HomeMy WebLinkAboutPOUDRE VALLEY HEALTH SYSTEM HARMONY CAMPUS MEDICAL CENTER UNIVERSITY OF COLORADO HEALTH CANCER CENTER ADDITION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-05-29City of
Fort Collins
�,..J Engineerir g
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 1 'C' �� Issuance Date: GJ 1 7
Project Name: Poudre Valley Health System Harmony Campus Medical Center First Filing=
building expansion for the Cancer Center
Project Location: SE corner of Timberline Road and Harmony Road
Permittee: Cliff Larson, AP Mountain States LLC 720-324-9370
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($400.00 paid 5/7/13) $ paid
Construction Inspection Fee $ 2,373.70
Street Cut Fee (if applicable to be paid separately) $
Total amount due $ 2,373.70
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 129,181.82
Form of security deposited with the City: F�>6N D
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have. an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the
terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in
Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
Page 1 of 5
3. Construction time restrictions: N/A
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code
or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is
applicable, are met. If the Development Agreement does not specify times for completion of
public improvements, or if there is no Development Agreement, then the improvement
requirements specified in Section 24-95 of the City Code shall apply, which provides that
construction of all improvements shall be required prior to the time of issuance of the first
building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the `as -constructed' plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
Page 2 of 5
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I
hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to
enter upon such property to perform work required of the applicant if the applicant were to fail to
perform the required work. I also acknowledge that I have read this permit document with all its
requirements and conditions, and I agree to all of the terms and conditions so stated in this
permit.
Applicant/Project Manager's Signature: C Date: -S 2Z ► 3
Approval for issuance:
City Engineer Approval" Date: = z 3
(Permit Issuance Date)
Page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Poudre Valley Health System Harmony Campus Medial Center First Filing —
building expansion, Canter Center
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Langenberger
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6573
Construction Inspector:
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 222-6824
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6343
Water Utilities Engineer/
Wastewater Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970) 221-6854
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, Co 80521
(970) 224-6700
Natural Resources: Lindsay Ex
281 N. College Avenue, Fort Collins, Co 80524
(970) 224-6143
Traffic Operations: Joe Olson
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Forestry: Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970) 221-6361
Page 4 of 5
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970) 221-6700
Developer's Contact Persons:
Project Manager: Brian Hood, University of Colorado Health
2315 E Harmony Rd #200, Fort Collins, CO 80528
970-237-7142
Cell (970) 988-6622
Brian.Hood(a�uchealth. ora
Developer/ Owner: Brian Hood, University of Colorado Health
2315 E Harmony Rd #200, Fort Collins, CO 80528
970-237-7142
Cell (970) 988-6622
Brian. Hoodguchealth. ora
Project Engineer: Peter S Buckley, Martin and Martin
12499 W Colfax Ave, Lakewood, Co 80215
303-431-6100
PBuckleygmartinmartin. com
Architect/Planner: Eric Eschenbrenner, Heery International
820 16th Street Mall, Suite 200,
Denver, Co 80202-3219
720-946-0276
Fax (720) 946-0277
eeschenbrennerkheery. com
General Contractor: Cliff Larson, AP Mountain States, LLC, dba Adolfson &
Peterson Construction, Inc.
797Ventura Street, Aurora, Co 80011
303-363-7101
Cell (720) 324-9370
clarson(a,a-p.com
Page 5 of 5
z
J�
Cl)
I
FQ- U W
W
0 0 0 0 0 0 0
M O 0 0 0 0 0 0 0 0 0
a00�
0 0 0 0 0 0 0 0
fR
O 0_ U.
F-Z
OOOOOOO
fA in t»tsi to to 69
OOujOOOpujON�
0, vm 9 69 Ci aO
b9 Go 6� co nM
OOOOOOOO
OOOOOO OO
yy to y9���
b9 t9 viW to ViMui
f
.0
Z'
O
X U
ai
LLm}
0oo� 0M
��n0000000000
oo0LOto0 LO
'—
Z O
0
O O in f") M O f`M O
di(A 69 fA
O O O O p 0 M O 46 N LO U) t1y
yq Ni fie 6r Cl)fl O r Cl)fMM MM
Vi Yi
�.
00 00
to
OW
F-•
Vi fH
69 6�i f9 tfY bi w W.
Vi Vi 69 fA b9 Vi Hi
--
-
U >
a(
w
z_ a
�t
W
J
LWL
Z
w x
Z
co
m
.j•C
Q F
0
�;
F-
^,�
�UF-
Cl)
NO00000 O o 00
Ln
M00066Z
OO
U
co
Z
-•�)
LL
W F' 0
0000000
006 C1000
0n � p0pp
co N �7000 U) p
aOr ci
OOOOOOO
00 000000 0
d
N-
r
J
_
W
J V1
Q
f!i b9 fA f9 6A 69 IA
O�OM
n O 'V' d' Vi Ni fA
Ln
w
OOOO Ci0000
w !H Ni fH w M w Ni fA
Z
3
W
LL
sNvwvi��ui� Go up466%
N
►-
N J
0
F
w
OF-
f-
>
Jy
wS
O
m
C
Zh- W
CL
S
00
l
W
F- )
w
U U m
>>wm F-
w Q co
00
000 0 o
0 0 0 0 0
0 0 o 0 0 o 00 0
-0p000gC uLq o00
M �' O O N O 0
00 0
CD
W
N
0
w w
M !n F" F- i U
o 0
OLO K 619 w V09 N H
O p M p 0 O
M M 0 ul C W N N LO V7
%O.-'-
000000000
O O M O (D W O
%
ci
gZwLLcn0
w Nf/i
��w NNuiN
w
�aiww6%wLo6%6
O-
0 O
LL O O 0.
H to w &% V% 6%
U U
z .r a
ce
Lij
a-
-
w
it
tr
x
U)
Q
o
2
Z
w
Z FS- w
FL
In
CY m0 Z
()
J
Yo
W �f
0000000
O)
coV MAN'-NONO'-OWN
ffDD .-
000000000
FYI
2
U
Lu
F U
�
a
m
0
o
F- CL
a
tL
W a
p
M
F-
o
W
LL W
LU
Z
/)
�/
N
� <
0'
Z Cl)
S S
� J1'%' U%'U
SSSSS2SSSS
lL U-LLLLQU UUUUUU
"•p CLL.LLLL Li�LLLL
J
N
UU U
¢U ¢UU
J.JJJgW 4Q000Q Q`Q
UJJ lll1.JI LLl1.JI LL1111 IIwJ uLLll
}FO _IJ(n(n J(n(6
777y
N
0
fJ
U i
q
ul
CL
�
U u
ZU
J
�C
m
J
E
w�
�4
U
CL
m
F
mIL
F-
L
O W
_O. Y
0. m
61 v G C N
3 O
Z a
KJa
Qw
N
mJ
V
Nmac�,�
L
m
pcf.
>�
t
U�
J
Q� —(D(D
Z U iC U M
�i0�-„
Z
0 Ip C N N C
a) o 0 m
Y y O
0 LL
7
/
ZOOa
c
_ g y o
N
c
Co 0- CL
wz
oaf
J
`mU y (D
2 m T�i
3� 0 ym 0 3 ^v y
y d c ro 3 c c o
y „v mQ
w z ro
�Q
CL
W
JF-
�QQ
u) °� a� �F- ro
and
3 ��� aa) c
aDN•��cn a� o �w ,.,.....m o
Z� t`U Tin n n U
w y m
3 c,
m 3 0 �•«c� m
wp
QF-
oL �• o
C C f0 C
ro
C w aI m S > a) y
0aci0
a) N C N
2
W J R
.0.. a) O m N m
4: w
N R N d m ro y an d a/ m_ m
�cn3lL��(nLLlni���lt3
U a)
N 7 In 6 N N 0. O`
mcDLLU(n�Qa_<0
per, ~
z
8
CD
f $e O
self °u
E25u.
H i3 YF
�i
e
R.
C Oco
is8 SERgj
A,
II I
, 8 0 08 • { 9 � a R IEJ
cz
O
U
g