HomeMy WebLinkAboutLEMAY LTD LOT 1 816 SOUTH LEMAY - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-12-19F6rt
City of
Collins
Engineering
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 3' Issuance Date: ! Z Z 3 %3
Project Name: Fort Collins Veterinary Emergency and Rehabilitation Hospital
Project A.K.A.:
Project Location: 808 & 816 S. Lemay Ave Fort Collins, CO
Permittee: Dan Krieger, Dohn Construction
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 470 00
Total $ 870.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 751740
Form of security deposited with the City: Check #1074
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
Development Construction Permit, Page 2/7
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project (utility
plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study,
drainage report, plat easements and any other official documents), shall be kept on the development
site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 ofthe Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this pen -nit shall expire one year from the date of issuance. The applicant may
apply for an extension by reapplication at least two weeks prior to the expiration date. Such
application shall contain information sufficient to justify the granting of the extension. An
extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained in
the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion ofpublic improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior to
the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements are
completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/7
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
1 1. MAINTENANCE GUARANTEE:
The undersigned hereby warrants and guarantees to the City Of Fort Collins, for a period of two (2)
years from the date of completion and first acceptance by the city of the improvements warranted
hereunder, the full and complete maintenance and repair of the improvements constructed under the
authority of this Plat. This warranty and guarantee is made in accordance with the City Of Fort
Collins Land Use Code and/or the Transitional Land Use Regulations, as applicable. This guarantee
applies to the streets and all other appurtenant structures and amenities lying within the rights -of -way,
easements and other public properties, including, without limitation, all curbing, sidewalks, bike
paths, drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any maintenance
and/or repair required on utilities shall be coordinated with the owning utility company or department.
The undersigned shall maintain said improvements in a manner that will assure compliance on a
consistent basis with all construction standards, safety requirements and environmental protection
requirements of the city. The undersigned shall also correct and repair, or cause to be corrected and
repaired, all damages to said improvements resulting from development -related or building -related
activities. In the event the undersigned fails to correct any damages within thirty (30) days after
written notice thereof, then said damages may be corrected by the city and all costs and charges billed
to and paid by the undersigned. The city shall also have any other remedies available to it as
authorized by law. Any damages which occurred prior to the end of said two (2) year period and
which are unrepaired at the termination of said period shall remain the responsibility of the
undersigned.
12. REPAIR GUARANTEE:
In consideration of the approval of this final plat and other valuable consideration, the undersigned
does hereby agree to hold the City Of Fort Collins, Colorado, harmless for a five (5) year period,
commencing upon the date of completion and first acceptance by the city of the improvements
constructed under the authority of this plat, from any and all claims, damages, or demands arising on
account of the design and construction ofpublic improvements ofthe property shown herein; and the
Owner furthermore commits to make necessary repairs to said public improvements, to include,
without limitation, the roads, streets, fills, embankments, ditches, cross pans, sub -drains, culverts,
walls and bridges within the right-of-way, easements and other public properties, resulting from
failures caused by design and/or construction defects. This agreement to hold the city harmless
includes defects in materials and workmanship, as well as defects caused by or consisting of settling
trenches, fills or excavations.
Further, the undersigned warrants that he/she owns fee simple title to the property shown hereon and
agrees that the City Of Fort Collins shall not be liable to the undersigned or his/her successors in
interest during the warranty period, for any claim of damages resulting from negligence in exercising
engineering techniques and due caution in the construction of cross drains, drives, structures or
Development Construction Permit, Page 4/7
buildings, the changing of courses of streams and rivers, flooding from natural creeks and rivers, and
any other matter whatsoever on private property. Any and all monetary liability occurring under this
paragraph shall be the liability of the Owner. I further warrant that I have the right to convey said land
according to this Plat. The obligations of the undersigned pursuant to the "Maintenance Guarantee"
and "Repair Guarantee" provisions set forth above may not be assigned or transferred to any other
person or entity unless the warranted improvements are completed by, and a Letter of Acceptance of
the warranted improvements is received from the city by, such other person or entity.
13. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
14. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority ofthe
owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property
to perform work required of the applicant if the applicant were to fail to perform the required work. I also
acknowledge that I have read this permit document with all its requirements and conditions, and I
agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: ' Date: t2 0l
Approval for issuance:
City Engineer Approv Date: 1 yl � &//,3
K C"_ / (Permit Issuance Date)
71
Development Construction Permit, Page 5/7
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Prospect Station
City Staff Contact Persons:
Development Engineer: Andrew S. Gingerich, P.E.
281 North College Avenue, Fort Collins, CO 80524
970 221-6567
Construction Inspector: Steve Cicione
281 North College Avenue, Fort Collins, CO 80524
970 692-4418
Current Planner: Seth Lorson
281 North College Avenue, Fort Collins, CO 80524
970 224-6189
Water Utilities Engineer:
Erosion Control Inspector:
Roger Buffington
700 Wood Street, Fort Collins, CO 80521
970 221-6854
Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970 218-2932
Natural Resources: Lindsay Ex
281 North College Avenue, Fort Collins, CO 80524
970 221-6143
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Development Construction Pennit, Page 6/7
Forestry: Tim Buchanan
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Project Manager: Dan Krieger, Dohn Construction
2642 Midpoint Dr. Fort Collins, CO 80525
O 970-490-1855
C 970-566-7355
F 970-490-6093
dkrieger@dohnconstruction.com
Developer: Jon Geller
Fort Collins Veterinary Emergency Hospital, LLC
816 S. Lemay Ave. Fort Collins, CO 80524
O 970-484-8080
F 970-484-8111
fcverh@gmail.com
Owner(s): Jon Geller
Fort Collins Veterinary Emergency Hospital, LLC
816 S. Lemay Ave. Fort Collins, CO 80524
O 970-484-8080
F 970-484-8111
fcverh@gmail.com
Planner: Alan Hauser
Hauser Architects, P.C.
3780 E. 15`h Street, Suite 201
O 970-669-8220
al@hauserarchitectspc.com
Project Engineer: Patricia Kroetch, P.E.
North Star Design
700 Automation Drive, Unit I
O 970-686-6939
F 970-6861188
tricia@northstardesigninc.com
Development Construction Permit, Page 7/7
General Contractor: Dan Krieger, Dohn Construction
2642 Midpoint Dr. Fort Collins, CO 80525
O 970-490-1855
C 970-566-7355
F 970-490-6093
dkrieger@dohnconstruction.com
SOUTH LEMAY AVENUE,
B ''<a yQtB 4q
Y9 c v�
;�u o='
I JI
n
i
-ale
\ I
_
{
v
$
P
m
o
ec
pFe —"s
�
2N�
a
I� mR
mx 411
4F as
_...-
1.... :�
co O
-
cn
j
m
I
moo
1
_
m FORT COLLINS VET EMERGENCY
"° aEllslo"
` HOSPITAL & REHAB CLINIC
S
S q�P
i„
-
North Star
_ GRADING & UTILITY PLAN
s�S
ole: _m
'�� design, Inc.
by. pp,
—_
goo niblo„nI or1 uarll
w,d�o�. col a ecsso
�.� tl UR
t
VM1one. 9)D-686-65P
Fax: 0]0-686-1188
"PROJECT QUANTITIES AND COST ESTIMATE SHEET"
FORT COLLINS VET EMERGENCY CLINIC c o
E E
t � H
DESCRIPTION FM =EAED
a (LIST ALL PUBLIC AND APPLICABLE Y INFRASTRUCTURE TOTAL INSPECTIOIMAI FEE PER N TOTAL
`PRIVATE IMPROVEMENTS) ED BY THE COST PERCONSTRUCUNOIT NFTRASTRUCTURE (PROV DED IT EEPECTION
e ECT ENGINEER OF MEASURE COST
(COST ESTMATE BY THE CITY)
APPROVED BY THE
CITY)
e Reinforced Concrete Pipe
L.F.
,a Trench0
L.F.
$0.00
$0.00
$0.70
n Concrete Headwall
C.Y.
0
$0.00
$0.00
$3.50
$0.00
12 Water Quality Outlet Structure
0
$0.00
$0.00
$3.50
$0.00
,5 All Inlet Types (Sidewalk Chase)
EACH
0
$0.00
$3.00
$0.00
is Manhole
EACH
1
$2,0$0.00
00.00
$2,0$0.00
$103.00
0
$0.00
$0.00
$103.00
03.00
$103.00
Water & Sanitary Sewer
$0.00
Sanitary Sewer Main
L.F.
Water Main
L.F.
0
$0.00
$0.00
$0.70
Water/Sewer Main (Trench)
L F
0
$0.00
$0.00
$0.70
$0.00
Water/Sewer Service Line Stub (Trench)
L.F.
0
$0.00
$0.00
$0.70
$0.00
Fire Hydrant (Trench)
0
$0.00
$0.00
$0.70
$0.00
Manhole
EACH
0
$0.00
$0.00
$0.00
, Valves
Meter Pit (1")
EACH
0
0
$0.00
$0.00
$0.00
03.00
$103.00
$0.00
$0.00
Fitting ( Bend, Tee, Cross)
EACH
EACH
0
$0.00
$0.00
$0.00
$70.00
$0.00
Water Main Connection
EACH
0
$0.00
$0.00
$35.00
$35.00
$0.00
0
$0.00
$0.00
$35.00
$0.00
Street System
$0.00
Grading
L.S.
Pavement
S.Y.
0
$0.00
$0.00
Curb & Gutter
L.F.
0
$0.00
$0.00
$0.45
Detached Sidewalk
L F
8
$12.00
$96.00
$1.00
$0.00
Pedestrian Ramps (3)
L.F.
104
$22.60
$2,350.40
$1.00
$70.00
Apron/Approach
S.Y.
18
$154.00
$
$1.45
$$70.00
Crosspan
S.Y.
46
$6.50
$299.00
$2$0.00
$0.45
0
$0.00
$0.00
$0.45
103.00
$1$0.00
$0.00
TOTAL INSPECTION' FEE
$470.00
TOTAL PUBLIC INFRASTRUCTURE
COST
R. Mosbey - 11/26/2013
PRIVATE IMPROVEMENTS REQUIRING CITY
$7,51740
� ...
IN THE TOTAL INFRASTRUCTURE COST
INSPECTIONS WILL NEED TO BE INCLUDED.
HOWEVER
PRIVATE IMPROVEMENTS
FOR
BONDING.
WILL NOT INCLUDED