engineer/ Wastewater Engineer:
Roger Buffington
700 Wood Street, Fort Collins, CO 80521
(970)221-6854
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
(970) 224-6700
Natural Resources: Lindsay Ex
281 N. College Avenue, Fort Collins, Co 80524
(970) 224-6143
Traffic Operations: Joe Olson
625 Ninth Street, Fort Collins, Co 80524
(970)221-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Forestry: Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970) 221-6361
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970) 221-6700
Page 4 of 5
Developer's Contact Persons:
Applicant/Project Manager: Doug Talbot
GVA FC Project Development
6900 S 900 E, Suite 100
Midvale, UT 84047
(801) 256-9550
dougaa,hi ghmarkschools. com
Project Engineer: Erik Nakos
JVA Incorporated
25 Old Town Square, Suite 207
Fort Collins, CO 802524
(970) 225-9099
enakos@jvajva.com
Architect/Planner: Adele Willson ,
Slaterpaull Architects
1331 19t' Street
Denver, CO 80202
(303) 607-0977
awillsonaslaterpaull.com
w
General Contractor: Matt Disney
Faurot Construction
4439 Broadway, Suite G
Boulder, CO 80304
(303) 642-7212
_jjzoode@faurotconstruction.com
Page 5 of 5