Loading...
HomeMy WebLinkAboutSEVEN ELEVEN CONVENIENCE STORE AT CUNNINGHAM CORNER PUD - Filed GC-GENERAL CORRESPONDENCE - 2012-01-05y �. EMZVFK architects/planners a professional corporation eleven old town square suite 200 fort collins, co. 80524 usa telephone 303 493-4105 September 27, 1985 Planning & Zoning Board Members City of Fort Collins PO Box 580 Fort Collins, CO 80522 E5 Re: Planning Objectives - Tract D Cunningham Corner, #02-5030 Dear City Staff and Planning & Zoning Board Members, The final PUD plan for Tract D of Cunningham Corner is being submitted for your review. A 7-Eleven convenience store with gas pumps is being proposed for the .80 acre site consistent with the master plan approved in 1983. The main entrance off of Horsetooth Road is shared with the retail/office center proposed for Tract C. A 2,816 SF building, parking spaces and gas pumps are sited to achieve maximum efficiency and to leave 45% of the site as open space to buffer adjacent residential land uses. Architecturally, the store is a new design, featuring blonde brick, more glass and an attractive sign band which wraps around the structure. Both evergreen and deciduous foundation plantings soften the building's archi- tecture and help screen the trash enclosure. Special attention is given to the interface between 7-Eleven and Chestnut Village Condominiums located to the east and northeast. Upsized evergreen trees and berming are used as a buffer between land uses and to screen objectionable lights to the extent possible. The new 7-Eleven store promises to be a welcome addition to the neigh- borhood, both in terms of design and user convenience. The land use policies addressed by this project are as follows: 14 Urban Development standards shall apply to all development within the Urban Growth Area. 15 Development in the Urban Growth Area should be consistent with deve- lopment policies set forth in this plan. 22 Preferential consideration shall be given to Urban Development Proposals which are continguous to existing development within the City Limits or consistent with the Phasing Plan for the City's Urban Growth Area. M Planning & Zoning Board Members September 27, 1985 Page Two M 24 All Utility extensions should be in conformance with the phased uti- lity expansion portion of the City's comprehensive plan. Thank you for your consideration and we look forward to your review. Sincerely, Linda Ripley ZVFK Architects/ lanners /mk ZVFK architects/planners. eleven old town square, suite 200, tort coliins, co. 80524 use. telephone 303 493-4105 *41W 14je ,ram, CITY OF FORT COLLINS ENGINEERING SERVICES May 16, 1986 Mr. Mike Carver Taranto, Stanton & Tagge Consulting Engineers 748 Whalers Way Fort Collins, CO 80525 Dear Mike: This letter is to confirm the conversations that we have had regarding the deceleration lane off of Horsetooth Road for the 7-11 Convenience Store at Cunningham Corner. On May 2 I shot the lip elevation of the new curb installed by Loveland Excavation and the elevation of the existing edge of asphalt on Horsetooth Road to see if the minimal slope of 1.1% (as shown on the plan) existed between the curb and gutter and the existing edge of asphalt. It was determined that the new pavement if installed would not have the minimal slope and would in fact have a reverse slope in some places. After reviewing the elevation shots submitted by you, it appears that the curb and gutter installed by Loveland Excavation was installed to the plan grade. The alternate red -lined plan that you submitted to the City Planning Department using concrete in place of asphalt will be acceptable to the City under the following conditions: 1. That the contractor installing the concrete pavement shall take extreme care in finishing the concrete so as to not create water ponds in the finished slab. 2. That the City Inspection Department be notified of the construction of the concrete pavement. Thank you for your help in this matter. Sincerely, Rick Richter 'Construction Inspector cc: Southland Corporation Loveland Excavation Lobar, Inc. Cunningham Corner Construction ENGINEERING SERVICES 300 LaPorte Ave. 0 P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6605 09 M CITY OF FORT COLLINS ENGINEERING SERVICES July 3, 1986 Southland Corporation Construction Division 7167 S. Aiton Way Englewood, Colorado 80112 Re: 7-11 Convenience Store at Cunningham Corner TO WHOM IT MAY CONCERN: The deceleration lane off of Horsetooth Road has been constructed, however, there seems to be some confusion as to the responsibility of the following items: - Sealing the joint between the existing asphalt and the new concrete pavement with an approved asphalt -rubber sealant. - Placing permanent hot mixed asphalt patches where the temporary patches have been placed in Horsetooth Road. - Repair any cracked sidewalk and curb and gutter on site. The City of Fort Collins will require that these items be taken care of prior to the release of a Certificate of Occupancy. Thank you for your attention in this matter. Yours truly, /ic�kR i Construction Inspector cc: Lobar, Inc. Lang-MyXphy, Inc. CRS Inc. Cunningham Corner Construction ENGINEERING SERVICES 3UU LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6605 woo C� May 7, 1990 7-11 Convenience Store P.U.D. �) GP Project No, 10-497-001 Mr. Tom Sibbald 3565 Windmill Drive #N-4 Fort Collins, Colorado 80526 Dear Mr. Sibbald: Pursuant to our phone conversations on April 17 and April 23, 1990 regarding access across Tract "B" of the 7-Eleven Convenience Store, A Planned Unit Development at Cunningham Corner, I have reviewed the subdivision plat, the final site plan, the development agreement, the reciprocal easement agreement, and the improvement survey plat. None of these documents specifically reserve Tract "B" as private access, nor do they refer to the tract as a public road. I also could not find any specific reference to such a reservation in our correspondence files on this project. I do feel, though, that your intent to reserve the areas dedicated as Access Easements can be substantiated by the following thoughts: 1) Even though the plat dedicates the easements "to the City of Fort Collins for the public use," common sense dictates that the access and parking easement covering a majority of Tract "A" (the 7-Eleven site) and Tract "B" is intended for access and parking of the clientele of Tract "A," and whomever the owners of Tracts "A" and "B" wish to allow to enter on the easements, (i.e. not for use by the general public at large). 2) The existence of the Reciprocal Easement Agreement between Southland Corp, and Metcalf, Ltd. recorded at reception no. 86010503, dated December 9, 1985, which shows the intent of the owners to mutually use and maintain the access drive off Horsetooth Road. 3) If the access was for public use, it would have been dedicated as public right-of-way and platted as a street, instead of taxes being paid on the property. Also, the tract lines would not have been platted along the center of the access road, TSTr INC. 748 Whalers Way • Building D 102 Inverness Terrace East Consulting Engineers Fort Collins, CO 80525 Englewood, CO 80112 (303) 226-0557 (303) 792-0557 Metro Denver (303) 595-9103 FAX (303) 792.9489 FAX (303) 226-0204 TST, INC. Page Two Mr. Tom Sibbald May 7, 1990 4) You, as the owner of the land, were the one platting the property and, therefore, are the only one who can clarify any confusion on your intent in dedicating the access easement. I hope this letter can help you in being able to respond to the City's comments regarding the access easement. Respectfully, Michael C. Cregger, P.L.S. TST, INC. CONSULTING ENGINEERS MCC/cj w