Loading...
HomeMy WebLinkAboutPROSPECT STATION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-10-23City of ort Collins m7, Engineering DEVELOPMENT CONSTRUCTION PERMIT Permit Number: _ �-� Issuance Date: 102-1 Project Name: Prospect Station Pro ject A. KA.: Project Location: 221 Prospect Road, Fort Collins CO 80526 Permittee: Lee Merritt Dohn Construction Cite and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 2 874.35 Total $ 3.274.35 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 70 864.00 Forin of security deposited with the City: Check #1032 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Pernnittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Perm ittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Perm ittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conform with City requirements. ance Development Construction Permit, Page 2/6 3. Construction time restrictions: 4. The applicant understands that additional pen -nits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this Permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: Date: Approval for issuance: City Engineer Appro al: ' Date: �— (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Prospect Station City Staff Contact Persons: Development Engineer: Andrew S. Gingerich, P.E. 281 North College Avenue, Fort Collins, CO 80524 970 221-6567 Construction Inspector: Steve Cicione 281 North College Avenue, Fort Collins, CO 80524 970 692-4418 Current Planner: Seth Lorson 281 North College Avenue, Fort Collins, CO 80524 970 224-6189 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970 218-2932 Natural Resources: Lindsay Ex 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Joe Olson 626 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Light and Power: Developer' Contact Persons: Development Construction Permit, Page 5/6 Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6152 Project Manager: Connie Dohn Prospect Station, LLC 2642 Midpoint Dr. Fort Collins, CO 80525 O 970-490-1855 C 970-566-7355 F 970-490-6093 cdohn@dohnconstruction.com Developer: Connie Dohn Prospect Station, LLC 2642 Midpoint Dr. Fort Collins, CO 80525 O 970-490-1855 C 970-566-7355 F 970-490-6093 cdohn@dohnconstruction.com Owner(s): Prospect Station, LLC 2642 Midpoint Dr. Fort Collins, CO 80525 O 970-490-1855 F 970-490-6093 cdohn@dohnconstruction.coni Planner: Matt Rankin R4 Architects 117 E. Mountain Ave. Fort Collins, CO 80524 O 970-224-0630 F 970-224-0634 irn•ankin@rankinarchitects.com Project Engineer: Mike Oberlander, P.E. Interwest Consulting Group 1218 W. Ash, Suite C, Windsor, CO 80550 0 970-674-2671 Development Construction Pernvt, Page 6/6 C 970-631-2671 F 970-674-3303 General Contractor: Lee Merritt Dohn Construction, Inc. 2642 Midpoint Drive, Fort Collins, CO 80525 O 970-490-1855 C 940-567-1191 F 970-490-6093 lmerritt@dohnconstruction.com (LIST ALL PUBLIC AND APPLICABLE 'PRIVATE IMPROVEMENTS) Storm Sewer Reinforced Concrete Pipe Trench Concrete Headwall Water Quality Outlet Structure All Inlet Types Manhole Sanitary Sewer Main Water Main Water Main (Fireline)` Trench Water/Sewer Service Line Stub Fire Hydrant Manhole Valves Meter Pit (3/4") Meter Pit (1-1/2,,) Fitting ( Bend, Tee, Cross ) Water/Sewer Main Connection Street System Grading Bus Stop Paving Curb & Gutter Detached Sidewalk Pedestrian Ramps Apron/ Drive Approach Crosspan "PROJECT QUANTITIES AND COST ESTIMATE SHEET" c D 10/16/2013 c H UNITS OF MEASURE ESTIMATED QUANTITY INFRASTRUCTURE TOTAL INSPECTION TOTAL (PROVIDED BY THE CONSTRUCTION COST PER UNIT ESTIMATED INFRASTRUCTURE FEE PER UNIT INSPECTION PROJECT ENGINEER) OF MEASURE COST (PROVIDED FEE BY THE CITY) (COST ESTMATE APPROVED BY THE CITY) L. F. L.F. 4 00 $5500 . $2,5.00 $0.70 $70.00 C.Y. 0 $0.00 $0.00 $0 $0.00 $0.70 50.00 C.Y. 0 $0.00 $0.00 $0.00 $3.50 $0.00 EACH EACH 0 $O.00 $0.00 $3.50 $103.00 $0.00 1 $2,500.00 $2,500.00 $103.00 $0.00 5103.00 L.F. L.F. 188 245 $23.00 $4,324.00 $0.70 $13160 L.F. 249 $19.00 $0.00 $4,655.00 $0.70 S171.50 L.F. 0 $0.00 $0.70 5174.30 EACH EACH 3 0.00 $1,350.00 $0.00 $4,050,00 $0.70 $70.00 $0.00 EACH 2 1 $2,200.00 $4,400.00 $70.00 S210 00 5140.00 EACH 5 $2,500.00 $2,500.00 $103.00 5103.00 EACH 1 $850.00 $1,850.00 $4,250.00 $70.00 8$35.00 EACH 1 $2,250.00 $1,850.00 $2,250.00 $35.00 EACH EACH 6 $345.00 $2,070.00 $35.00 $35.00 $35$35.00 2 $2,500.00 $5,000.00 $35.00 21.00 0 $.00 $70.00 $ L.S. S.Y. 0 $0.00 $0.00 L.F. 161 216 $72.00 $13,00 $11,592,00 $0.45 00 192 $36.00 $2,808.00 $6,912.00 $236 $212 00 L.F. S.F 10 $55.00 $550.00 $1.00 $1.45 5$70.00 S.Y. 1,071 $8.00 $8,568,00 $0.45 0 $0.00 $0.00 $0.45 449,95 $4$0,00 $0.00 TOTAL'INSPECTION FEE $2,874.35 TOTAL PUBLIC'INFRASTRUCTURE COST S_Cicione 10/18/13 PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING. 62, ._ M2 ); § P\!/ (\ ! ;§pn )§ \§; E� ] � � \jA «» \ \ xx \\ § \ \\ E!]! \[ !! § -- '0I y� >|\\\§\ © `� � \)\(� � � \ «- -------------- )§ -/. [ § P ... _ � ru { § me_rSTA m. e� , UTI` LMYeLA. _rm=_3_. my Q = 0 N N N A N N N N N N yn Q rif o ------ K Z p � o d u C a (7 n z �n n Z 2 o o o n 3 m ? a m - _ Tl T m o ❑ m c c no n u o m o m m E n � 9 0 0 o W n n 3 — a 3 n � o. N s - qJ .N' - N N ,� ,� N `C � W K N Q `f O. `C N N `G � � � .f 6 •C N O. a cai N d N 6 y{■ `C N N S 3 O > o > o > > o 0 > N N � � � [gyp m d A ` W _ _ N ` \N in N - � O 74, Q O m _________________ Q 3 m 2 m m� mT Z� m m z � v --------------------------- ai y - m � v m� m� H _______________________________ m QQ m Zmm - c ....................... 3 oWW ---- - - - - - - - - - ---- - - --- ---- - -- --- -- m N -----�