HomeMy WebLinkAboutSTANTON CREEK SECOND - Filed CS-COMMENT SHEETS - 2011-12-120
City of Fort Collins
Current Plannin
PROJECT
COMMENT SHEET
DATE: March 31, 1998 DEPT: Engineering
PROJECT: Stanton Creek Final, 2nd Filing
ENGINEER: Michael Coley
Plat
Sheet 1:
X Use `new' attorney certification language as attached.
X Include administrative hearing approval signature language as attached.
9 In the `dedication of common elements', is the language regarding Tract A contrary
to the language in the existing conservation easement?
9 The should be an ownership/maintenance statement for all tracts.
Sheets 2-4:
X Delineate and label all existing easements (and give reception numbers).
Sheet 4: 1 '-- Cl 'D I
X Minimum centerline radius for residential local streets is 240'.
Sheet 5:
• Be sure that all tract letters are consistant throughout the plan set.
• The PDP showed two sight distance easements adjacent to Stanton Creek Drive.
Utility Plans
Sheet 7:
K Please provide either a temporary roadway or a temporary turnaround for emergency
access south of the multifamily portion.
Sheet 8:
• Show boundaries of all offsite easements on overall utility plans.
• Storm inlet should be located at the back of curb.
Sheet 10:
9 Several sidewalks appear to exceed maximum slope as required in the ADA.
Sheet 15:
X Does the `Erosion Buffer Zone' actually cross the stream channel?
Sheet 23:
N Hillaby approaching Lamay: maximum approach grade at an arterial intersection is
2% within 125 feet.
n
M
Sheet 24:
H Bonaire Lane at Saint Croix Place: is there a sight distance problem when the
vertical curve is considered?
9 Cross pan locations are inconsistant in plan and profile.
Sheet 26:
X Barbuda Place and Basseterre Place at Barbuda Drive: are there sight distance
problems at these intersections when considering the vertical curve?
Sheet 29:
X Saint Thomas Drive and Hilaby Drive: there is a cross pan shown here that isn't
shown on the overall utility plan and it apparently is not needed.
Sheet 32:
X Street cross-section for residential local (30') street isn't quite right.
**See redline utility plans for additional comments**
Date: 3 / 3 ) / C) F, Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ LAT
Q SITE
M UTILITY
® LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 26, 1998 TO: Trans Ping
PROJECT: #31-83H Stanton Creek, 2nd Filing - Type I Final
Compliance
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, March 25,1998
Date: `� t —Signature: ti�Y
aM ME IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ PW _ Sk _ Dr��,q* R" _ Offer
ift
_' j
_ Ufik _ Re& U—
_---* City of Fort Collins
,%/
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 26, 1998 TO: Mapping
PROJECT: #31-83H Stanton Creek, 2nd Filing - Type I Final
Compliance
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, March 25,1998
,1, Need c orel c )'5� "r-es I'A +)Ae cat yu-e- W /C,
`J4eeI
5hee�
5�,4- q --
—' Neej d1'341,+ceS g101"G t) Ltov(� isIO'U1
dJea r —j 1.5 � 4 v0"j` e-y to 55 (
Ta D' 10 GG,
Need (Ai5TQuce5 Q/0xiq r0cAS.
`/4(
� o h )off- 167 q
1Zad,45 lateled wrovz9 0" 6CAJCZ Pl,
C L Gtu rum da� yA r55, -t q � GL i,
1
1%�5 pl"� is
ow, �55-"7 0u, Ct
Date:
11VIa Pke j Pp-EL.1 Mint-R- L
-r1 c yc G re- G+1 ms
5ke,f5- — h ce-4 40 5Ce ct
-- O\IC--f2— —
Signature:
CHECK HERE T YOU WISH TO RECEIVE COPIES OF REVISIONS
I-Aw _ Sid _Dmp RqW_ Odw
— Ufik — Rdix Ufik _Ike
City of Fort Collins
1-3
Z. ,�%c� /✓�wr c a F r/-�� ?c,4T
Go RROC
,
�� `�fGs �LS'OlGf4T�a��LrC7✓¢L l��S /`'fANc� �rOoS ?�/Z s4//y/3oc.s
nn
a;,j ��ti�.d�C1 .
�Y-f� Ct�CrJT Q!/42�c3�. Cv/C/v I')?o NiJrn�'� l 4-S c�
��SG /z t !jd a Q 3Lj sl-f ties T SO F / S ^1 d r LcJ ffT ! J //(/
3,
l T' 72) 7 7-2•4,-- - �4 7W /S
aE
ZOrs 6 /S 1,24 r 7
/L/676 o
c-nfAIV 7`4 0�-S G d�?,� �c7--/ a,u� ,,4 Zcs 1`4,4.4vr