HomeMy WebLinkAboutCENTRE AVENUE RESIDENCES - Filed DCP-DEV. CONSTRUCTION PERMIT - 2011-03-30City of Planning, Development & Transportation
Engineering Department
6rt Collins 281 North College Avenue
PO Box 580
Fort Collins, CO 80522-0580
970.221.6605
970.221.6378 - fax
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: /— a-3 Issuance Date: -3A
Project Name: Centre Avenue Residences — Phases 1 & 2
Project A.K.A.: Arrowhead Residences
Project Location: Northeast Corner of Centre Avenue and Worthington Circle
Permittee: Stan Everitt
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Tees: Permit Application Fee (paid at the time of application) $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $
Total $ �,70
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 0C15. Q 3
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
No Text
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion ofpublic improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/5
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature:
Date:
Approval for issuance:
l
City Engineer Appprr(��'yal: - Date:
(Permit Issuance Date)
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Centre Avenue Residences
Project A.K.A.: Arrowhead Residences
City Staff Contact Persons:
Development Engineer:
Andrew Carney, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6501 Fax 970-221-6378
Email: acarneynfc ov.com
Construction Inspector:
Wayne Lenard, 281 N. College Ave., Fort Collins, CO 80521
Office 970-416-2011 Cell: 970-222-6824
Email: wlenard - fc 7ov.com
Current Planner:
Ted Shepard, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6343 Fax 970-221-6378
Email: tsheuard_fc ov.com
Erosion Control Inspector:
D.A. Black, 700 Wood Street, Fort Collins, CO 80521
Cell 970-218-3011 Fax 970-221-6619
Email: dblack &fcgov.com
Natural Resources:
Erica Saunders, 215 N. Mason St., Fort Collins, CO 80521
Office 970-416-2032 Email: esaunders@fcgov.com
Traffic Operations:
Syl Mireles, 626 Linden Street, Fort Collins, CO 80521
Office 970-221-6815 Fax 970-6282
Email: smireles a fc ov com
Transportation Planning:
Kathleen Bracke, 281 N. College Av., Fort Collins, CO 80521
Office 970- 224-6140 Email: kbracke a fc ov com
Development Construction Permit, Page 515
Forestry:
Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521
Office 970-224-6302 Fax: 970-221-6586
Email: rzentzQfc ov com
Light and Power:
Doug Martine, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6152 Fax 970-221-6619
Email: dmartinenfcgov com
Developer' Contact Persons:
Project Manager/Developer/Owner:
Stan Everitt, Everitt Companies, 3003 E. Harmony, Suite 400, Fort Collins, CO 80528
Office: 970-226-1500 Cell: 970-222-4152
Fax: 970-233-4156 Email: stanenu everittcompam
Planner:
Luis Hinojosa, Vaught, Frye, Ripley Design, Inc.,
401 West Mountain Ave., Suite 200, Fort Collins, CO 80521
Office: 970-224-1191 Ext. 113 Fax: 970-224-1662
Email: luis.hinoiosaa frdesigninc com
Project Engineer:
Nick Haws, Northern Engineering
200 S. College Ave. Suite 100, Fort Collins, CO 80521
Office: 970-221-4185 Fax: 970-221-4159
Email: nick @Dnorthernengineerin com
General Contractor:
Dave Carlson, Brinkman Construction, Inc.
3003 E. Harmony, Suite 300 Fort Collins, CO 80528
Office: 970-267-0954 Cell: 970-566-1087
Fax: 970-206-1011 Email: dave.carlson brinkmanpartners com
z
_O
F-
J U
Q W
a
m
w
OZLL
F-
Z Z p H
0 :3 ul U
f-
crpW
U w > =
wa0i--
Zwa.
a..m
w
D
F-
U
LU
W Q�
2 Q�QF.
LLI
Oco IL O
1-w_U
Q w w
F- D Z LLI
N 1- 0 z Q
W U►�pZ g m
w p U p
~ p w p c W
V uaa w>
�zu~i�
0 LLOOLL Dal_
Q U U O V Q U
Ej
W W
F- W Z
S —
Z z
o m Fw-
p p
W W
U
W z >
O cn�ma
w wCJa
a
of
U U) (n
_H
Z W
p �
W
J
co a
U
J _
+y a
c QZ
z2
Q W
LY J O
rw
d a.aa I
c >
d WS2m
IfN M O p
0000000
•-000000
N 6469�LO 6RO
63 69 64
����ol000
OOclichco, M*cM
CA 6% 69 69 0 6% 0
6% 6%
tn0000Oo
0O0000
6 O O r-� 0 C* 0
CD 69 6% OCt 00 64 6%
r-aoo0oo0
OM000O0
M h O r` O to O
M O LOGO 69
6S 69 LO It CO
6% vr C4ell6
M 0O too
LO
Li ti>:> U�U
J -i IQ (j LQ
000000000
OM000oo00
6 W, 0'000000
69 M N M N 63 - r� r-
69 64 N 69 N 69 e-
69 69 69
000000000
r�r�r�000000
O O 6969ti9t flto tfi
6•inOhMM
ER 69 ER 69 64
0000000000
Oltm0000000
OcONOr- 064466
69MNONE9-mNCD
r-M.- to.--ti0
r 69 69 64 6S 603-69 69 0%
—CM0000000
M N Cl D 0 0 0 0 0 0 0
d mwU—)r,tncOCV 006
0-toNNMMO q V
64-69M-0M0 Mtn
64 6F+6Ns60 � 69 �
ONCDsY.-OMN LON
2 2 2 S 2 2 2
Iiu- LLUUUUUUU
J J J Q Q Q Q Q Q Q
w w w w w w w
000000
NOOto00
O O N r� CI), O
e- I,- (O 1- O 69
�- (,% - 6%
69 69 63
to O 0 o to to
't000��
O � a•- e- O O
bpk 69 6y 69 6s
OOCOd•aOMO
OtnCo, Nf-*00
�0 —�0MtA
CDI-NOco
0 60116964
6k
O to M N O .-- O
01-000N0
6 t c") N CO to 64
69 69 64 E9 6'i
OM ONM,go
Cn >; LL LL Lj . >:
_1 In _I _I J CO CO
Y
m
:o
U)
C 10 CCU
E ca L N
a>M�0
dU01i
c
m
a
p
W
p
J
U
Z
W
m
F-
O
Z
J
J_
F
z
x
W
Q
p
W
0
w
in
O
H
p
W
w
Z
J
J
c-
�
" U _z(
ap
NZ
Z O
—m
F- M
O
U LL
C7 �'
_Z N
m0
Mw
W
Q' H
U
F
LU
O z
w—
�F-
uw 0
H F-
j W
a~
it Z
N
C >
u
Z o > >
y a m a LL
W > d Ol
W V LL •~-� N 'M-1 .�-1 e�-1 .wi „ny 0�0 OLL�G o ri N ni R V1 Vl n W Ql tD t0 N n a o m �/1
N e•1 ••1 'y �..� �..� 'y 'y 'y H H H N N N N N N N N M N M M n ^ 00
Vf e-I �y rl N N rl N '-I •-I rl .i .-i '-I N N ti N N rl N rl .i r-I N H e-I
W N N H N f�V N .�-1 ��i \ \ O n '� \ \ \ \ \ \ \ \ \ \ ~ ~ ~ "� H ti ti •N-I O 00 .i l0 n N 00 01 t0 O l0 M V1 \ \ \ \ \ \ \ \
Q w N M H �r\f M t\+f a l\O l\O l\O l\D t\O n \ \ \ \ \ \ \ \ O O\i \ \ �M-I N N .N•1 .N•1 .N•1 m .N-1
a c_ H �•+ a v > > > > �i > w a�i o 00 ? a�i .•� .•i .•i ~ ~ N N ti
W
WFL-
u
~M O
C �•i �•1 M\'1 M f\vl t+\1 \
Oc \g'ea a c\ \ \N N e'l 3\3
O O n\
° e 3N 3N N LLO 3N \01 \N \~ \~ \pa��33a
W � �
NA A N 1?0 N l0 N A (p 10 f0 N m N m f�0 . N N N 10 A m m A A ITp
a s a a a a a a a a a a a m a a a a a a a a a a a a a a a m
0 N ^ O O V1 N V1 M N ,NI .Ni N N W 00 t0 O MN1 •�-I M if N ��-1 N a a a a a a a
S S 8 o
E
a
a
v
y
N
t1�
a`
w
a
m
3
m
3
E
u
Ol
0
w
w
r
.7Y
>
oil
Y
y
aiJ
�c
Y
o
°i
'U
CIP
°m
°aw
yoc\
Yo`n
E
-6
C
o
ua
3
o
poT
3
wn
c
m
N
u
e!
E
pw
O
X
3
O
O
EL
pp
Wn
3d
+
n
Giiy0
0
u
°
5-s
eaw
a
o!
W
r
aj1
c N
y
L
ry
E0
m
N
!U
O'
W
vOCi
m
�"' N
m
m
O
W
N
W
j N
L
m
LL 4•
O
C
1In
Z
.L"
M
C_
N
LL O.
C
`1
I`
Q
a�-1
W
W
8
8ii
N
L1
O
4
C_ 7 W
LL
YW
O
U
W
Cl
li
Li
LL
C
Q
C
W
W U
Y
r
C a
t
C
Vl U
F
e
r 9NIN33N19N3
NH3H.LHON�lllllln 11b213n0
.a �.
o
" A S33NW193M 3nN3Ad 3LUN30 S
N
1
t II Y qq
PP
o R � !!! I ' i I �� ®b♦ ■ r .gpg, 006
Tr T 1 T ij6 I!, F y£� 4e P pp pp pp K e33 �a till
�,8
C!11 Kn° 4¢ P d 11_1 if N IN ylbt
E 1Wy egE6CC6f AEI f :C g�f f f t iF [ Ff [ CSE�i t'0 i i Y yN� �Fyary j¢rd� EI OR is aU 145111 it A
KF;11111 M �!: il� O�i Rg� �e� �id �Ya�F ��i u L
a Ct�
`
II \,-�! x \\ \ m a I
3 iii R G
ry
e �
� A
s .-
Ai
e
t
a
Clty of
F6rt Collins
TO: Brinkman Construction
Planning, Development & Transportation
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6605
970.221.6378 - fax
fcgov. com/engineering
MEMORANDUM
FROM: Andrew Carney / Rebecca Bernstein
DATE: March 28, 2011
RE: Initiate Escrow Account
This memo is to acknowledge the receipt of escrow funds in the amount of 81 095.23
for the following:
Centre Avenue & Worthington. Centre Avenue Residences (AKA Arrowhead
Residences)
for the completion of
security deposit to guarantee the completion of public improvements
When improvements to the Right -of -Way are completed, please call our
inspection recorder at 221-6609 to request an inspection (please allow 24 hours
for the inspection to take place). Once the improvements have passed inspection,
the funds in escrow will be released to you.
Escrow funds have been received from:
Centre Avenue Residences, LLC
3003 E Harmony, Suite 400
Fort Collins, CO 80524
cc: Initiate Escrow file
Chris Donegon, Investment Administrator
Initiated by: Andrew Carney
Permit # 11-03