Loading...
HomeMy WebLinkAboutCENTRE AVENUE RESIDENCES - Filed DCP-DEV. CONSTRUCTION PERMIT - 2011-03-30City of Planning, Development & Transportation Engineering Department 6rt Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: /— a-3 Issuance Date: -3A Project Name: Centre Avenue Residences — Phases 1 & 2 Project A.K.A.: Arrowhead Residences Project Location: Northeast Corner of Centre Avenue and Worthington Circle Permittee: Stan Everitt City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Tees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ Total $ �,70 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 0C15. Q 3 Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. No Text Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion ofpublic improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: Date: Approval for issuance: l City Engineer Appprr(��'yal: - Date: (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Centre Avenue Residences Project A.K.A.: Arrowhead Residences City Staff Contact Persons: Development Engineer: Andrew Carney, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6501 Fax 970-221-6378 Email: acarneynfc ov.com Construction Inspector: Wayne Lenard, 281 N. College Ave., Fort Collins, CO 80521 Office 970-416-2011 Cell: 970-222-6824 Email: wlenard - fc 7ov.com Current Planner: Ted Shepard, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6343 Fax 970-221-6378 Email: tsheuard_fc ov.com Erosion Control Inspector: D.A. Black, 700 Wood Street, Fort Collins, CO 80521 Cell 970-218-3011 Fax 970-221-6619 Email: dblack &fcgov.com Natural Resources: Erica Saunders, 215 N. Mason St., Fort Collins, CO 80521 Office 970-416-2032 Email: esaunders@fcgov.com Traffic Operations: Syl Mireles, 626 Linden Street, Fort Collins, CO 80521 Office 970-221-6815 Fax 970-6282 Email: smireles a fc ov com Transportation Planning: Kathleen Bracke, 281 N. College Av., Fort Collins, CO 80521 Office 970- 224-6140 Email: kbracke a fc ov com Development Construction Permit, Page 515 Forestry: Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521 Office 970-224-6302 Fax: 970-221-6586 Email: rzentzQfc ov com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6152 Fax 970-221-6619 Email: dmartinenfcgov com Developer' Contact Persons: Project Manager/Developer/Owner: Stan Everitt, Everitt Companies, 3003 E. Harmony, Suite 400, Fort Collins, CO 80528 Office: 970-226-1500 Cell: 970-222-4152 Fax: 970-233-4156 Email: stanenu everittcompam Planner: Luis Hinojosa, Vaught, Frye, Ripley Design, Inc., 401 West Mountain Ave., Suite 200, Fort Collins, CO 80521 Office: 970-224-1191 Ext. 113 Fax: 970-224-1662 Email: luis.hinoiosaa frdesigninc com Project Engineer: Nick Haws, Northern Engineering 200 S. College Ave. Suite 100, Fort Collins, CO 80521 Office: 970-221-4185 Fax: 970-221-4159 Email: nick @Dnorthernengineerin com General Contractor: Dave Carlson, Brinkman Construction, Inc. 3003 E. Harmony, Suite 300 Fort Collins, CO 80528 Office: 970-267-0954 Cell: 970-566-1087 Fax: 970-206-1011 Email: dave.carlson brinkmanpartners com z _O F- J U Q W a m w OZLL F- Z Z p H 0 :3 ul U f- crpW U w > = wa0i-- Zwa. a..m w D F- U LU W Q� 2 Q�QF. LLI Oco IL O 1-w_U Q w w F- D Z LLI N 1- 0 z Q W U►�pZ g m w p U p ~ p w p c W V uaa w> �zu~i� 0 LLOOLL Dal_ Q U U O V Q U Ej W W F- W Z S — Z z o m Fw- p p W W U W z > O cn�ma w wCJa a of U U) (n _H Z W p � W J co a U J _ +y a c QZ z2 Q W LY J O rw d a.aa I c > d WS2m IfN M O p 0000000 •-000000 N 6469�LO 6RO 63 69 64 ����ol000 OOclichco, M*cM CA 6% 69 69 0 6% 0 6% 6% tn0000Oo 0O0000 6 O O r-� 0 C* 0 CD 69 6% OCt 00 64 6% r-aoo0oo0 OM000O0 M h O r` O to O M O LOGO 69 6S 69 LO It CO 6% vr C4ell6 M 0O too LO Li ti>:> U�U J -i IQ (j LQ 000000000 OM000oo00 6 W, 0'000000 69 M N M N 63 - r� r- 69 64 N 69 N 69 e- 69 69 69 000000000 r�r�r�000000 O O 6969ti9t flto tfi 6•inOhMM ER 69 ER 69 64 0000000000 Oltm0000000 OcONOr- 064466 69MNONE9-mNCD r-M.- to.--ti0 r 69 69 64 6S 603-69 69 0% —CM0000000 M N Cl D 0 0 0 0 0 0 0 d mwU—)r,tncOCV 006 0-toNNMMO q V 64-69M-0M0 Mtn 64 6F+6Ns60 � 69 � ONCDsY.-OMN LON 2 2 2 S 2 2 2 Iiu- LLUUUUUUU J J J Q Q Q Q Q Q Q w w w w w w w 000000 NOOto00 O O N r� CI), O e- I,- (O 1- O 69 �- (,% - 6% 69 69 63 to O 0 o to to 't000�� O � a•- e- O O bpk 69 6y 69 6s OOCOd•aOMO OtnCo, Nf-*00 �0 —�0MtA CDI-NOco 0 60116964 6k O to M N O .-- O 01-000N0 6 t c") N CO to 64 69 69 64 E9 6'i OM ONM,go Cn >; LL LL Lj . >: _1 In _I _I J CO CO Y m :o U) C 10 CCU E ca L N a>M�0 dU01i c m a p W p J U Z W m F- O Z J J_ F z x W Q p W 0 w in O H p W w Z J J c- � " U _z( ap NZ Z O —m F- M O U LL C7 �' _Z N m0 Mw W Q' H U F LU O z w— �F- uw 0 H F- j W a~ it Z N C > u Z o > > y a m a LL W > d Ol W V LL •~-� N 'M-1 .�-1 e�-1 .wi „ny 0�0 OLL�G o ri N ni R V1 Vl n W Ql tD t0 N n a o m �/1 N e•1 ••1 'y �..� �..� 'y 'y 'y H H H N N N N N N N N M N M M n ^ 00 Vf e-I �y rl N N rl N '-I •-I rl .i .-i '-I N N ti N N rl N rl .i r-I N H e-I W N N H N f�V N .�-1 ��i \ \ O n '� \ \ \ \ \ \ \ \ \ \ ~ ~ ~ "� H ti ti •N-I O 00 .i l0 n N 00 01 t0 O l0 M V1 \ \ \ \ \ \ \ \ Q w N M H �r\f M t\+f a l\O l\O l\O l\D t\O n \ \ \ \ \ \ \ \ O O\i \ \ �M-I N N .N•1 .N•1 .N•1 m .N-1 a c_ H �•+ a v > > > > �i > w a�i o 00 ? a�i .•� .•i .•i ~ ~ N N ti W WFL- u ~M O C �•i �•1 M\'1 M f\vl t+\1 \ Oc \g'ea a c\ \ \N N e'l 3\3 O O n\ ° e 3N 3N N LLO 3N \01 \N \~ \~ \pa��33a W � � NA A N 1?0 N l0 N A (p 10 f0 N m N m f�0 . N N N 10 A m m A A ITp a s a a a a a a a a a a a m a a a a a a a a a a a a a a a m 0 N ^ O O V1 N V1 M N ,NI .Ni N N W 00 t0 O MN1 •�-I M if N ��-1 N a a a a a a a S S 8 o E a a v y N t1� a` w a m 3 m 3 E u Ol 0 w w r .7Y > oil Y y aiJ �c Y o °i 'U CIP °m °aw yoc\ Yo`n E -6 C o ua 3 o poT 3 wn c m N u e! E pw O X 3 O O EL pp Wn 3d + n Giiy0 0 u ° 5-s eaw a o! W r aj1 c N y L ry E0 m N !U O' W vOCi m �"' N m m O W N W j N L m LL 4• O C 1In Z .L" M C_ N LL O. C `1 I` Q a�-1 W W 8 8ii N L1 O 4 C_ 7 W LL YW O U W Cl li Li LL C Q C W W U Y r C a t C Vl U F e r 9NIN33N19N3 NH3H.LHON�lllllln 11b213n0 .a �. o " A S33NW193M 3nN3Ad 3LUN30 S N 1 t II Y qq PP o R � !!! I ' i I �� ®b♦ ■ r .gpg, 006 Tr T 1 T ij6 I!, F y£� 4e P pp pp pp K e33 �a till �,8 C!11 Kn° 4¢ P d 11_1 if N IN ylbt E 1Wy egE6CC6f AEI f :C g�f f f t iF [ Ff [ CSE�i t'0 i i Y yN� �Fyary j¢rd� EI OR is aU 145111 it A KF;11111 M �!: il� O�i Rg� �e� �id �Ya�F ��i u L a Ct� ` II \,-�! x \\ \ m a I 3 iii R G ry e � � A s .- Ai e t a Clty of F6rt Collins TO: Brinkman Construction Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax fcgov. com/engineering MEMORANDUM FROM: Andrew Carney / Rebecca Bernstein DATE: March 28, 2011 RE: Initiate Escrow Account This memo is to acknowledge the receipt of escrow funds in the amount of 81 095.23 for the following: Centre Avenue & Worthington. Centre Avenue Residences (AKA Arrowhead Residences) for the completion of security deposit to guarantee the completion of public improvements When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in escrow will be released to you. Escrow funds have been received from: Centre Avenue Residences, LLC 3003 E Harmony, Suite 400 Fort Collins, CO 80524 cc: Initiate Escrow file Chris Donegon, Investment Administrator Initiated by: Andrew Carney Permit # 11-03