Cameron Gloss
City of Fort Collins
Planning Department
Re: PVHS Harmony Campus
MOB II
Concept Review Comments
MEETING DATE: January 5, 2004
ITEM: Poudre Valley Health Systems Harmony Campus Medical
Buildings
APPLICANT: BHA Design
c/o Angie Milewski
4803 Innovation Drive.
Fort Collins, CO 80525
LAND USE DATA: A request to construct a 60,000 sq. ft expansion to the existing
ambulatory care facility, and construct a free-standing 22,500 sq. ft. medical office
building, at the existing PVH Harmony Campus.
Zoning (Jenny Nuckols, 221-6760 jnuckols(aD_fcgov.com):
1. Comment: The land uses within the project are permitted in the HC zoning
district as a Type I (Administrative) Review.
Response: Comment noted.
2. Comment: Medical offices are permitted a maximum of 4.5 parking spaces
per 1,000 sq. ft. of floor area. The City's Land Use Code makes a provision
for an "exception" to this limitation.
Response: See exception to standards application included with this submittal.
Light and Power (Bruce Vogel, 221-6700 bvogel(a-)_fcgov.com):
1. Comment: Relocation of existing transformer will be at the applicant's
expense; the transformer must be located within 10 feet of a paved surface.
Response: Comment noted. Final location of transformer shall be shown on PDP
submittal.
2. Comment: Development Charges will be due as development proceeds
within the development.
PVH Harmony Medical Offices crt Responses 3 23 04.doc Page 1 of 5
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Please provide construction stormwater runoff management report, calculations, and plans per
city specifications. Response: These will be provided with the FCP submittal.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: traffic
Number: 2 Created: 2/12/2004
[2/12/04] The Transportation Impact Study is acceptable. The intersection of Snow
Mesa/Harmony will need to be designed as a right-in/right-out. I do have concerns regarding the
lack of connections of this time to the surrounding neighborhoods. In particular, Snow Mesa to
the south and Timberwood to the east. Previous discussions and submittals indicated that the
connections would be made with the next filing (this is the next filing) Discussions with PVH at this
time have made them aware of the issues. The lack of connectivity will need to be "pushed up
the ladder" and P&Z will need a clear understanding of the factors involved in not making those
connections at this time. Response: We will be submitting a traffic study addendum to
address this.
Additionally, we will need to have a thorough examination of the right-in/right-out design in order
to assure that violation of the median will be most difficult. Response: We will be submitting a
traffic study addendum to address this.
The developer should also consider a small roundabout at the intersections of Snow Mesa/private
drive, Snow Mesa/Timberwood, and the southern intersection of Snow Mesa and Timberwood. A
roundabout design will help control speeds through the property. Response: The developer
may consider this, but is not shown at this time.
Department: Transfort Issue Contact: Garold Smith
Topic: Plat
Number: 12 Created: 2/23/2004
[2/23/04] No Comments
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 35 Created: 2/25/2004
[2/25/04] For the interim Snow Mesa Street design the bike lane striping should remain along the
curbside of the roadway as it approaches Harmony. When the Snow Mesa/Harmony intersection
is signalized and opened for all turning movements then the bike lane should transition between
the right turn lane and the through lane. Response: Acknowledged.
Number: 36 Created: 2/25/2004
[2/25/04] Please clarify; will the private drive leading to the existing PVH campus be constructed
with this project? Response: Yes.
Number: 37 Created: 2/25/2004
[2/25/04] According to the TIS and previous conversations a temporary 8' asphalt path was
planned to connect the proposed development to Timberwood to satisfy a portion of the LOS
criteria. Please include this path on subsequent submittals. Suggestion; this path could be shared
with the temporary fire lane if the lane is paved and a connection to the lane is made from Snow
Mesa. Response: Acknowledged.
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 5 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Number: 38 Created: 2/25/2004
[2/25/04] Please label the 8' width and surface material for the sidewalk/trail along Harmony
Road on the utility plans. Will these improvements connect to the sidewalk/trail stubbed to the
east? Response: Yes, the future sidewalk will connect to the existing 8-foot walk.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 29 Created: 2/24/2004
[2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services, manholes, etc.
Response: Acknowledged.
Number: 30 Created: 2/24/2004
[2/24/04] Provide all appropriate standard detail on the next submittal. Response:
Acknowledged.
Number: 31 Created: 2/24/2004
[2/24/04] Clearly define the abandonment procedure for the existing 12-inch water main.
Response: Acknowledged.
Number: 32 Created: 2/24/2004
[2/24/04] Provide profiles for all 12-inch and larger water lines as well as sanitary sewer lines.
See site, landscape and utility plans for other comments. Response: Acknowledged.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 3 Created: 2/12/2004
[2/12/04] What kind of walkway is planned from the HC ramp to the main entrance? -please note
on site plan. Response: Acknowledged and shown on the drawings.
Number: 4 Created: 2/12/2004
[2/12/04] Show and label bike rack near main entrance to building. Response: Acknowledged
and shown on the drawings.
Number: 5 Created: 2/12/2004
[2/12/04] Show and label building dimensions and envelope on site plan. Response:
Acknowledged and shown on the drawings.
Number: 6 Created: 2/12/2004
[2/12/04] Note stall dimensions for handicap stalls - note - at least one of the stall needs to be
van accessible and signed as such on site. Response: Acknowledged and shown on the
drawings.
Number: 7 Created: 2/12/2004
[2/12/04] Note building height on elevations. Response: Acknowledged and shown on the
drawings.
Number: 8
Created: 2/12/2004
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 6 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
[2/12/04] Need to label plants and counts on landscape plan. Response: The plant list on the
PDP planting plan is representative, a more detailed plan will be created at the FCP level.
Number: 9 Created: 2/13/2004
[2/13/04] As the plants are not labeled, I can't tell if you have trees around the building, but it
appears that the plan does not meet full tree -stocking requirements. Response: Acknowledged.
We believe that we have satisfactorily responded to all comments. Please contact me if
you have any additional comments or concerns at (970) 495-6353.
Sincerely
Robert J. ooney
Project Ar hitect
Xc: Angie Milewski, BHA Design
Jim Allen -Morley, Sear -Brown Engineering
Dean Barber, McWhinney Enterprises
Matt Delich
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 7 of 7
City of Fort Collins
Project Comments Sheet
Selected Departments "V
Department: Engineering
Date:
Project: April 20, 2004
PVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MEDICAL
OFFICE BUILDING II PDP - TYPE I
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
April 21,2004
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: General
Number: 15 Created: 4/20/2004
[4/20/04] No comments on this PDP submittal. Will have comments on Final
Compliance Plan. Engineering okay for hearing
Dave Stringer
Signature
April 20, 2004
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
Project Comments Sheet
City of Fort Collins Selected Departments
GMV
Department: Stormwater Utility
Date: April 21, 2004
Project:
PVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MEDICAL
OFFICE BUILDING II PDP - TYPE I
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
April 21, 2004
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 28 Created: 4/21 /2004
Please discuss in the text of the report how water quality mitigation will be achieved.
This should be included in the report before the hearing.
Number: 29 Created: 4/21 /2004
Please provide a preliminary site specific grading plan for the proposed site. This
should be included in the utility plan set before the hearing.
Number: 30 Created: 4/21 /2004
At final plan review, all the coordination efforts between the various filings for the
construction of the drainage improvements needs to be documented with this drainage
report.
Topic: Erosion/Sediment Control
Number: 31 Created: 4/21 /2004
1. Plan will be reviewed when a complete sediment/erosion control plan is submitted per
City of Fort Collins specifications.
')Ub
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ✓ Site t/ Drainage Report Other
Utility Redline Utility Landscape
Page 1 `� ire JK•�
Fort Collins
Denver
Colorado Springs
P.O. Box 2127 (80522)
Eighteenth Street Atrium
P.O. Box 1478
2620 E. Prospect Road, Suite 100
1621 18th Street, Suite 250
Colorado Springs, CO
Fort Collins, CO 80525
Denver, CO 80202
80901-1478
(970) 493-8747
(303) 296-0383
(719) 633-4713
Archistruction(D (970) 493-5869 FAX
(303) 296-0382 FAX
(719) 633-9508 FAX
April 30, 2004
Cameron Gloss
City of Fort Collins
Planning Department
Re: PVHS Harmony Campus
MOB II
Concept Review Comments
Dear Cameron:
We offer the following responses to the PDP Review Comments from City Planning Staff
dated 4/23/04.
Current Planning (Cameron Gloss, 221-6750 cgloss(a-fcgov.com):
1. Comment: No information was provided regarding the proposed exterior
building materials and colors. Please add to the building elevations a
summary list of all building materials and the colors of each to ensure
compatibility with the existing medical office building.
Response: Building materials and colors are now shown on the attached Exterior
Elevation Sheet.
2. Comment: Please remove the word "Preliminary" from the plat. Action taken
by the Hearings Officer on this application are based on this document being
the final version.
Response: We have changed the wording to "A Plat of (For Preliminary
Purposes)."
Engineering (Dave Stringer, 221-6605, dstringer(a)fcgov.com):
No comments on this PDP submittal. Will have comments on Final Compliance
Plan. Engineering okay for hearing
Light and Power (Alan Rutz, 221-6700, arutz(aD-fcgov.com):
1. Comment: Underground electric lines on the Utility Plan and other plans are
not shown in their correct location. Please locate and show the correct
location of electric lines, vaults and transformers on the Utility Plan. Final
comments or approval of the plans cannot be made without this being
corrected.
Response: These are now shown on the plan per City of Fort Collins drawings.
PVH Harmony Medical Offices crt Responses 4 30 04 Page 1 of 6
PVHS Harmony Campus
MOB II
April 30, 2004
Concept Review Comments
2. Comment: There is an existing electric line under the proposed walkway
connecting the two buildings. Please submit details of this part of building
and its foundation. Include plan and profile details of the existing electric
line and proposed building walkway. System modification charges will apply
to any electric system that needs to be relocated.
Response: We have provided one preliminary section for the proposed walkway
connection showing the approximate depth of footing and approximated depth of
electrical lines. We will request a line locate prior to excavation, and perhaps "pot-
hole" to verify the depth of the line. If necessary, adjustments will be able to be
made to the foundation wall to accommodate a shallow installation.
3. Comment: On the Landscape Plan show the electric vault located on the
north side of the proposed building and remove landscaping from around
the vault.
Response: Acknowledged, see Landscape Plan.
4. Comment: Submit Commercial Service Information Form (C-1) with building
load requirements.
Response: Attached hereto.
5. Comment: On the Utility Plan show where electric meter and CT cabinet will
be located on the building and coordinate the transformer location with Light
& Power.
Response: Acknowledged, see Utility Plan.
Police (Joseph Gerdom, 221-6550, jgerdom(a�fcgov.com)
1. Comment: Lighting levels at south end - drive/loading area - fall below
required 1.Ofc.
Response: We will consider modification of the lighting to accommodate the
lighting levels.
2. Comment: Ornamentals along north side of building may block surveillance
of parking lot from building.
Response: We acknowledge the concern about parking surveillance, however, we
feel that there is enough clearance under the branches and between the trees at
pedestrian level to accommodate surveillance.
3. Comment: Private/maintenance doors should have lighting and viewports.
Response: Acknowledged. This will be done with the construction documents as
those rooms are identified.
PVH Harmony Medical Offices crt Responses 4 30 04 Page 2 of 6
PVHS Harmony Campus
MOB II
April 30, 2004
Concept Review Comments
Storm Drainage (Wes Lamarque, 221-6700 wlamargue(aD-fcgov.com):
Comment: Please discuss in the text of the report how water quality
mitigation will be achieved. This should be included in the report before the
hearing.
Response: This is now in the drainage report.
2. Comment: Please provide a preliminary site -specific grading plan for the
proposed site. This should be included in the utility plan set before the
hearing.
Response: A larger scale drawing is now provided.
3. Comment: At final plan review, all the coordination efforts between the
various filings for the construction of the drainage improvements needs to
be documented with this drainage report.
Response: Acknowledged and will be included in the final review plan.
Erosion/Sediment Control
1. Comment: Plan will be reviewed when a complete sediment/erosion control
plan is submitted per City of Fort Collins specifications.
Response: Comment is noted.
Transportation Planning (David Averill, 221-6608 daverill(a-fcgov.com):
1. Comment: Please provide a walkway connection from the walkway along the
north side of the drive aisle to the sidewalk/trail along Harmony Road. It
should be designed similar to the walkway connection to the west that
connects the sidewalk/trail to the hospital's main entrance. Also the
crosswalk across the drive aisle should be designed similar to the crosswalk
design to the west (see red lines).
Response: Acknowledged, see plans for corrections.
2. Comment: Please consider increasing the widths of the 6 foot attached
walkways along the walkway spine through the parking lot to a minimum 7
foot width. Potential users of the walkways accessing the medical building
could be people in wheelchairs, in casts, using crutches, etc... and the extra
width will increase their mobility since two feet of the walkway will be taken
up by cars overhanging into the walkway. This would leave a minimum of a 5
foot clear space enough for two wheel chairs to pass each other.
Response: Acknowledged, see plans for corrections.
PVH Harmony Medical Offices crt Responses 4 30 04 Page 3 of 6
PVHS Harmony Campus
MOB II
April 30, 2004
Concept Review Comments
3. Comment: Will the handicap parking stalls along the walkway spine be flush
with the walk and landscaping? Or will there be a raised curb with access
ramps every 9 feet?
Response: There will be ramps at each end of the accessible parking bays and the
parking spaces will have curb stops. These ramps have not been designed and
detailed, however their location has been indicated on the site plan.
4. Comment: Will the drive aisle that goes in front of the new medical building
be extended to the east with future expansion?
Response: Yes, with a future phase the access drive will be extended.
5. Comment: To separate pedestrians from motor vehicles in the large parking
lot construct a walkway through the landscaped islands to the major
walkway spine (see redlines).
Response: Acknowledged, see plans for corrections.
Water/Wastewater (Roger Buffington, 221-6700 rbuffinc1ton(a)-fcgov.com):
1. Comment: Provide utility easements for all sanitary sewer mains and offsite
utility easements for sanitary sewer services which cross adjacent lots.
Response: These will be provided with the FCP Plans.
2. Comment: Include all appropriate water and sewer details with the final
submittal.
Response: These will be provided with the FCP Plans.
3. Comment: Our records indicate that a 4-inch and 6-inch water lines were
stubbed out for this building. Clearly define the abandonment of the existing
4-inch water line and installation of the proposed 1 1/2-inch water service.
Response: This has been noted in general and will be shown in detail for the final
plans.
4. Comment: See site, landscape and utility plans for other comments.
Response: All other comments shown on these plans have been corrected.
Zoning (Jenny Nuckols, 221-6760 jnuckols(a)fcgov.com):
1. Comment: The dashed areas, denoting existing parking, will there still be
some handicap spaces on the west side of the proposed building. It's
unclear on the site plan.
Response: With this re -submittal only one accessible space is being removed in
front of the ACC. The MOB II has 10 accessible spaces which is three more than
the code requires. The accessible spaces in front of the ACC are very rarely used.
PVH Harmony Medical Offices crt Responses 4 30 04 Page 4 of 6
PVHS Harmony Campus
MOB II
April 30, 2004
Concept Review Comments
2. Comment: Please remove topo lines from final site plan
Response: Acknowledged. The topo lines are now removed.
3. Comment: It doesn't look like the building meets our commercial building
standards, there isn't any articulation, no apparent base or top treatments -
its needs some pizzazz.
Response: We believe that the design intent will be clearer now that notes are on
the elevations. There is vertical and horizontal movement for a section of the north
and south elevations. There are additional changes in brick colors in the horizontal
bands. There are insets of brick panels under the windows. The building is
designed along the same detailing as the existing MOB, except that we are
changing the location of some of the vertical changes of brick.
4. Comment: Building height needs to be shown on elevations as well as
materials, colors etc.
Response: Building height is now shown on the Exterior Elevations.
5. Comment: Landscaping needs to be shown on the east end of the parking
lot perimeter.
Response: The eastern edge of the parking is part of a second phase, which will
be an extension of the parking lot. Any landscaping installed would just have to
be removed in the next phase; therefore we are not planning on installing any
landscaping along the eastern edge of the parking lot.
6. Comment: On the landscape plan, show plat counts and codes on the plan
as well as counts on the key
Response: Plant call outs and counts will be shown at final design.
7. Comment: Show handicap ramps at HC spaces, crosswalks etc
Response: Acknowledged, see plans for indicated items.
8. Comment: Any trash/recyclable enclosures proposed??
Response: This development will be able to share the existing service area behind
the existing ACC, therefore no trash enclosure is needed.
PVH Harmony Medical Offices crt Responses 4 30 04 Page 5 of 6
PVHS Harmony Campus
MOB II
March 23, 2004
Concept Review Comments
Response: Comment noted.
3. Comment: Public street lighting will need to be provided along Snow Mesa
Drive. Please coordinate this design with Light and Power.
Response: Comment noted and acknowledged.
Poudre Fire Authority (Ron Gonzales, 221-6570):
1. Comment: Fire hydrants must be located within 300 feet of all buildings
capable of delivering water flows of 1,500 gal/min at 20 psi.
Response: Final location of fire hydrants will be coordinated to provide this
minimum.
2. Comment: Address numbers for the buildings must be visible from the
street, with a minimum of 6-inch letters on a contrasting background.
Response: Final location of lettering will be shown on PDP submittal.
3. Comment: PFA will need to evaluate whether the 2"d point of access is
acceptable -such areas are shown on private property on the conceptual site
plan (parking aisles/private loop drive).
Response: We request that this determination be made quickly, as it affects the
cost of the development of the project. Refer to response #4 under Engineering
comments.
4. Comment: Buildings may need to be fire sprinklered, based on occupancy,
square footage and design.
Response: Comment acknowledged. Final determination on fire sprinklering will
be verified with both the Fire Authority and the Building Department.
Water/Wastewater (Roger Buffington, 221-6700 rbuffington(CDfcgov.com):
1. Comment: There are existing mains in the following locations: 12-inch water
main in N private drive, 12-inch sewer in S future street R.O.W., 12-inch water
and 8-inch sewer in Timberwood to the E and additional mains included in
the PVH Infrastructure plans currently under review.
Response: Comment is noted. Water and sanitary sewer service are anticipated to
be taken north of the Primary Care Project from the water and sewer in the private
road to the north of the building.
2. Comment: Limit the earthwork and berming along the S side of Harmony to
minimize the fill placed over the 30-inch water transmission main.
Response: The berming will be discussed with water/wastewater during the design
process.
3. Comment: Use existing water/sewer stubs or abandon at the main.
Response: Comment noted.
4. Comment: The water conservation standards for landscape and irrigation
will apply.
Response: Comment noted.
S. Comment: Development fees and water rights will be due at building permit.
PVH Harmony Medical Offices crt Response% 3 23 04.doc Page 2 of 5
PVHS Harmony Campus
MOB II
April 30, 2004
Concept Review Comments
We believe that we have satisfactorily responded to all comments. Please contact
me if you have any additional comments or concerns at (970) 495-6353.
Sincerely
Robert J. M. oney
Project Architect
Xc: Angie Milewski, BHA Design
Jim Allen -Morley, Sear -Brown Engineering
Dean Barber, McWhinney Enterprises
Matt Delich
PVH Harmony Medical Offices crt Responses 4 30 04 Page 6 of 6
Project Comments Sheet
Selected Departments
City of Fort. CollinsCOPY
Department: Engineering
Date: May 18, 2004
Project:
PVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MEDICAL
OFFICE BUILDING II PDP - TYPE I
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
May 19, 2004
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: General
Number: 15
[5/18/04]
[4/20/04] No comments on this PDP submittal.
Compliance Plan. Engineering okay for hearing
Created: 4/20/2004
Will have comments on Final
Date
.CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
f lat A'— Site / Drainage Report Other_
�y Utility Redline Utility Landscape
Page 1
PVHS Harmony Campus
MOB II
March 23, 2004
Concept Review Comments
Response: Comment noted.
Engineering (Dave Stringer, 221-6605, dstringerCa)-fcgov.com)
I. Comment: Street Oversizing Fees are available for Cambridge Drive is
designated as a Collector street. The applicant should contact Matt Baker at
(970) 224-6108 to determine the estimated fees.
Response: Comment noted.
2. Comment: A State Highway Access permit may be required.
Response: Comment noted. The access permit will be applied for with the
Infrastructure Package.
3. Comment: Please contact Eric Bracke, City Traffic engineer, at 221-6630 to
review the project scope and determine what level of Transportation
Analysis, if any, will be needed.
Response: Meeting has been held.
4. Comment: A 2"d point of vehicular access will need to be constructed in
order to meet emergency access requirements.
Response: Two additional points of emergency access are provided. One is east
of the Corbett Intersection on Harmony Road. The other will be an all weather
road that enters from Timberwood east and goes north to the Primary Care Project
Storm Drainage (Wes Lamarque, 221-6700 wlamargue(&-fcgov.com):
1. Comment: This site is in the McClelland/Mail Creek drainage basin where the
new development fee is $3,717.00/acre which is it is subject to the runoff
coefficient reduction. This fee is to be paid at the time the building permit is
issued.
Response: Comment noted.
2. Comment: A drainage and erosion control report and construction plans are
required and they must be prepared by a Professional Engineer registered in
Colorado.
Response: Comment noted.
3. Comment: Onsite detention is required with a 0.2 cfs release rate for the 10
year storm and a 0.5 cfs release rate for the 100 year storm. Extended
detention is required for water quality treatment.
Response: Comment noted. This will be provided by a phased detention pond in
the south detention pond
4. Comment: This site is on the Stormwater Utility inventory map 12Q.
Response: Comment noted.
Transportation Planning (David Averill, 221-6608 daverillCaD-fcgov.com):
1. Comment: The Transportation Impact Analysis needs to address all modes.
Response: Matt Delich will review requirements with you.
PVH Harmony Medical Offices crt Response3 3 23 04.doc Page 3 of 5
PVHS Harmony Campus
MOB II
March 23, 2004
Concept Review Comments
Current Planning (Cameron Gloss, 221-6750 cgloss fcgov.com):
I. Comment: A neighborhood meeting is not required for a Type I PDP
application; however, staff would help facilitate a neighborhood meeting if it
is desired by the applicant. If the applicant wishes to go forward with a
neighborhood meeting, please contact the Current Planning Department to
assist in coordination.
Response: Acknowledged.
2. Comment: All of the uses proposed by the applicant as of this time are
permitted under a Type I Administrative Review.
Response: Acknowledged.
3. Comment: The project will be subject to the design standards in Article 3 and
the HC zone district standards of Article 4,of the Land Use Code, and the
Harmony Corridor Design Standards.
Response: Acknowledged.
4. Comment: In order to exceed the maximum off-street parking permitted, the
applicant will not to apply for an "exception to the general office parking
standard". Please refer to Section 3.2.2(K)(4), subsections (a) and (b)
outlining the procedure and review criteria.
Response: See exception to standard application included with this submittal.
Natural Resources (Doug Moore, 221-6650, dmoore _fcgov.com):
1. Comment: Please contact City Forester, Tim Buchanan, at 221-6660 to
determine whether existing trees can be removed from the site and if tree
mitigation will be required.
Response: There are no existing trees to be removed.
2. Comment: Staff will review the previously submitted Ecological
Characterization Study and pass along any requirements.
Response: Please forward these as soon as possible as issues will be a cost to
development.
3. Comment: A Fugitive Dust Control Permit will need to be obtained from
Larimer County.
Response: Acknowledged. A Fugitive Dust Control Permit will be obtained prior to
any sitework.
4. Comment: Please use native plants and grasses to the maximum extent
possible.
Response: Acknowledged.
We believe that we have satisfactorily responded to all comments. Please contact
me if you have any additional comments or concerns at (970) 495-6353.
PVH Harmony Medical Offices crt Response4 3 23 04.doc Page 4 of 5
PVHS Harmony Campus
MOB II
March 23, 2004
Concept Review Comments
Sincerely
Robert J. Mooney
Project Architect
Xc: Angie Milewski, BHA Design
Jim Allen -Morley, Sear -Brown Engineering
Dean Barber, McWhinney Enterprises
Matt Delich
PVH Harmony Medical Offices crt Responseg 3 23 04.doc Page 5 of 5
' I I A /A4 A
MAN N--R~
Arch islruction
O
March 30, 2004
Cameron Gloss
City of Fort Collins
Planning Department
Fort Collins
P.O. Box 2127 (80522)
2620 E. Prospect Road, Suite 100
Fort Collins, CO 80525
(970) 493-8747
(970) 493-5869 FAX
Re: PVHS Harmony Campus
Primary Care Plaza
PDP Review Comments
Dear Cameron:
Denver
Eighteenth Street Atrium
1621 18th Street, Suite 250
Denver, CO 80202
(303) 296-0383
(303) 296-0382 FAX
Colorado Springs
P.O. Box 1478
Colorado Springs, CO
80901-1478
(719) 633-4713
(719) 633-9508 FAX
We offer the following responses to the PDP Review Comments from City Planning Staff
dated 3/1/04.
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: General
Number: 23 Created: 2/24/2004
[2/24/041 Due to the nature of the use, pedestrian access ramps accommodating the
needs of physically disabled patrons, and people pushing strollers or wheelchairs, will
need to be provided in convenient locations. It does not appear that the primary field of
parking east of the building provides direct, safe, and convenient access for these users.
Since complete separation of vehicles and pedestrians is not possible with the proposed
site plan, special paving, pavement markings, and other hardscape and landscape
elements should be used to clearly delineate pedestrian areas. Response:
Acknowledged, see new site plan.
Number: 24 Created: 2/24/2004
[2/24/04] Staff supports the applicant's request for an exception to the maximum general
office park standard, finding that the additional spaces are necessary to serve needs of
the development. Response: Acknowledged.
Number: 25 Created: 2/24/2004
[2/24/041 The fagade facing Snow Mesa Drive is designed such that the building "turns its
back" to the street. There is a relative lack of architectural features, including the
fenestration that would project the importance of this side of the building. A primary
pedestrian entrance, with a clearly defined entry element should be provided. Response:
Due to the nature of the use of this specific type of medical use, locating a primary
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 1 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
pedestrian entrance on the "street" side was impractical. Therefore, we have
changed the layout to accommodate your concerns by shifting the parking lot to
the west, placing the fagade and the primary pedestrian entry to the west.
Number: 26 Created: 2/24/2004
[2124/04] A direct pedestrian connection between the building entry(s) and the public
sidewalk along Snow Mesa Drive must be provided. Response: Three pedestrian
connections are show from the building to snow mesa. Also, see response to
number 25 above.
Number: 27 Created: 2/24/2004
[2/24/04] Overall, the building has a relative lack of articulation. Door and window
openings have very little, if any, projection or inset that would create more interesting
shadow and texture. Lintel and sill treatments, and other window details, have not been
employed which will provide visual interest. The building reads as "flat". Response: A
portion of the reason the building reads as "flat" has to do with the CADD drawings
presented. The intention is to have movement of the materials around the windows
as requested. Along with shifting the main facade to the west elevation, we have
added gable dormers to the north and south elevations (with engaged columns)
and increased the depth of the roof overhang. The basic massing items are better
shown in some additional drawings we are providing.
Number: 28 Created: 2/24/2004
[2/24/04] Building materials should reflect the existing PVH Harmony Campus building
and those projected in future phase. Response: The building materials will be
dictated by the newly developed Guidelines created by the Developer (McWhinney
Enterprises) and the Hospital. The materials are shown on the drawings and
include the following:
a. Brick base — to match the colors of the existing campus brick
b. Stone accents — around the engaged columns at the entries to match the
existing buildings.
c. EIFS (synthetic stucco) — using the color palettes of the existing building,
the guidelines allow some use of this product. (The backside of the
existing ACC building also contains this product.)
d. Painted steel beams at entryways.
e. High profile asphalt/composite shingles — the use of this product is
allowed on the "East Campus" only by the Guidelines.
Department: Current Planning Issue Contact: Ginger Dodge
Topic: Street Names
Number: 1 Created: 2/9/2004
[2/9/04] Snow Mesa Drive is acceptable only if an extension of the existing Snow Mesa Drive.
Response: The alignment of this portion of the drive is intended to be the extension of the
existing Snow Mesa Drive.
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 2 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Department: Engineering Issue Contact: Dave Stringer
Topic: General
Number: 10 Created: 2/23/2004
[2/23/04] Snow Mesa and Harmony will need to be designed as an interim intersection until such
time as the connection of Snow Mesa to Timberwood or the connection with Snow Mesa to the
south warrants a signalized intersection. Response: We are aware that the City is in
negotiation with the Hospital and the Developer to resolve this issue.
Number: 14 Created: 2/23/2004
[2/23/04] Sheet 1/15 Use lighter shading on vicinity map; indicate what typical crossing refers to.
Response: Acknowledged and revised to a lighter shading on the drawings.
Number: 15 Created: 2/23/2004
[2/23/04] Following comments, refer to final development plans sheets. Use type III barricades at
termination of streets (public and private), identify curb and gutter types, provide cross section of
emergency access road. What does traffic barrier look like? Need PFA approval, provide cross
section of pond embankment, drainage channel along east side, outlet, etc. Response:
Comment noted and will be addressed at FCP submittal.
Number: 16 Created: 2/23/2004
[2/23/041 Where are the off -site sanitary sewer plans? Need to identify what is being built with
this plan versus other plans. Response: There is not off -site sewer. The sewer in the
phasing Plan is what needs to be constructed.
Number: 17 Created: 2/23/2004
[2/23/04] Engineering okay with setting hearing date. Need approval for hearing from other
departments. Response: Acknowledged.
Topic: Plat
Number: 11 Created: 2/23/2004
[2/23/04] Need to indicate that area out side of building envelope is an emergency access and
utility easement, or identify the area that is for emergency use. Response: The emergency
access designation will be added at the final plat.
Number: 18 Created: 2/23/2004
[2/23/04] Change name of street from Timber Trail to Snow Mesa. Change Timber Trail to
Timberwood. Response: The street names have been corrected.
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 19 Created: 2/23/2004
[2/23/04] Electric line will be extended from existing parking lot along private drive to project site.
Response: Acknowledged.
Number: 20 Created: 2/23/2004
[2/23/04] The developer is responsible for lighting along private drives. Light and Power will
install floodlights for labor and material cost if requested. There is a monthly maintenance and
usage fee per floodlight. Response: Acknowledged.
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 3 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Number: 21 Created: 2/23/2004
[2/23/041 Contact Light and Power with load requirements and to coordinate transformer location.
Response: Acknowledged.
Number: 22 Created: 2/23/2004
[2/23/04] Contact Light and Power for development and construction costs. Response:
Acknowledged.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 39 Created: 2/26/2004
[2/26/04] After reviewing development files for the Overall Development Plan and prior filings, 1
have found that an Ecological Characterization Study and a wetland delineation has never been
filed for the Poudre Valley Health System Harmony Campus. Through review of these files and
natural habitats and features mapping I have determined based on the critical from section
3.4.1(A) of the Land Use Code that the Natural Resources Department does not need to require
either study at this time. No further issues on this project that this time. Response:
Acknowledged.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 13 Created: 2/23/2004
(2/23/04] Landscape plan does not reference landscape material list - cannot evaluate. Exit doors
should have overhead light and viewport (employee/maintenance access). Response: The
plant list on the PDP planting plan is representative, a more detailed plan will be created at
the FCP level.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Drainage
Number: 34 Created: 2/24/2004
[2/24/04] Please show how drainage will go from building and parking lot area to the detention
pond in interim. A culvert is needed under Timberwood Drive to take flows from swale along east
property line to the proposed detention pond. Please define better on the plans what portion of the
detention pond will be built with this first phase. Response: The drainage from the site will
drain via swale to the main north -south channel and then by the culvert to the partially
built detention pond. We will do the final design of the that portion of the detention pond at
FCP submittal.
Topic: General
Number: 33
[2/24/04]
Created: 2/24/2004
Sediment/Erosion Control Plan Comments
Poudre Valley Health Systems Harmony Campus 3rd Filing
February 13, 2004
Number 1
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 4 of 7