HomeMy WebLinkAboutBLEVINS LOT 3 605 WEST LAKE STREET - Filed CS-COMMENT SHEETS - 2012-02-13PROJECT
City of Fort Collins COMMENT SHEET
Current Planning
DATE: November 23, 2005
TO: Engineering
PROJECT PLANNER: Steve Olt
#48-05 605 West Lake Street Boarding House PDP — Type I
Please return all comments to the project planner no later than the staff
review meeting:
December 7, 2005
Note - Please identify your redlines for future reference
❑ No Problems
❑ Problems or Concerns (see below or attached)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report _Other.
Utility Redline Utility Landscape
go
City of Fort Collins
f
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
YOurs Truly,
4)e
Ste a Olt,
City Planner
cc: Dan DeLaughter
Peter Barnes
Project File #48-05
Page 3
REVISION ROUTING SHEET
Item D k-e Q oa�(,w'MS2 Cor tit: a..
Date Received: Planner: Fy� Off - Engineer: b4o,
dh
A .
File: Project Planner
Advance Planning
Building Inspection
Engineering
Engineering Pavement
Light & Power
Natural Resources
MMMMMMMMMMMMMMMM
Street Oversizing
City of Fort Collins'
Project Comments Sheet
Selected Departments
Department: Engineering
Date: October 10, 2006
Project: 605 WEST LAKE STREET BOARDING HOUSE PDP
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
October 115 2006
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 27 Created: 10/10/2006
[10/10/06] Please dimension ALL existing sidewalks on the property.
Issue Contact: Dan DeLaughter
Topic: General
Number: 1 Created: 11 /23/2005
[10/10/06] Please remove the OLD incorrect labeling (it conflicts with the NEW correct
labeling).
[6/8/06] The sidewalk is only 32" here. With curb and gutter, it may be 4.5% but please label
as 32" sidewalk, not 4.5 'concrete.
[11/23/05] Sidewalk along frontage must be dimensioned
Number: 9 Created: 12/1/2005
[10/10/06] Per Sheri Langenberger, the notation stating that the shed will be moved at such
time the utility companies need access is acceptable to engineering. However, are there
any minimum setback requirements from either Building and Zoning or Planning?
[6/9/06] The shed is within the easement.
[12/1/05] Show the existing 5' easement (per Blevins Subdivision plat) on south of the site.
It appears your shed is located within this easement. The shed would have to be moved or
utilities must give approval for it to remain.
Number: 24 Created: 6/23/2006
[10/10/06] The Final Compliance Fee has been reduced to $200 per the City Engineer.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
[6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee
will be owed to engineering.
Page 2
James R. Swanstrom PO Box 271516
Fort Collins
Colorado 80527
Home 970-225-0170
Cell 970-567-1327
4 nt mh r 17 006
Steve Olt
City Planner
City Of Fort Collins
Reference: Staff comments 605 WEST LAKE STREET, BOARDING HOUSE -
PDP
Mr Olt:
My Comments are below the copy of the staff comment
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Electric service
Number: 18 Created: 12/8/2005
[6/26/06] Repeated just for confirmation that this can be assessed the
residential electric rate.
[12/8/05] After additional research and discussion, it has been concluded
that boarding houses can be on the residential electric rate. Rate ordinances
from several years ago stipulated that boarding houses would be on the
commercial rate; however, current rates are silent on boarding houses. Since
the expected electric use pattern is like that of a residence, it has been
concluded that the appropriate rate is residential. Anyway, there is very little
difference between the two rates.
Jim Swanstrom Thank You
Topic: General
Number: 14 Created: 12 / 6 / 2005
[6/26/06] Repeat comment. How is this requirement being met?
[12/6/05] This facility, proposed for 6 bedrooms, must provide for one van
accessible handicap parking space with wheelchair access into the building.
Based on the information provided, it is difficult to determine if this
development proposal satisfies the requirement.
Jim Swanstrom. I understand that this requirement is actually for properties
with 10 or more. So it does not apply to this property
Page i
Number: 26 Created: 6/ 26/ 2006
[6/26/06] Based on the plan scale of 1" = 10', the width of the proposed 3-
car off-street parking area scales to be 23.5' wide. This is not wide enough
for the required 3 parking spaces off-street.
Jim Swanstrom The dimension shown is correct for the concrete as it
already exist. Which give us three parking spaces 9 wide for a total of 27
feet and 19 foot deep? The scaling has been corrected
Department: Engineering Issue Contact: Dan
DeLaughter
Topic: General
Number: 1 Created: 11 / 23 / 2005
[6/8/06] The sidewalk is only 32" here. With curb and gutter, it may be
4.5', but please label as 32" sidewalk, not 4.5 ' concrete.
[ 11 / 23 / 05] Sidewalk along frontage must be dimensioned.
Jim Swanstrom: corrected
Number: 2 Created: 11/23/2005 [6/8/06] This doesn't appear to be what is
shown on our electronic parcel map. You are labeling 65', while it appears to
be more like 63'. What is shown on the existing plat?
[ 11 /23/ 051 Dimension the existing ROW.
Jim Swanstrom, The copy of the plat for Blevins subdivision which I have
does not give a width for Lake Street. Width changed to 63 feet
Number: 9 Created: 12 / 1 / 2005
[6 / 9 / 06] The shed is within the easement.
[ 12 / 1 / 05] Show the existing 5' easement (per Blevins Subdivision plat) on
south of the site. It appears your shed is located within this easement. The
shed would have to be moved or utilities must give approval for it to remain.
Jim Swanstrom, I am currently attempting to find get permission to leave
Page 2
from the utility department. Who would have to sign off on this from your
perspective? But if necessary I will move the shed.
Number: 22 Created: 6/8/2006 [6/8/061
The scale of the site plan is not quite 1 "=10' as indicated. Please adjust.
Jim Swanstrom Adjusted
Number: 23 Created: 6/9/2006
[6/ 9 / 061 See redlines for additional minor revisions.
Jim Swanstrom Adjusted
Number: 24 Created: 6/23/2006
[6 / 23 / 061 At the time of Final Compliance, a $1000 Transportation
Development Review fee will be owed to engineering.
Jim Swanstrom A one thousand dollar fee for an existing house! Whom do I talk to about
having this waved?
I have attached all of the redlined plans.
If I understand the revision routing sheet correctly I am to hand in 0
copies of the revised site plan. But I think you need 3 copies along
with the three redlined site plans previously returned.
If you need addition information I can be reached numbers noted
above.
i c rely yours
J. Swanstrom
Page 3
CitV of Fort Collins
Department: Engh
Project Comments Sheet
Selected Departments
Date: July 25, 2007
Project:
605 WEST LAKE STREET BOARDING HOUSE PDP TYPE I AND FINAL
PLANS
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 259 2007
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 29 Created: 7/25/2007
[7/25/071 Please add the following note to the plans:
"General Construction Notes #1 through 18, 20 through 39, and 42 through 46 as listed in
Appendix E-1 of the Larimer County Urban Area Street Standards (LCUASS) shall apply
and be followed for this project."
Number: 30 Created: 7/25/2007
[7/25/07] Label the sidewalk along Lake as "exisiting" or "proposed".
Number: 31 Created: 7/25/2007
[7/25/07] Correct the spelling of the wood privacy fence.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
James R. Swanstrom PO Box 271516
Forl Collins
Colorado 80527
Nome 970-225-0170
Cell 970-567-1327
June M. W7
Sleve Olt
City Planner
City Of Forl Collins
Reference: Staff comments 605 WEST LAKE STREET, BOARDING HOUSE -
PDP
Mr. Olt:
My Comments are below the copy of the staff comment
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 28 Created: 10/17/2006
[10/17/06] This item is ready to be scheduled for an administrative public hearing. There are
several changes to the Site Plan that must be made before approval and recording of the
plan.
Jim S. Since all six projects are being handled at the same time. Can I get a partial refund of
the planning fees? I paid mailing fees on all six but only one letter was mailed and combined
meetings where held for all projects. This had to save everybody's time
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 27 Created: 10/10/2006
[10/10/06] Please dimension ALL existing sidewalks on the property.
Jim S. Ok
Department: Engineering Issue Contact: Dan DeLaughter
Topic: General
Number: I Created: 11/23/2005
[10/10/06] Please remove the OLD incorrect labeling (it conflicts with the NEW correct
labeling).
[6/8/06] The sidewalk is only 32" here. With curb and gutter, it may be 4.5', but please label
as 32" sidewalk, not 4.5 ' concrete.
[11/23/05] Sidewalk along frontage must be dimensioned.
Page 1
Jim S. Ok
Number: 9
Created: 12/1 /2005
[10/10/06] Per Sheri Langenberger, the notation stating that the shed will be moved at such
time the utility companies need access is acceptable to engineering. However, are there
any minimum setback requirements from either Building and Zoning or Planning?
[6/9/06] The shed is within the easement.
[12/1/05] Show the existing 5' easement (per Blevins Subdivision plat) on south of the site.
It appears your shed is located within this easement. The shed would have to be moved or
utilities must give approval for it to remain.
Jim S. Ok
Number: 24 Created: 6/23/2006
[10/10/06] The Final Compliance Fee has been reduced to $200 per the City Engineer.
[6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee
will be owed to engineering.
Jim S. Ok
I have attached all of the redlined plans.
If I understand the revision routing sheet correctly I am to hand in 2
copies of the revised site plan..
If you need addition information I can be reached numbers noted
above.
ely yours
;in
wanstrom
Page 2
James R . Swans trom
PO Box 271516
Fort Collins, Colorado 80527
Home 970-225-0170
November 22 2005
Planning Objectives
Reference:605 West Lake, Fort Collins Lot Blevins Subdivision
Convert existing 6 bedroom 2 bath home into a 6bedroom/two bath boarding house.
Copy of applicable conceptual letter & Response letter to Comments
combined to save paper
Owners comments noted below each item.
ITEM: Request to change the use of the property at 605 West
Lake Street from a single-family residence to a
boarding house.
MEETING DATE: October 31, 2005
APPLICANT: Jim Swanstrom
4720 Prairie Ridge Dr.
Fort Collins, CO 80526
970-225-0170 home J 970-377-0937 work
L swanstrom(c),comcast. net
Comment: My mailing address is PO Box 271516, Fort Collins, Co The
above address is my Fathers, Robert Swanstrom.
LAND USE DATA: Request to change the use of the property at 605 West
Lake Street from a.single-family residence to a boarding house. The
property is within the City of Fort Collins and is zoned HMN - High
Density Mixed -Use Neighborhood District.
COMMENTS:-;The16llowing departmental agencies have offered
comments for this proposal based on a map and site plan which were
presented to the review team:
Zoning
Contact Info: Peter Barnes, 416-2355, pbarnes@fcgov.com
1. Boarding Houses are permitted uses in the HMN District,
subject to a Type 1 (Administrative) review and public hearing.
Comment: OK
2. Off-street parking requirements for boarding houses are
specified in Section 3.2. 2 (K) (1) (e) of the Land Use Code. For
each boarding house, there shall be one parking space per two
beds, plus one parking space per two employees. Garage space
does not count as a parking space. For the proposed six beds,
a minimum of three unobstructed, off-street parking spaces are
required. One of these parking spaces must be van accessible
with wheelchair access into the building, if 6 or more sleeping
rooms are proposed. Parking areas must be paved in a hard
surface (concrete or asphalt) .
Comment: Parking provided, see plans No Employees
3. A bicycle rack must be provided for this change of use.
Comment: Rack provided see plans
4. A Certificate of Occupancy will be needed to change the use
from a single-family residence to a boarding house.
Comment: Need specific as to what is means to comment further.
Engineering
Contact Info: Susan Joy and Dan DeLaughter, 221-6605,
sjoy@fcgov.com, ddelaughter@fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees for
this site may apply. Contact Matt Baker, at 224-6108, for an
updated estimate of the fees for this kind of use.
Comment; ;Contacted. Matt Baker no change in car count no fees.
2. A Traffic Impact Study is required for this project but may be
waived _because of low traffic volume. Contact Eric Bracke, at
224-6062, to discussthis issue.
Comment: Contact Eric Bracke same as above
3. Applicant is responsible for repairing or replacing any damaged
curb, gutter or sidewalk along the property frontage.
Comment: No new construction proposed nothing damaged now. We
can review further.
4. Applicant may need to dedicate Right -of -Way (ROW) and Utility
Easements. For this project, a total of 38 feet of ROW from the
centerline and a 9 foot utility easement will be required.
Comment: Would need more specifics to comment.
5. Applicant may be responsible for sidewalk improvements.
Comment: Would need more specifics to comment.
6. A Development Construction Permit may be required for this
project development plan.
N
Comment: Would need more specifics to comment.
7. Engineering will need to review the parking lot plans. Parking
spaces may need to meet the setback requirements from West
Lake Street.
Comment: Would need more specifics to comment.
8. This change of use on the property triggers the undergrounding
any existing overhead utility lines along or across the property.
Comment; The phone and cable TV are currently over head in the
back yard and used by several properties. This should be a shared
cost not just incurred upon this property.
9. All public improvements will need to be made in accordance with
Larimer County Urban Area Street Standards (LCUASS)
Comment: No public improvements currently proposed existing
property.
Light and Power
Contact Info: Judy Dahlgren, 221-6150, jdahlgren@fcgov.com
1. Applicant will need to contact utility billing, at 212-2900, in order
to change existing service from residential to commercial.
Comment: Utilities are in the tenant's name. We can request this be
updated. It this not still a residential use?
Stormwater Utility
Contact Info: Glen Schlueter, 221-6700, gschlueter@fcgov.com
1. This site is in the Old Town drainage basin where the new
development fee is $4,150.00/acre which is subject to the
runoff coefficient reduction. This fee is to be paid at the time
the building permit is issued and is charged only when there is
an increase in imperviousness greater than 350 square feet.
The fee may change as City Council is considering a new city
wide drainage fee instead of the present fee which is based on a
specific drainage basin.
Comment: no change in run off proposed
2. In the Old Town drainage basin a drainage report and
construction plans are required if there is an increase in
imperviousness greater than 5,000 square feet. They would
need to be prepared by a Professional Engineer registered in
Colorado.
Comment: no change in run off proposed
3
2. If there is 5,000 square feet or less of new imperviousness, water
quantity detention is not required nor is water quality extended
detention. When on -site detention is required the release rate
would be the 2-year historic for water quantity and extended
detention would be required for water quality treatment. Parking
lot detention is allowed as long as it is not deeper than one foot. If
there is an increase in imperviousness greater than 350 square
feet, but less than 5,000 square feet, a grading plan is all that is
required. If it can be shown that the total imperviousness,
including one-half any adjacent streets or alleys, is equal to or less
that the master plan imperviousness, the report and detention
requirements are waived, but a grading plan is still required.
Comment: no change in run off proposed
Water Wastewater
Contact Info: Roger Buffington, 221-6854, rbuffington@fcgov.com
1. No changes planned to the existing water/sewer services;
therefore, no comments.
Comment: no changes in utilities proposed
.Transportation Planning
,.Contact Info: Kurt Ravenschlag,-416-2040, kravenschlag@fcgov.com
1. Please provide bicycle parking for the six residents. Indicate on
the site plan where the bicycle parking will be provided.
Comment: Rack provided see plans. Bikes are hard on the inside of a
property.
Natural Resources
Contact Info: Doug Moore, 224-6143, dmoore@fcgov.com
1. Trash enclosure needs to be designed to accommodate recycling
services. The City of Fort Collins Design Considerations
Guidance Document may be found at
http• 1 / www fcgov com/ recycling/ pdf/ enclosure-
guidelines0804.pdf. If no trash enclosure is proposed, please
include a letter addressing how rash and recycling service will
be provided.
Comment: Trash is stored in the enclosed storage area existing in the
back yard..
4
Current Planning
Contact Info: Steve Olt, 221-6341, solt@fcgov.com
1. The entire Fort Collins Land Use Code (LUC) is available for
your review on the web at
htt : Z /www.colocode.com/�ftcollins/landuse/begin.htm
2. This development proposal is subject to all applicable standards
of the Fort Collins Land Use Code, specifically Article 3 -
General Development Standards, and Division 4.24 High
Density Mixed -Use Neighborhood District.
Comment: No comment
3. If you decide to propose six or more sleeping rooms, be aware
that building codes require one accessible sleeping room which
is provided with visual and audible smoke alarm, one accessible
van parking space with wheelchair access into the building and
one wheelchair accessible restroom complete with bathing
facilities.
Proposing: a 6 bedroom. Need to get further information on
Handicapp requirements. This is a ranch property.
4. A neighborhood meeting will be required for your proposed six
boarding houses. Rather than have separate meetings, please
coordinate with my office (and planner Shelby Sommer) so that
we can find a place and time for a meeting to discuss all six
proposals.
Comment: Started the process would propose Dec. 12th or 13th
5. Please contact me if you have any questions about the code
requirements or application submittal requirements.
6. You will need to set up an appointment to submit your
application with Tara Leman, Planning Technician at 221-6750.
Incomplete submittals will not be accepted.
STAFF PROJECT REVIEW
James Swanstrom
P.O. Box 271516
Fort Collins, CO. 80527
Date: 12/08/2005
Staff has reviewed your submittal for 605 WEST LAKE STREET,
BOARDING HOUSE - PDP, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Electric seruice
Number: 18 Created: 12/8/2005
[12/8/05] After additional research and discussion, it has been concluded
that boarding houses can be on the residential electric rate. Rate ordinances
from several years ago stipulated that boarding houses would be on the
commercial rate; however, current rates are silent on boarding houses.
Since the expected electric use pattern is like that of a residence, it has been
concluded that the appropriate rate is residential. Anyway, there is very
little difference between the two rates.
Topic: General
Number: 14 Created: 12/6/2005
[ 12/6/05) This facility, proposed for 6 bedrooms, must provide for one van
accessible handicap parking space with wheelchair access into the building.
Based on the information provided, it is difficult to determine if this
development proposal satisfies the requirement.
Number: 15 Created: 12/6/2005
[12/6/05] Rick Lee of the Building Department indicated that copies of
the Codes & Standards to be enforced by his department and the Single -
Family to Boarding House Conversion Requirements are attached to this
comment letter.
Topic: Site Plan
Number: 10 Created: 12/6/2005
[ 12/6/051 Neither the Site Plan map nor the Vicinity Map are legible. The
Site Plan must be enlarged to a measurable scale so that the information
can be read and understood. For a site of this size it would not be
unreasonable to have the Site Plan at a 1" = 20' or, better yet, a 1" = 10'
scale. Also, it is impossible to determine where 605 Lake Street is based on
the information provided on the Vicinity Map. Please see the attached
example of a Vicinity Map that could be included on the Site Plan.
Page 1
Number: 19 Created: 12/8/2005
[ 12/8/05J There are of then items in the plan that can be ete llan iminated. ed. Pe ase selist at e upper right-hand comerp
red -lined Site Plan that is being forwarded to you.
Department: Engineering
DeLaughter
Issue Contact: Dan
Topic: General
Number: 1 Created: 11 /23/2005
[11/23/051 Sidewalk along the property frontage must be dimensioned.
Number: 2 Created: 11 /23/2005
[11/23/051 Dimension the existing right-of-way.
Number: 3 Created: 11 /23/2005
[11/23/051 Please indicate actual parking spaces so we can determine how
the site functions.
Number: 9 Created: 12/ 1 /2005
[ 12/ 1 /05J Show the existing 5' easement (per Blevins Subdivision plat) on
south of the site. It appears your shed is located within this easement. The
shed would have to be moved or utilities must give approval for it to remain.
Department: Zoning
Issue Contact: Peter Barnes
Topic: Zoning
Number: 6 Created: 12/ 1 /2005
[ 12/ 1 /05J Site Plan image needs to be larger inorder to be legible.
Number: 7 Created: 12/ 1 /2005
[ 12/ 1 /05J Need to label one van accessibly handicap parking space. The
space must be at least 8' wide and adjoin a minimum 8' wide access aisle.
This completes staff (and outside' reviewing agencies) review and comments
at this time. Additional comments and red -lined plans may be forthcoming.
Another round of staff review has been determined to be necessary.
Therefore, this development request cannot be scheduled for a public
hearing at this time. This proposal is subject to the go&" revision re -
submittal requirement (from the date of this comment letter, being
December 8, 2005) as set forth in Section 2.2.11(A) of the Land Use
Code. Be sure and return all red -lined plans when you re -submit. The
number of copies of each document to re -submit is shown on the attached
Revisions Routing Sheet.
Page 2