HomeMy WebLinkAboutPROSPECT STATION - Filed E-ELEVATION PLAN - 2013-10-31Planning Keynotes
KNchrtectural steel canopy with full cut-off wall wash light
fixture to accentuate public art, Typical at three (3) koations
on North wait.
i 2 > Proposed Public Art Location for separate approval.
g� Future Transfort Public Bus Stop with shatter, by others
\ 4� Painted steel frame with metal screen infill to match adjacent
` storefront windows. Three (3) locations into open parking
garage,Typ.
5 opportunity.
Steel handrail painted. Potential for public art
t3❑ Fixed Bicycle parking rack
< 7> Gas meters
8�> New electrical switch gear or pad mount transformer
�g❑ Suspended parking lot signage.
� 1Hanging Bike racks: Covered, and secured.
�� Steel tube roof brace kicker, painted bronze.
`12 Exmoor retail signage shown for representation only, not for
L approval. Sign submittals & permits by others.
1 Mechanical well with mansard roof all around to fWly screen
all mechanical equipment.
`4 ? Electrical meter stacks for each unit, paint to match adjacent wall.
ii
' For full system notes rater to AO.2
Field Brick Vensa: Standard, running bond
Mortar: Integral color mortar from Davis Color selection
Field
W1,I Accwkt Brick Verow: Standard, running bond
Mortar: Integral color mortar from Davis Color selection
Accent
I 'J Reld color: Serergy hard coat stucco, Light Color TBD
Field
Accent color: Semergy hard coat stucco, Dark Earthrone
Color TBD
Accent
WlBoard 6 Baden: Hardi panel, painted
W4 4" rMbrd $Igrle Band
i
R1 Profirdshed Mslat Stardng aian: Berridge 'Copper Cote',
24ga. Brake Metal Shapes: Berridge 'Copper Cote', 24 ga.
- p I m e lrtcclln shi shingle.
AN roof penatraUar aW vents
TPO Mw dx no Roof: Tan with SR to meet LEED
u 9lendards
F1 concrete Slab -on -Grads:
421Concrete waNrs:
�_ Standard gray W light broom finish
STRD.
Carcrob walks:
Integral colored w/ light broom finish, Color TBD Davis Colors
Color
❑F Exterior Decks:
514" Trex deck material over Pressure treated joist framing
2nd Floor:
In] Concrete floor over metal deck, 3-hour rated assembly
f FG]Wood Floor Struckne:
1-1/2" Gyperete over 3/4" substrate over TJI floor joists
per Strict.
Vinyl WkMows:
Atrium siding, fixed and siding windows,' White'
Patio Door*:
Atrium sliding patio doors, White
Aluminum Storefronts:
Doorways: TubelNe medium stile, Medium Bronze aluminum finish
Gerep opw* Ds:
Steel tube frame, painted to match adjacent storefront systems
Dadk ratting, guards and arrbhtda:
Powder coated, Bronze to match Storefront bronze
Steel roof bracir te:
Painted, Bronze to match Storefront bronze
Door*, gabs wid mtec.:
Panted, Bronze to match Storefront bronze
Exposed Vohs, foss, conduit, boxes and n WAn
Painted, to match adjacent materials.
West Prospect Road
• -- - 6
is Ramp F2�
• iI DN
-- STRD. _ -- - -
I
• Ram �� ' _% �❑ r
P
DN o
— — -
X
ti- - -- T f
1
i 2� � �4}-- 2 ( � o � 2 � 1� i <4�
-
�'� a
Retail
RDNp ---F
- I
-i
I
I
i
I
11
�o
IJ
I i�li I Ili
I
I> UPI Retail
- � I
i
• � Suite 101
•
I
•
•
• r1IR
DN
I
' II
One way traffic
Exit Only
Trash ti Recycle
Fire
)
Riser
Room
[�6>
[RI
STRD.
0
N
LF? '
color
�I:Ilm
Ramp DN
Pipe Bollards _ - -
i� F21
STRD.
�✓ Cg
Electrical 1�
Room �
W
❑�
/ W
Pipe Bollards
�- - -- - - -
c c c l c c c c-
i
/ o O •
f ' �
1� ��� i •
Water Water Oualiry I
Quality
I � ,
1
I
i
hill
i
III ❑ Al 2
7 r� 0 F1 •
I
J u One One - - Y/ --
Entrance Only - ❑
Vehicle ParkhM Counts Bicycle PeMna Counts •
Comoact Parkins Spaces Fixed Bike Spaces STRD i •
10 Spaces 19 Spaces Required: 24 Spaces provided ❑ m
Standard Parking Spaces Bollard Racks for Retail F
25 Spaces 4 Spaces Required 4 Spaces provided ili •
Covered Handicao Par kin Bike soaoss in the Riaht of Way (Not counted towards Reds)�\ f ® J ❑ •
2 Spaces None Required 8 Spaces provided r �1 - -
Offshe Standard Parkin Sh>aces Secure/enclosed Bike Storage for Tenants (See A2 for breakdown) h,u
11 Spaces 30 Spaces Required 30 Spaces provided w •
�I A101 -
I I
dO
i I
®c - - •
Partial height will.
i--•-f�-•--•�--��-� a S . S"-•-•-�- S-s .. • �!_• . .. .. • • 41111111111111111 ._ . . • 11111111111111110- • • 41111111111111111 • • • .--- • •
Planning -_Ground Floor Plan
\1 1"=10'-0. - -
226 Remington Sc
Unit *3
Fort Coffim, CO 80524
plane 970.2240630
www.amch.o
In Association With:
PrDspe(,i Station, LLC Owner
2642 Mi", Drive, Urik A
Fat Colim, CO 8D525
(970)490-1855
Contact Doug Dohs
Erral: ddolin0doMtmrewction.can
Dohn Condirtwtion General Contractor
2642 hidpoin Drive, Unit A
Fort Collins, CO 80525
CWwt Doug Dohn
19 Oki Town Square, Suk 238
Fort Coins, CO 80524
(970) 566-M
CmW: Blake Larsen
Errat Mak4lasemd.00m
AE AgtioCMN
mii rA erlical Engineer
---
5587 West 19M Street
Gwivy, am
(970) 330.5587
contact: Abe Tho"
Breil: aid& thorpe@aeassodates.net
APS - -
Electrical Engineer
6931 Broadway
Darner, CO 8=1
(303) 287-8091
Cantact: ciuc k Potion
Breit: chudt kpsr c.biz
TBGroup-Lendtiplpe
Archbd
444 Maintim Ave.
Berthad, CO 80513
(970) &V-5 1
Carrtad: celhy mdn
Breit: cat hylililbprap.us
NMerwest
CMI Engineer
1218 nth Street
Wihdeor, CO WM
(970) 674-M
Cmdaot: Mks Obedander
BroN: ff*ber*dw@hftrasIgrp.oan
Prospect
Station
221 Prospect Road
Fort Collins, CO 80526
NO. Description Date
1 Final Plan Submittal 7/3/2013
2 Final Mylar 9/11/2013
Final Mylar
Project No.: 21112-24 Drawn by: SA
Revlswed by: MR
Ground Floor Plan
scats Accordingly a Reduced
T Al -
P-156 2691 -J
Planning Keynotes
K :
< 1 Architectural steel canopy with full out -off wall wash light
fixture to accentuate public art, Typical at three (3) locations
on North wait.
Proposed Public Art Nation for separate approval.
3 Future Trensfort Public Bus Stop with shelter, by others
3
Painted steel frame with metal screen inilt to match agacenl
storefront windows. Three (3) locations into open parking
garage, Typ•
S\\ Decorative Steel handrail painted. Polential for public art
</ opportunity.
`� Fixed Bicycle parking rack
Gas meters
\/ New electrical switch gear or pad mount transformer
Suspended parking lot signage.
10 Hanging Bike racks: Covered, and secured.
„. Steel tube roof brace kicker, painted bronze.
Exterior retail signage shown for representation only, not for
`11 2current approval. Sign submittals & permits by others.
13 Mechanical well with mansard roof all around to fury screen
all mechanical equipment
14 > Electrical meter stacks for each unit, paint to match adjacent wall.
oval MMerlals:
For full system notes refer to Ao.2
CAL Meld Brick Venser: Standard, running bond
Mortar: Integral color mortar from Davis Color selection
Field
Acre rN Brick Veneer: Standard, running bond
Lv ' Mortar: Integral tour mortar from Davis Color selection
Accent
"- FlNd color: Senergy hard coat stucco, Ught Color TBD
Field
CAcrm color: Senergy hard coat stucco, Dark Earthtone
Color TBD
Accent
Board & Batten: Hardi panel, painted
W1 r. NeMtl q M Bend
R1 lPreafkdelred Metal Standing seem: Berridge 'Copper Cote',
24ga. Brake Metal Shapes: Berridge 'Copper Cote', 24 ga.
L�� P rrelcr shirngN.: AN rani penetrations end venue
DTPO Mernbrans Roof: Ten with SM b meet LEED
Standards
H Pon NWOdda:
Concreb slebon4rads:
F2] Controls walks:
Standard gray w/ light broom finish
STRD.
CJConcremwaft:
Integral colored w/ light broom finish, Color TBD Davis Colors
Color
L' Exterior Decks:
514" Trex deck material over Pressure treated joist framing
11411 2nd Floor:
Concrete floor over metal deck, 3-hour rated assembly
LFGL wood Floor Structure:
1-1 /2" Gyperete over 3/4" substrate over TJ I floor joists
per Stmct.
Vlrryl Whidowe:
Atrium siding, fixed and siding windows, 'whtW
Patio Doors:
Atrium sliding patio doors, 'whte'
Akaninum Storefronts:
Doorways: TubeNte medtum stile, Medium Bronze aluminum finish
aww openkW:
Steel tube frame, painted to match adjacent storefront systems
Deck rolling, guards wW errrI J :
Powder coated, Bronze to mach Storefront bronze
SW roof brackets:
Painted, Bronze to match Storefront bronze
Doan, Metes and inlec.:
Painted, Bronze to match Storefront bronze
Expow d Vents, furs, conduit, boxes and ureters:
Painted, to match adjacent materials.
L
F3 F51
ei M
'Ile 202 Unk 204
1 Bedroom 2 Bedroom
-- - -� 5 2nd Floor
F3� 3rd & 4th Floors
-uesrvpi
w.rduhs.
ddraw-
sanaw..a
1 Bedroom.
1 We
, eediowe
-
2 Bedmm:
1 Wa
2 Bedodle
-
3Bedmm:-—
Lianr
8 tn1W
8 Bdmnw
6 spares
IBedroom:
2
2 Bedaom
2 espies
2 Bdaom:
rtrued:
8 Un b
12 Bed, s
12 spouse
3 Bedodn:
1lAib --
3Bedrooms -
3apams - -
9lutl10:
6 Urib
6 Bedaonw
6 spaces
1 Bedoom:
2 te:t
2 Bedown
2 spaces
2 Bedro
6 ib Lh
12 Bedroo"e
12 spa
3 Bedroom:
---
1 lino
--
-12
3 Bedpono
-
3 spa
-
IF
ydp
W is
12 Bedro
12 spsoet
1 Bedpom:
5 Uoib
5 Bedroom
5 spaces
2 Bedaom:
13 tLdb
28 eedreome
28 epecee
3 Bedreprri:-
-
— - 32 � _ —
9 BKV b _
_
r
- I [F5]
n h mot=
I �
2 Bedroom
Type 'A'
[' 3] LF3
Unit 214
1 Bedroom
<,o
lithe
l
a
.�
nth 209
Studio
Y211
-
r.; Studio
,
l
o
T
NN
e eL
t
Irv..:.... -
kll 215
Studio
r
,,
_Planning -kcal Residential Floor Plan -
1 1" = 10'-0" - --
226 Remington St.
Unit #3
Fmt Collim CO 80524
phase 97Q224-0630
ww Amch.can
In Association with:
Prospect Stetson, LLC
Owner
- --- -
2642 Mdpoin Drive, Unit A
Fort Caere, CO W525
(970)490.1855
Casact Dap Dohn
Email: dasxt@dohnoxisouchon.can
Donn Coratniction
General Conlredor
---
2642 Moxiis Drive, Unt A
Fos Coors, CO f1 M
(970)490.1855
Contact Doug Doln,
Email: diohrilikkifinoorotruction.can
Larsen MUCk al Design
—
91nlclural Engineer
- — — --
19 Old Town Square, Suile 236
Fort Cuero, CO W524
(970) 568-M
Contact: Blake Larsen
Finag: Blake araersd.can
AE Anodeles -
Medlenicel Engineer
5587 Weer 19th Street
OreebY, CO 60634
(970) =)-& 7
Casact: Alicia Thorpe
Email: aide.t1iorpe@e9asocalsanet
AM
Ebdrkal Engineer
6931 Broadway
Denver, CO Wl
(303) 287-Ml
Contact: Chuck Polion
Emai: dhuckftencbiz
TB Group -
Landscape Ardtiled
444 Mountain Ave.
Berthoud, CO f10513
(970) 532-50
CwW: Cathy Madhie
Finatt ca*yftgmup.us
kllertiest Consuf ills
-- Civil Engineer
1218 Ash Street
Windo, CO am
(970) 674,=
Contact: Mike Obedmder
Email: moberlordai0ftwasOP.Will
Prospect
Station
221 Prospect Road
Fort Collins, CO 80526
Issued
No. Dreo r iptlon Date
1 Final Plan Submittal 7/3/2013
2 Final Mylar —-9/11/2013
Final Mylar
Protect No.: 2012-24 Dawn by: SA
ReNewed by: MR
Levels 2 & 3, Typical
Residential Floor Plan
Scats Accwdluugry n Reduosd
Drawing Number
- A2 -
P- 156 2691
No Text
No Text
Planning Keynotes
Keynotes:
Architectural steel canopy with full cut-off wall wash light
fixture to accentuate public art, Typical at three (3) locations
on North wall.
�y Proposed Public Art Location for separate approval.
Future Transfort Pudic Bus Stop with shelter, by others
Painted steel frame with metal screen infiII to match adjacent
storefront windows. Three (3) locations into open parking
germs, TYp-
< 5 > Decorative: Steel handrail painted. Potential for public art
opportunity.
lJ Fixed Bicycle parking rack
\<'7'�> Gas meters
�> New electrical switch gear or pad mount transformer
<, 9 Suspended parking lot signage.
10 Hanging Bike racks: Covered, and secured.
" � Steel tube root brace kicker, painted bronze.
<�1> Exterior retail signage shown for representation only, not for
/ current approval. Sign submittals & permits by others.
<*> Mechanical well with mansard roof all around to fully screen
all mechanical equipment.
j Electrical meter stalks for each unit, paint to match adjacent wall.
!ll�.Ifalldlla:
` For U1 system notes refer to AO
Field Brick Veneer: Standard, running bond
IM] Mortar: Integral color mortar from Davis Color selection
Field
I* Accerrt Brick Veneer: Standard, running bond
J Mortar: Integral color mortar from Davis Color selection
Accent
FiNd color: Senergy hard coat stucco, Light Color TBD
Field
*Accsrrt color: Senergy hard coat stucco, Dark Earthtone
Color TBD
Accent
LW3] Bard & Bsuen: Hardk panel, painted
W4 4" Nsbaal Slane BMW
Pre4kfthed MeW Stardrrg sewn: Benidge'Copper Cole',
R1 249a. Brake Metal Shapes: Benidge'Copper Cote', 24 ga.
(F112 pstrAsd iruatclu shingle.: M rod p.rr.traaorr. and vents
TPO Merbrans Rod: Tan wkh SM to meet LEED
^�J slander A
Floor IrMtiels:
FJ ConcMe Sheb-onOrade:
))Concrete walla:
Standard gray w/ light broom finish
STRD.
Concrete walks:
Integral colored w/ light broom finish, Coker TBD Davis Colors
Color
Exterior Docks:
514" Trex deck material over Pressure treated joist framing
F5] 2nd Floor:
Concrete floor over metal deck, 3-hour raked assembly
IN]
�� Wood Floor Structure:
u 1-1/2" Gyperete over 314" substrate over TJI floor joists
per Strict.
Vinyl widows:
Atrium slicing, fixed and sliding windows,' White'
Paco Doors:
Atrium sliding patio doors, White
AkxMnum Storefronts:
Doorways: Tubelie medium stile, Medium Bronze aluminum finish
Garage cgs:
Steel tube frame, painted to match adjacent storefront systems
Dock raiarrg, quords and err I a I :
Powder coated, Bronze to match Storefront bronze
Slesi roof Draclre, :
Painted, Bronze to match Storefront bronze
Doors, gales and misc.:
Painted, Bronze to match Storefront bronze
Exposed Vents, fins, conduit, boxes and rnelex
Painted, to match adjacent materials.
G� CFE) �D) (C) (B(A)
� FM
`-� East Building Elevation
1 1/8" = 1'-0"
B(E) � )
R1
R21
i
226 Ramngm St.
Unit e3
ibn Coltim, CO SW24
play 9702240630
www.r =&c
Roof
43' - 1 1 /8"
late Height OL�
33' - 88 1/�'
In Association with:
Prospect Stour, LLC Owner
2642 Mdpdre Drive, Unit A
Foe Cols, CO 80525
_Level 3
(970)490-1855
Caeact Doug Dohn
24' - 7 1 /8"
Email: ddohn@d0nmro6ucdon.com
DOM Wolnlal m General Contractor
2B42 M*0 Drim, fhme A
Fat Colbs, 00 W525
(970)490-1855
Confect Doug Dohs
Level 2
Email: dd&m@ddwwxMrxbm.com
13' - 9 3/4"
Larsen StntcttirM Design Stnlehiral Enginw
Le 1
0' - 0"
_ Roof
43'-111V
plate Height r
33' -
19 Old Town Square, Suite 23B
Fat Colas, CO 80524
(970) 588-3M
Coriw: We Larsen
Erred: blelasillikirsenad.com
AE A990CMes
Medw ical Engineer
5587 West 19th Sleet
0reeby, CO W834
(970) M-55V
Coda is Aliia Thape
Email: akia.thape@aesseodetes.net
APS
Eb ritatl Engineer
8931 L3toedway
Denver, CO 8=1
(3W) 287-8091
Contact: Chuck Polm
Snail: duclOspektc.liz
TB Group
Landscape Architect
4" Mpxeain Ave.
Berthoud, CO W513
(970) 5U-W
Cww: Cxfty Ma1Ne
Ewes: catIftgatp.ms
Irilerrtest Conwlgnta
aril Eriow
1218 Ash Street
Window, CO 80550
(970) 674-M
Canact: MM Oberlander
Eni&. .corn
Prospect
Station
221 Prospect Road
Fort Collins, CO 80526
Level 3 - Issued
24'
No. Description Date
1 Final Plan Submittal 7/3/2013
2 Fnal Mylar 9/11/2013
Level 2 �1
13'-93%4"-v -
Level 1
0'-on
2 West Building Elevation
11/8" _ 1' p" - -----
P-156 2691
Final Mylar
P►ojeCt No.: 2012-24 Drawn by: SA
Reviewed by: MR
Exterior Elevations
Diswig MR"
- A5
Sari Pmwd n* N Reduced
�— Shadow &- Visual Analysis General Notes
Ne� I strictures shown in the background have been modeled using the best
(hV information available to us at the time. r4 Architects has used aerial photographs to
determine adjacencies of the occupied buildings. In addition, we have replicated the
building massing and fenestration from photographs, site observation and traditional
constriction practices for height and roof slope.
r PtiO.IEt:TBUWAIiY:
l r4 A chitacts has developed a visual analysis that identifies the extent to which
existing views may be blocked. Our project is infill on an site with an existing small
Cl coffee shop along the new Mason Street corridor. Our project is placed five feet off
the South property boundary to allow southern windows and p
plaza Wong Prospect Road. The project will havedefined plaza
a a pedestrian
pllaza and patio that front
both Prospect Road and the Mason Street corridor. This activity rode contains a
provisions for a local bus stop, direct access to the MAX, adjacent bike/pedestnan
path, retail on the dominant corner, and live/work units on the ground floor.
Surrounding properties include a surface parking lot and the Griffin Foundation on
the West, the Mason Street Corridor on the East and CSURF property to the South.
The North boundary is bordered by West Prospect Road and is not affected by our
projects location.
local businesses and retail locations are the only occupied structures which are
adjacent to our project. Our project has negligent visual impact on the local
businesses. Vista views towards the mourhatlos has minimal impact based on the
location of the Proposed structure and the existing large trees.
No existing views from the Fast, North or South are affected by our proposal.
r4 Architects has developed a shadow analysis based on the available information
for assumed locations and construction of adjacent structures and the observed
grades. Winter shadow conditions are based on December 21st at incremental
times, 9am, 12 noon, and 3pm.
Based on our analysis, the proposed project does NOT have an adverse affect on
adjacent Public and Private property as defined in the LUC. Our shadow impact
occurs each day doing limited winter months on west Prospect road to the North.
Retail buildings on the north side of Prospect are the only occupied structure within
our cast shadows and are minimally impacted during short periods of lime during
winter months. Our Proposed Project has negligent impact during portions of 3
winter months and at limited hours in early morning and late afternoon. Storefront
windows on the ground floor are intermittently in shadow beginning at gam and
progressing across the butting as tine sun changes position. We will not have
impact and will have adequate solar gain in the morning and early afternoon in these
months. The proposed project has been sited to the southern property line and
Provides proper setbacks along Prospect road.
PROPOMES
Design considerations to minimize our solar and visual Impact on neighboring
properties include the following:
• Incorporating substantial building setbacks on the North property line 10
maximize Pedestrian interaction with the site.
• A public plaza has been designed along the north and east frontages to
Provide a Pedestrian zone between sidewalks and the existing bike path.
• Oportunities for public art have been identified along the north frontage.
Unit design to incorporate the use of HVAC units to be located on the
rooftop within a mechanical well surrounded by a mansard roof to
completely screen all mechanical equipment.
• Changes in massing and material are Incorporated on all fasades for
Architectural and visual intrest.
• Condexturel roof forms using flat and sloped roofs with both metal and
asphalt roofing a".
• Use of pedestrian scale canopies, entry canopies and intricate deck railings
to provide visibility out and Intrest to our project.
Summer gam
a 4
t
!
Summer 12pm
jr
J Ytr A—
.Moak.r .-
Summer 3pm
kq
It 4I
ti
r
Winter gam
6
M-nter 12pm
e
7.0�.
Winter 3pm
( :
i
t
226 Rrn Stm St.
Unit a3
Port Collins, CO 8W24
phone 970l224-0630
www.Awch.c
In Association with:
Salton, LLC
Owner
2642 1101100int Drive, link A
- -
Fort Coin, CO 80525
(970)441855
Contact Doug Dohn
Email: ddohn@dohnoorswcoonn wm
Dohn Conshue ion
GNOMI COWNtor
2642 Midpokd Drive, Urhit A - - -
- - -- --- -
Fort Crites, CO 80525
(970)49g-1855
Comact Doug Dohn
Ernst: ddohnDdolxroonetrhx�orh.com
U new Stndehnl DeeW
Wiftnl Engineer
19 Old Town Squire, Sub 238
- -
For Collins, CO 80524
(970) 568MM
Combo: Sake Lamm
East. bWo@kmmW.com
AE As socieMs
-
Mechanical Engineer
5587 Wed 19th Street
-- -
awlay, CO 80634
(970) 330d58'7
Contact: Alicia Thorpe
Email: afide.titorye@aeeaeociew.net
APS
EMch* Enginm
—
0931 Broadway
-
Denver, CO 8=1
(303) 287A091
Coraact: Chuck Pokon
Emat: chicleapaix.biz
TB Cargup
LefldaW AfdWW
444 Maadein Ave.
-
BerBhoud, CO 80513
(970) 532-Ml
Caw: Ca ft Meft
Email: cath t()'Ibgroup us
hNerrrest Caneit is
Civil Eng nw
-
121e Aeh street
-
wtideor, CO 80550
(970) 674-M
Coraact: Mks Oberbnder
Email: mobbbnderijilrdavesgrp.wm
Prospect
Station
221 Prospect Road
Fort Collins, CO 80526
No. Description Dab
1 Final Plan Submittal 7/3/2013
2 Final Mylar 9/11/2613
Final Mylar
Protect No.: 2012-24 thsam by: SA
Review by: W
Shadow Analysis
Scab Aoeovdingly if Reduced
-A6-
P-156 2691
Shadow & Visual Analysis General Notes
Neighboring structures shown in the background have been modeled using the hest
information available to us at the time. r4 Architects has used aerial photographs to
determine adjacencies of the occupied buildings. In addition, we have replicated the
bulking massing and fenestration from photographs, site observation and traditional
construction practices for height and roof slope.
r4 Architects has developed a visual analysis that identifies the extent to which
existing views may be blocked. Our project is infill on an site with an existing small
coffee shop along the new Mason Street corridor. Our project is placed five feet off
the south property boundary to allow southern windows and provide a pedestrian
plaza Wong Prospect Road. The project will have a defined plaza and patio that front
both Prospect Road and the Mason Street corridor. This activity node contains a
provisions for a local bus stop, direct access to the MAX, adjacent bike✓pedestrian
path, retail on the dominant corner, and live/work units on the ground floor.
Surrounding properties include a surface parking lot and the Griffin Foundation on
the West, the Mason Street Corridor on the Fast and CSURF property to the South.
The North boundary is bordered by West Prospect Road and is rat affected by our
projects location.
kcal businesses and retail locations are the only occupied shuctures which are
adjacent to our project. Our project has negligent visual impact on the local
businesses. Vista views towards the mounatins has minimal impact based on the
location of the proposed structure and the existing large trees.
No existing views from the East, North or South are affected by our proposal.
SHADOW ANALYSIS SUIIIIIIIIIiIIARY:
r4 Architects has developed a shadow analysis based on the available information
for assumed locations and construction of adjacent structures and the observed
grades. Winter shadow conditions are based on December 21 at at incremental
times, 9am, 12 noon, and 3pm.
Based on our analysis, the proposed project does NOT have an adverse affect on
adjacent public and private property as defined in the LUC. Our shadow impact
occurs each day during limited winter months on west Prospect road to the North.
Retail buildings on the north side of Prospect are the only occupied structure within
our cast shadows and are minimally impacted during short periods of time during
winter months. Our proposed project has negligent impact during portions of 3
winter months and at limited hours in early morning and We afternoon. Storefront
windows on the ground floor are intermittently in shadow beginning at gam and
progressing across the builkrg as the sun changes position. We will not have
impact and will have adequate solar gain in the morning and early afternoon in these
months. The proposed project has been sited to the southern property lice and
Provides proper setbacks along Prospect road.
Design considerations to minimize our solar and visual impact on neighboring
properties include the following:
• Incorporating substantial building setbacks on the North property line to
maximize pedestrian interaction with the site.
• A public plaza has been designed along the north and east frontages to
provide a pedestrian zone between sidewalks and the existing bike path.
• Oportunflies for public art have been identified along the north frontage.
• Unit design to incorporate the use of HVAC units to be located on the
rooftop within a mechantcel well surrounded by a mansard roof to
completely, screen all mechanical equipment.
• Charges in massing and material are Incorporated on all fasades for
Architectural and visual intrest.
• Conlextural roof forms using flat and sloped roofs with both metal and
asphalt roofing styles.
• Use of pedestrian scale canopies, entry canopies and intricate deck railings
to provide visibility out and in Crest to our project.
0 30 60 90 120
Existing
I
Action
—Locksmith- (,
v
5 } North Elevation - Landscaped —
1 =10 -0
rt.� II
_ P I
- w ,
D View 'A'
IF
- I
I i i
Existing
i Prospector
' Shops
IL
'i
.io,l I I I
m j I I
Lu
�d
I ] II
^lArchitectural Site Plan_ -_
(61 1 " = 30'-0"
3D View 'B'
i } View'A' Westbound Prospect - EXISTING
3/16" = V-0"
View'A' Westbound Prospect- PROPOSED
? 3/16" = V-0"
C3 View'B' Looking Northwest - EXISTING
_- 1/8 = 1-p - —
View'B'_Looking Northwest - PROPOSED
\ 4 1 8" = V-0" — -
tab R�gtm Sr.
unk N3
Fort Comm, CO 80524
phone 97W224-0630
ww Awch.c
In Association with:
R'oqW Mginr LLC
Owner
2542 Mdpokd Drive, lint A
Fort coons, co W525
(97t1)490.1855
Connect Dore Ddar
Email. kiddxr@ddinconatructioritarn
Dohn Consbuction
General Contractor
2642 Mdpoint Driwe, Link A
Fat Collins, CO 80525
(970)490.1855
Contact Doug Dk hn
Email: ddohn@dohrrcorrobrwtiar.can
Larsen Shucllaal Design
Sh cknl Engineer
19 Old Town Square, Suile 238
Fat Csoara, CO W524
(970) 5WM
CmW: Blake Laren
Final: bkke@Wsensd.can
AE AnOCWes
- --
Mechanical Engineer
507 N/ea 10 Street
oreeby, Co am
(970) 330d587
Contact: Nile nap
Email: "Jope@wasoclates.net
AM
Electrical Engineer
8931 Broadway
Denier, CO 8=1
(303) 287"
Cow: cluck Polron
Email: dud0apenc.biz
TB ftW--Larldse
W Arrtlil d
444 Mcu lain Ave.
Bertlaud, CO 80513
(970) 532-M
Carted: catlq Maft
Final: caMry@mpoup.us
IrrbrMRlt ConKdk is Civil Engineer
1218 Ash Street
vYardwr, CO 80550
(970) 674-M
Caaact: M ke Oberiender
bred: mobmiwdm@*Mwwasigrp.com
Prospect
Station
221 Prospect Road
Fort Collins, CO 80526
Issued
No. rim r plkM Dive
1 Final Plan Submittal 7/312013
2
Final Mylar — 9/11/2013
Final Mylar
Protect No.: W12-M Drawn by: SA
Revlsvrsd by: Bart
Visual Analysis
Scab Accordingly it Reduced
DUN" fUnbei
-A7-