HomeMy WebLinkAboutWARREN SHORES - Filed GC-GENERAL CORRESPONDENCE - 2011-12-12M
August 31, 1979
Mr. O.K. Sherwood
O.K. Sherwood and Associates
412 South Howes Street
Fort Collins, CO 80521
Dear Mr. Sherwood:
In reference to your letter dated August 27, 1979 and the accompanying
storm drain plan and profile to correct the drainage problem encountered
at.825, 830 and 831 Warren Landing, Fort Collins, Colorado.
We the undersigned have reviewed the proposed storm drain plan and
profile prepared by James H. Stewart and Associates and find it to
satisfactorily achieve our goals, with the following additions to the
notes on the plan:
1. It is understood that the fence at the north east corner
of 825 Warren Landing shall not be removed.
2. It is understood that any construction damage to existing
facilities such as underground lawn sprinkling system etc.
shall be repaired promptly and in a manner that will restore
the facility to its original capacity and appearance.
3. It is understood that this plan has been approved by the
City of Fort Collins Engineering Department and other
regulatory boards.
Sincerely,
�Ttobert .A. Bo dig ry MlAmart
830 Warren Landing 825 rren Landing
Fort Collins, CO 80525 Fort Collins, CO 80525
RAB/plb
cc: Bartran Construction Co.
Storm Sewer Engineer, Fort Collins, CO
Wm. H. Halliwell
831 Warren Landing
Fort Collins, CO 80525
In
M
CITY OF FORT COLLINS
TO: Warren Landings Subdivision File
THRU: Mauri Rupel, Development Engineer%l
Robert Zakely, Chief Construction Inspecto
FROM: Robert W. Smith, Stone Drainage Engineer
DATE: September 17, 1979 (/
RE: Warren Landings Stone Drainage Problem
Attached is a copy of a letter that was received from Mr. Wm.. H. Halliwell
regarding the storm drainage problem at 830 Warren Landings.
I have forwarded the attached copy for your information and if you have any
questions on the matter, please feel free to contact me.
RWS/cb
enclosure