HomeMy WebLinkAboutPOUDRE VALLEY HEALTH SYSTEM HARMONY CAMPUS MEDICAL CENTER UNIVERSITY OF COLORADO HEALTH CANCER CENTER ADDITION - Filed CS-COMMENT SHEETS - 2014-08-28arof t Collins f� January 28, 2013 — Responses Addressed on February 11, 2012 Angela Milewski BHA Design 1603 Oakridge Dr. Fort Collins, CO 80525 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentreview RE: PVH Harmony Campus- Cancer Center Addition, MA130001, Round Number 1 Angie, Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter directly. Sincerely, Peter Barnes Zoning Administrator Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenbergerQfcaov.com Topic: General Comment Number: 1 Comment Originated: 01/25/2013 01/25/2013: Missing the City's General Notes. These need to be included in the plan set. Please let me know if you need me to send them to you. M/M Response: The City's General Notes have been added to plans on sheet C101. Comment Number: 2 Comment Originated: 01/25/2013 01/25/2013: Need two City Benchmarks placed on the plans. MAW Response: Two benchmarks are now shown on the plans, see sheet C100. Comment Number: 3 Comment Originated: 01/25/2013 01/25/2013: Note C.2 on the cover sheet. I believe that the report was by Stantec not santec. MAW Response: Spelling error has been corrected. Page 1 of 9 feet of cover. The water main profile should help to identify any areas with less than the minimum of 4.5 feet of cover. M/M Response: The water crossing has been revised to provide 4.5' of cover. Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnesCa)fdoov.com Topic: General Comment Number: 1 Comment Originated: 01/18/2013 01/18/2013: Sheet 1 of 5 of the recorded plan contains the Land Use Data table. This table needs to be updated as part of the Minor Amendment to reflect the new floor area, FAR, and revised parking numbers. Response: Included an updated Land Use Data sheet with both the current proposal and the previous Cancer Center Addition / Minor Amendment. Topic: Site Plan Comment Number: 1 Comment Originated: 01/18/2013 01/18/2013: It's difficult to discern the footprint of the addition on the site plan (Sheet L101 and L102). It's not labeled, and the footprint line is hard to follow. Please label the footprint and use a heavier line to delineate it. Also add footprint dimensions to the plan. Response: Building addition footprint labeled and a heavier line type added to perimeter. Footprint dimensions added to the plan. Comment Number: 2 Comment Originated: 01/18/2013 01/18/2013: Label what's existing and what's new. i.e. label all new sidewalks, new parking, existing building, new addition, etc. Show the parking stall and drive aisle dimensions for new parking spaces. Response: Additional labels, dimensions added to Sheets L 101, L 102 and L 103. Comment Number: 3 Comment Originated: 01/18/2013 01/18/2013: De-emphasize or remove the hatched areas for the patio enlargement and healing garden enlargement shown on L101. The addition should be emphasized on this sheet, and the bubble hatching distracts from that. Response: Enlargement hatch removed from the plan. Department: Planning Contact: Ted Shepard Topic: General Comment Number: 1 In 2012, City Council passed an Ordinance that requires a minimum number of bicycle parking spaces. For medical office buildings, the minimum required number spaces is one space per 4,000 square feet. In addition, 20% of these spaces have to be enclosed and 80% may be unenclosed in a fixed rack. Please refer to Section 3.2.2(C)(4). Also, please refer to the definitions for Bicycle Parking, Enclosed and Bicycle Parking, Fixed for further explanation. Response: Medical Offices B/dg's. required 1 space per 4,000 sq.ft. Proposed bldg. addition = 30,000 sq.k. Page 8of9 30,000 sq.ft. / 4,000 sq.ft. = 7.5 (round up to 8) total spaces required. 20% of this total (2) shall be interior or covered spaces. Bike Parkins Summary Reauired Provided Exterior 6 8 Interior / Covered 2 2 (within building) Total Bike spaces 8 10 Comment Number: 2 On the Lighting Plan, there are three fixture that call for up -lighting. And the "Wall Pack" is not specified. Please note that up -lighting is prohibited. Response: Up light 'GG' fixtures have been removed from the scope. Up light 'FF fixtures provide lighting for the flag poles as required by the federal government and approved by Fort Collins via phone conversations. Wall sconce 'AA' on the front pilasters are cutoff by the canopy, and all other exterior wall sconce fixtures are down directional only. Comment Number: 3 On the Lighting Plan, please add data as to the wattage and lumens for each fixture. Response: Information has been provided in revised sheets. Page 9 of 9 Comment Number: 4 Comment Originated: 01/25/2013 01/25/2013: The easement vacation request and legal description was received. The legal is being reviewed and the request will be routed. As for the timing of the easement vacation the easement cannot actually be vacated until the waterline has been relocated and accepted in the new location. The waterline relocation work cannot start until the plans are approved and a Development Construction Permit (DCP) has been issued for the project. MAW Response: Noted. Comment Number: 5 Comment Originated: 01/25/2013 01/25/2013: It looks like one of the new Fire hydrants (the one closest to the building) is not actually located within the existing utility easement. If the proposed Fire hydrant is to remain in this location dedication of a utility easement will be needed prior to approval of the plans. I can provide you will base dedication documents and information on this process if you need it. M/M Response: A utility easement dedication request will be submitted for approval and the written legal and easement exhibit is in process with the project surveyor and the easement dedication will follow this submittal. Comment Number: 6 Comment Originated: 01/25/2013 01/25/2013: The new sewer line appears to be crossing two areas in which utility easements do not exist. Dedication of utility easements for these areas is needed prior to approval of the plans. I can provide you with base dedication language and information on this process if you need it. MAW Response: A utility easement dedication request will be submitted for approval and the written legal and easement exhibit is in process with the project surveyor and the easement dedication will follow this submittal. Comment Number: 7 Comment Originated: 01/25/2013 01/25/2013: With this project any damaged public curb, gutter and sidewalk existing prior to construction, as well as public streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project along and adjacent to the public streets, shall be replaced or restored in like kind at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. The limits of the repairs will be identified in the field by the City Engineering Inspector prior to and over the course of the project and will not be shown on the plans. We are aware of some areas of damaged sidewalk that will need to be repaired. M/M Response: Noted. Comment Number: 8 Comment Originated: 01/25/2013 01/25/2013: Need to make sure that it is clear that the curb, gutter, sidewalk and ramp details provided on the plans is for on -site use only and does not apply to any work to be done on the public sidewalk system or streets. M/M Response: A note has been added to Sheet C800 stating that all site details are for on -site construction only. Department: Light And Power Contact: Alan Rutz, 970-224-6153, arutz0ftnov.com Topic: General Comment Number: 1 Comment Originated: 01/22/2013 01/22/2013: System modification charges will apply. Page 2 of 9 Response: Acknowledged. Comment Number: 2 Comment Originated: 01/22/2013 01/22/2013: Submit C-1 form with load requirements. Response: See Attached C-1 Form Comment Number: 3 Comment Originated: 01/22/2013 01/22/2013: Transformer must be located within 10' of a drive over surface and must be accessible by a line truck. The proposed transformer location will need to be relocated. MAW Response: The location of the transformer has been revised to be a few more feet to the south and is now located 10' from the drive to the south, see plan C300. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler(Mpoudre-fire.orp Topic: General Comment Number: 01 Comment Originated: 01/24/2013 01/24/2013: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM New buildings or building additions that cause the building to be greater than 50,000 square feet will require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 Response: The contractor will be notiFed and in contact with the PFA. Comment Number: 02 Comment Originated: 01/24/2013 01/24/2013: FIRE LANES Fire access lanes shall be designated on the plat as an Emergency Access Easement. MAW Response: The "Utility, Access and Drainage Easement" as dedicated via the Plat titled Poudre Valley Health System Harmony Campus Medical Center will be preserved over the north and south access drives adjacent to the new building addition and is labeled on plan C300. Comment Number: 03 Comment Originated: 01/24/2013 01/24/2013: STRUCTURES THREE OR MORE STORIES IN HEIGHT Required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. 2006 International Fire Code Appendix D. MAW Response: The 32' wide access drive on the north side of the building addition is located 15' from the building, see plan C-300 for dimensions. Comment Number: 04 Comment Originated: 01/24/2013 01/24/2013: AUTOMATIC FIRE SPRINKLER SYSTEM This building will require an automatic fire sprinkler system under a separate permit. Response: The contractor has submitted with the building department and coordinated the sprinkler system permit. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam(aafcgov.com Page 3 of 9 Topic: Erosion Control Comment Number: 1 Comment Originated: 01/15/2013 01/15/2013: Correct ALL redlines in both the erosion control plan and erosion control report. If there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam anfcgov.com MAW Response: Redlines on Plans and Erosion Control Report have been addressed. Erosion Control Plan has been revised to align with the document received from Jesse Schlam via email on 21612013 titled "RE. Erosion Control Report and Drawings Requirements Accompanying Document" Comment Number: 2 Comment Originated: 01/15/2013 01/15/2013: Please Submit an Erosion Control Security Calculation. If there are any questions please contact Jesse Schlam 970-218-2932 or email @jschlam fcgov.com MAW Response: Security Calculation has been included with this submittal in the "Engineer's Opinion of Probable Cost" section of the report appendix. Comment Number: 3 Comment Originated: 01/15/2013 01/15/2013: Please add to the Erosion Control Report the following: Existing Percent Vegetation, Closest Receiving Waters and the Pathway to reaching those waters, Specifically address how to control the Potential Pollution Sources not just referencing urban drainage, Management of Contaminated Soils encountered on site if any, Loading and unloading operations, Significant Particulate generation, seeding mixes, soil amendments for the site, mulches used. If there are any questions please contact Jesse Schlam 970-218-2932 or email @ ischlam(a fcgov.com M/M Response: Comment addressed. Comment Number: 4 Comment Originated: 01/15/2013 01/15/2013: Please submit sequence plans and a sequence chart showing what BMPs are installed in the various sequences of construction. If there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam(a)fcgov.com MAW Response: Comment addressed. Comment Number: 5 Comment Originated: 01/15/2013 01/15/2013: Please attach all details that are called out on the Plans. There also seems to be saw cutting please address what BMPs will be used and there Details to collect these cuttings (i.e. if they are using a wet saw vacuuming) If there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlamta'�fcgov.com MAW Response: Comment addressed. Sawcutting discussion has been added to the report, and a call -out has been added to the initial plan. Topic: General Comment Number: 6 Comment Originated: 01/15/2013 01 /15/2013: Please attach the Standard Erosion Control Notes to the Plans. If there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam _fcgov.com M/M Response: Comment addressed. Contact: Wes Lamarque, 970-416-2418, wlamargue(Mcgov.com Page 4 of 9 Response: Acknowledged. Comment Number: 2 Comment Originated: 01/22/2013 01/22/2013: Submit C-1 form with load requirements. Response: See Attached C-1 Form Comment Number: 3 Comment Originated: 01/22/2013 01/22/2013: Transformer must be located within 10' of a drive over surface and must be accessible by a line truck. The proposed transformer location will need to be relocated. M/M Response: The location of the transformer has been revised to be a few more feet to the south and is now located 10' from the drive to the south, see plan C300. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a)-poudre-fire.orn Topic: General Comment Number: 01 Comment Originated: 01/24/2013 01/24/2013: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM New buildings or building additions that cause the building to be greater than 50,000 square feet will require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 Response: The contractor will be notiFed and in contact with the PFA. Comment Number: 02 Comment Originated: 01/24/2013 01/24/2013: FIRE LANES Fire access lanes shall be designated on the plat as an Emergency Access Easement. M/M Response: The "Utility, Access and Drainage Easement" as dedicated via the Plat titled Poudre Valley Health System Harmony Campus Medical Center will be preserved over the north and south access drives adjacent to the new building addition and is labeled on plan C300. Comment Number: 03 Comment Originated: 01/24/2013 01/24/2013: STRUCTURES THREE OR MORE STORIES IN HEIGHT Required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. 2006 International Fire Code Appendix D. MAW Response: The 32' wide access drive on the north side of the building addition is located 15' from the building, see plan C-300 for dimensions. Comment Number: 04 Comment Originated: 01/24/2013 01/24/2013: AUTOMATIC FIRE SPRINKLER SYSTEM This building will require an automatic fire sprinkler system under a separate permit. Response: The contractor has submitted with the building department and coordinated the sprinkler system permit. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlamtc'toov.com Page 3 of 9 Topic: General Comment Number: 7 Comment Originated: 01/25/2013 01/25/2013: Please use the City's standard sidewalk chase detail. M/M Response: The City's sidewalk chase detail has been added to sheet C80Z Comment Number: 8 Comment Originated: 01/25/2013 01/25/2013: Some proposed trees are located on top of the proposed private storm sewer. The City requires 10 feet separation for shade trees and 7 feet of separation for ornamental trees to public storm sewers. The City suggests considering future maintenance of the storm system with respect to proposed landscaping. Response: Three of the four trees in conflict on the north side of the building have been relocated. One of the four ornamental trees in conflict on the north side of the building was removed from the plan. One ornamental tree within the healing garden has been eliminated do to separation conflict. One shade tree within the healing garden has been change to an ornamental tree and its placement adjusted to comply with separation recommendation. Two ornamental trees west of the healing garden have been adjusted to comply with separation recommendation. One shade tree in a parking lot island has been changed to an ornamental tree and its placement adjusted to comply with separation recommendation. As a result of these separation conflicts, a total of 2 trees have been eliminated from the plan. The Tree Mitigation Table (on Sheet L100) has been adjusted to reflect these two losses. A total of 25 new trees are still planned for the project, which meets the tree replacement requirements established by the Forestry Department. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(a-fcflov.com Topic: Building Elevations Comment Number: 11 Comment Originated: 01/24/2013 01/24/2013: There are line over text issues on sheets AA-200 & AA-201. Response: Line over text issues have been addressed, see revised sheets. Topic: Construction Drawings Comment Number: 2 Comment Originated: 01/24/2013 01/24/2013: There are line over text issues on sheets C102, C203, C500, C501, C700 & C800. M/M Response: These line over text issues have been corrected. Comment Number: 3 Comment Originated: 01/24/2013 01/24/2013: There are text over text issues on sheets C500 & C800. MAW Response: These text over text issues have been corrected. Comment Number: 4 Comment Originated: 01/24/2013 Page 5 of 9 01/24/2013: Please check with our Utility Departments, for the current details for sheet C801. M/M Response: The Utility Details have been replaced with the current details. Topic: General Comment Number: 1 Comment Originated: 01/24/2013 01/24/2013: The top cover sheet index has many differences in the titles, and many missing sheets. Response: Sheet index has been updated, see revised sheet. Topic: Landscape Plans Comment Number: 5 Comment Originated: 01/24/2013 01/24/2013: There are line over text issues on sheets L100 & L202 L300 L301. Response: Line over text issues have been addressed, see revised sheets. Comment Number: Oron sheet L2024/2013 01/24/2013: Please mask all text Response: Corrected. Comment Number: 7 Comment Originated: 01/24/2013 01/24/2013: Please add the scale to sheet 1-301. Response: Scale added to title block. Comment Number: 8 Comment Originated: 01/24/2013 01/24/2013: Please remove the scale & north arrow from sheets IR-1 & IR-3. Response: Graphic scales and north arrows removed. Topic: Lighting Plan Comment Number: 12 Comment Originated: 01/24/2013 01/24/2013: No comments. Topic: Site Plan Comment Number: 9 Comment Originated: 01/24/2013 01/24/2013: There are line over text issues on sheets 1-101, 1-102, L103 & 1-200. Response: Line over text issues have been addressed, see revised sheets. Comment Number: 10 Comment Originated: 01/24/2013 01/24/2013: Please remove the north arrow from sheets L201, L203 & L204. Response: Graphic scales and north arrows removed. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanfordCa)fcaov.com Topic: Traffic Impact Study Page 6 of 9 Topic: General Comment Number: 7 Comment Originated: 01/25/2013 01/25/2013: Please use the City's standard sidewalk chase detail. MAW Response: The City's sidewalk chase detail has been added to sheet C80Z Comment Number: 8 Comment Originated: 01/25/2013 01/25/2013: Some proposed trees are located on top of the proposed private storm sewer. The City requires 10 feet separation for shade trees and 7 feet of separation for ornamental trees to public storm sewers. The City suggests considering future maintenance of the storm system with respect to proposed landscaping. Response: Three of the four trees in conflict on the north side of the building have been relocated. One of the four ornamental trees in conflict on the north side of the building was removed from the plan. One ornamental tree within the healing garden has been eliminated do to separation conflict. One shade tree within the healing garden has been change to an ornamental tree and its placement adjusted to comply with separation recommendation. Two ornamental trees west of the healing garden have been adjusted to comply with separation recommendation. One shade tree in a parking lot island has been changed to an ornamental tree and its placement adjusted to comply with separation recommendation. As a result of these separation conflicts, a total of 2 trees have been eliminated from the plan. The Tree Mitigation Table (on Sheet L100) has been adjusted to reflect these two losses. A total of 25 new trees are still planned for the project, which meets the tree replacement requirements established by the Forestry Department. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(cD-fc9ov.com Topic: Building Elevations Comment Number: 11 Comment Originated: 01/24/2013 01/24/2013: There are line over text issues on sheets AA-200 & AA-201. Response: Line over text issues have been addressed, see revised sheets. Topic: Construction Drawings Comment Number: 2 Comment Originated: 01/24/2013 01/24/2013: There are line over text issues on sheets C102, C203, C500, C501, C700 & C800. M/M Response: These line over text issues have been corrected. Comment Number: 3 Comment Originated: 01/24/2013 01/24/2013: There are text over text issues on sheets C500 & C800. MAW Response: These text over text issues have been corrected. Comment Number: 4 Comment Originated: 01/24/2013 Page 5 of 9 Comment Number: 1 Comment Originated: 01/23/2013 01/23/2013: No comments. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffincton(&-fccov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 01/24/2013 01/24/2013: Provide a plan and profile drawing for the 12" water main. M/M Response: A Water Plan & Profile Sheet has been added to the plans. Comment Number: 2 Comment Originated: 01/24/2013 01/24/2013: Contact me at (970) 221-6854 or rbuffington@fcgov.com to get the current C of FC Std Details. MAW Response: City of Fort Collins standard utility details have been added to the plans. Comment Number: 3 Comment Originated: 01/24/2013 01/24/2013: Show/label the air release valve near the north connection to the existing water main. M/M Response: The air release valve has been shown and labeled. Comment Number: 4 Comment Originated: 01/24/2013 01/24/2013: Move the curb stop to the landscaped area adjacent to the meter pit. MAW Response: The curb stop has been relocated to the landscape area. Comment Number: 5 Comment Originated: 01/24/2013 01/2412013: Please call or schedule a meeting to discuss the connections to the existing main and the sequencing of constructions. M/M Response: Water connections have been revised per a phone conversation with Roger Buffington with the City of Fort Collins. Comment Number: 6 Comment Originated: 01/24/2013 01/24/2013: Label the tees for the fire hydrants as swivel tees. M/M Response: The fire hydrant tees have been labeled as swivel tees. Comment Number: 7 Comment Originated: 01/24/2013 01/24/2013: It appears that easements are needed for the sanitary sewer in two locations as noted on the redlined utility plans. M/M Response: A utility easement dedication request will be submitted for approval and the written legal and easement exhibit is in process with the project surveyor and the easement dedication will follow this submittal. Comment Number: 8 Comment Originated: 01/24/2013 01/24/2013: On Sht C400, there are some references to notes that appear to be incorrect. M/M Response: The note references have been corrected. Comment Number: 9 Comment Originated: 01/24/2013 01/24/013: On Sht C401, the water main crossing in the sewer profile is shown with only 3.5 Page 7 of 9