HomeMy WebLinkAboutNEW HAMPSHIRE - Filed EV-EASEMENT VACATION - 2011-10-27City of Fort Collins
MEMORANDUM
TO: Dennis Greenwalt, AT& T Broadband
Lin Spencer, Qwest
Stephanie Rich, Xcel Energy
Glen Schluter, Stormwater
Roger Buffington, Water/ Wastewater
Doug Martine, Light and Power
FROM: Susan Joy, Development Review Engineer
DATE: February 24, 2006
RE: REQUEST TO VACATE A PORTION OF A UTILITY EASEMENT
Attached for your review and comment are two sketch plans showing Lot 2 of the New
Hampshire Subdivision, an approved project located on Eastbrook Drive (northwest corner of
Timberline and Danfield Court). There is an existing 20' utility easement and the applicant
would like to vacate 10' of that. There would still be a 10' utility easement from the property
line that would accommodate the existing utilities. Please see the attached sketches showing the
existing lot, easements, and utility placement to determine if you have an objection or concern to
the proposed vacation.
Please sign and return any comments to Susan Joy in the Development Review Department by
March 10, 2006. If no correspondence has been returned by this date, it will be assumed that you
have no objections to the proposed vacation. Please feel free to contact me at 970/221-6605, ext.
76.56�if you have any questions. Thank you.
v No Problems
Problems/Concerns as follows:
City of Fort Collins
MEMORANDUM
TO: Dennis Greenwalt, AT& T Broadband
Lin Spencer, Qwest
Stephanie Rich, Xcel Energy
Glen Schluter, Stormwater
Roger Buffington, Water/ Wastewater
Doug Martine, Light and Power
FROM: Susan Joy, Development Review Engineer
DATE: February 24, 2006
RE: REQUEST TO VACATE A PORTION OF A UTILITY EASEMENT
Attached for your review and comment are two sketch plans showing Lot 2 of the New
Hampshire Subdivision, an approved project located on Eastbrook Drive (northwest corner of
Timberline and Danfield Court). There is an existing 20' utility easement and the applicant
would like to vacate 10' of that. There would still be a 10' utility easement from the property
line that would accommodate the existing utilities. Please see the attached sketches showing the
existing lot, easements, and utility placement to determine if you have an objection or concern to
the proposed vacation.
Please sign and return any comments to Susan Joy in the Development Review Department by
March 10, 2006. If no correspondence has been returned by this date, it will be assumed that you
have no objections to the proposed vacation. Please feel free to contact me at 970/221-6605, ext.
7656 if you have any questions. Thank you.
No Problems �f
r
Problems/Concerns as follows:
City of Fort Collins
MEMORANDUM
TO: Dennis Greenwalt, AT& T Broadband
Lin Spencer, Qwest
Stephanie Rich, Xcel Energy
Glen Schluter, Stormwater
Roger Buffington, Water/ Wastewater
Doug Martine, Light and Power
FROM: Susan Joy, Development Review Engineer
DATE: February 24, 2006
RE: REQUEST TO VACATE A PORTION OF A UTILITY EASEMENT
Attached for your review and comment are two sketch plans showing Lot 2 of the New
Hampshire Subdivision, an approved project located on Eastbrook Drive (northwest corner of
Timberline and Danfield Court). There is an existing 20' utility easement and the applicant
would like to vacate 10' of that. There would still be a 10' utility easement from the property
line that would accommodate the existing utilities. Please see the attached sketches showing the
existing lot, easements, and utility placement to determine if you have an objection or concern to
the proposed vacation.
Please sign and return any comments to Susan Joy in the Development Review Department by
March 10, 2006. If no correspondence has been returned by this date, it will be assumed that you
have no objections to the proposed vacation. Please feel free to contact me at 970/221-6605, ext.
7656 if you have any questions. Thank you.
A— No Problems
Problems/Concerns as
au�s� bs 4mkAL, To
'or
RECE,VE
NAR 0,8
2
Op
CURRENT PL41 %, 6
NG
City of Fort Collins
MEMORANDUM
TO: Dennis Greenwalt, d
Lin Spencer, Qwest
Stephanie Rich, Xcel Energy
Glen Schluter, Stormwater
Roger Buffington, Water/ Wastewater
Doug Martine, Light and Power
FROM: Susan Joy, Development Review Engineer
DATE: February 24, 2006
RE: REQUEST TO VACATE A PORTION OF A UTILITY EASEMENT
Attached for your review and comment are two sketch plans showing Lot 2 of the New
Hampshire Subdivision, an approved project located on Eastbrook Drive (northwest corner of
Timberline and Danfield Court). There is an existing 20' utility easement and the applicant
would like to vacate 10' of that. There would still be a 10' utility easement from the property
line that would accommodate the existing utilities. Please see the attached sketches showing the
existing lot, easements, and utility placement to determine if you have an objection or concern to
the proposed vacation.
Please sign and return any comments to Susan Joy in the Development Review Department by
March 10, 2006. If no correspondence has been returned by this date, it will be assumed that you
have no objections to the proposed vacation. Please feel free to contact me at 970/221-6605, ext.
7656 if you have any questions. Thank you.
.�< No Problems
Problems/Concerns as follows:
MEMORANDUM
TO: Dennis Greenwalt, AT& T Broadband
Lin Spencer, Qwest
Stephanie Rich, Xcel Energy
Glen Schluter, Stormwater
Roger Buffington, Water/ Wastewater
Doug Martine, Light and Power
FROM: Susan Joy, Development Review Engineer
DATE: February 24, 2006
RE: REQUEST TO VACATE A PORTION OF A UTILITY EASEMENT
Attached for your review and comment are two sketch plans showing Lot 2 of the New
Hampshire Subdivision, an approved project located on Eastbrook Drive (northwest corner of
Timberline and Danfield Court). There is an existing 20' utility easement and the applicant
would like to vacate 10' of that. There would still be a 10' utility easement from the property
line that would accommodate the existing utilities. Please see the attached sketches showing the
existing lot, easements, and utility placement to determine if you have an objection or concern to
the proposed vacation.
Please sign and return any comments to Susan Joy in the Development Review Department by
March 10, 2006. If no correspondence has been returned by this date, it will be assumed that you
have no objections to the proposed vacation. Please feel free to contact me at 970/221-6605, ext.
7656 if you have any questions. Thank you.
No Problems
Problems/Concerns as follows:
titzmen-Mitchell & Co.
Professional real estate development, management and brokerage services
February 13, 2006
Mr. Marc Virata
City of Fort Collins, Civil Engineer II
281 North College Ave
Fort Collins, CO 80521
Re: Lot 2, New Hampshire Subdivision - Request to vacate utility easement
Dear Mr. Virata:
Currently, there exists a 20' wide utility easement across the easternmost portion of Lot 2, New
Hampshire Subdivision that was included on the original Plat of the New Hampshire Subdivision
back in 1980. The attached drawing reflects the location of this existing utility easement. This
easement is wider than necessary to accommodate anticipated utilities and wider than normally
required under current standards. The extra width of the existing easement conflicts with the
desired location of building envelopes on the property as now being proposed.
Given these circumstances, we respectfully request that this utility easement be narrowed to ten
feet (10') in width and that the westernmost 10' of the existing easement be vacated as illustrated
on the attached drawing. Based upon physical locates of utilities completed last week, there are
no existing utilities installed that would be negatively impacted by the vacation of easement as
proposed.
If the proposed easement vacation is acceptable, a complete legal description will be prepared by
a licen surveyor for inclusion with the final documentation.
Sin erely
4��
Dave Sitzman
President
Enclosure
Subsidiaries
SITZMAN-MITCHELL PROPERTY MANAGEMENT, INC. • SITZMAN-MITCH ELL COMMERCIAL BROKERAGE, INC.
3500 JFK PARKWAY • SUITE 220 • P.O. BOX 1208 • FORT COLLINS, COLORADO 80522
(970) 223-5500 • FAX (970) 223-5587 9 smco@sitzman-mitchell.com
LD
lD
O
existing 10" sonitory sewer on property line
found 11211 rebor wfth Illegible
'yr
19e49'59"E ' 410.001. ::r• ..... .
vj
omen( existing sewer manhole exlednp sewer manhole
-- ---- - -------------------__---- ---`--`-- -- -- - - -- ---;
1
1
1
I
15581 1 c
1 e
1 b I _
�o m
9F THE WEST 410. 00" OF L 0 T 4
I
1
< 1.
' 1
1 �
------------------------------------.-------
158, 389 TOTAL SQUARE FEET
LOT 2
1
1 r
Portion of Existing'. t
Easement to be 1 {7
Vacated
1 Y I
1
I
1 . •, t i ,
" � I
I; 1
erbtinp 8" .v(er senl's�e I:. 1 j.�'!
i t
1
1
I 1 �
1'
Existing Fiber
Optic Cable
M-e E„v 4 e"
r.
4
1 ,
r`
i
I
existing
JJ.5' wide
driveway cut
�o
(•k
1 b
street light
E�
b
I