Loading...
HomeMy WebLinkAboutENGLISH RANCH SOUTH PUD THIRD 2700 BLOCK PADDINGTON ROAD - Filed MA-MINOR AMENDMENT - 2003-01-15Page is too large to OCR. Au9-21-02 09: 15A P-01 Au9-21-02 09:15A P.02 For Office tea only: Current Planning Department Dale Accepted Current Planning H - Minor Amendment Plpnner_ EffiI Date "- o Application Form Gh ug Po„�n,,,m Pro)eu Name: rr5l tsn Konen .00ucn Y.u.u., Jrn filing, Ints 1-16 Pco)ea Location (Street Address): Kingsley Ct, Newbury Ct, Harringtoluunor Amendment Fee: $192.00 Subdivision Name: Fnglish Ranch South P.U.D., 3rd Filing Generallnrnrmalion: Liu nil property owners havinRnfegnl/equiea4le imnen iruLepmprrtY (AnnaM1.repum,e sheen Jn7eM rityj ED Owner's Narrri Hartran Construction, Inc. Street Address 2656 Paddington Road Fort Collins, CO 80525 Telephom: 970-204-1700 Fax; 970-204-0800 fIIHHENI PLAN NINN ApplicatiII7owultanl's Name: Can Fortran Ssmeaffirm: Bartran Construction, Inc. Street address: 2656 Paddington Road C,t")NuaNhip: Fort Collins, CO 80525 Telephone9707204-1706 �-OBOo - : General Lagos Description or Propert Lots 1-18, English Ranch South P.U.D., 3rd Filing 1) Four (4) copies of RECORDED plan (i.e. site, landscape, elevation -whichever is being uttered) in 24"x36" size (available at the Technical Services Department at 281 N. College)-RED-LINETHE CHANGES ON THREE (3) OF THE COPIES; 2) Completed and signed application form; and 3) Application fee (if S192.00. MINOR AMENDMENT Detailed description of the change and reason(s) for life request Amend the minimum front setback on Lots 1-18 from 20' to 15'. A side -entry garage will be used when necessary to always maintain a minimum of 20' of driveway pest the City sidewalk. I believe current zoning allows for this request. Thanks, Dan B. UC'ER TIFICA TION ON REVERSE SIDE MUST BE SIGNED. a lrTeCnve a�em±- lroAren trv,o± Current Planning APPROVED Comments/Conditions: daaY Inshe Date: Cl APPROVED WV/ By: ❑ DENIED Zoning APPROVED ❑ APPROVED WICOND17'IOINS ❑ DENIED Comments/Conditions:a LMh/ 2rl n{IQd- a2i'at,r IJeeLlF e� Date: Ia' -Id _p3 By: Engineering ❑APPROVED WAPPROVEDW/COA'DITION.S ❑DENIED Other (if applicable) ❑ APPROVED ❑ APPROVED W/CONDITIONS ❑ DENIED C,rimants/Conditions: Date: By: CERTIFICATION «miry d¢inlurm>nan and col.ibiu submincJ ve weand cortmlm the ben n(mY knovlNSe vnJ IholmnlinN (his oppl¢vlan. amxvng rilh the kmrkdge. h and oc o of the oNorin of the property (including all orvnhoists as hing a led m equitable anvil in the rot ,to", ss defined tine aN im 1-2 of m, City CWc which it re mblm of to armlicaionl mahool whose miteu vul a ifify, the requested action should INN luwfullY be ncommam mahoj Pua t lu smd hmiy. I hNI Ineemn City ollicinle to "m the pr ph nfor the impose of imraomn. and it necessaryhe palm, a pi mace on theeNI Nannlplesse PRINT): Bartran Construction, Inc. by Wniel K. Hartran - Address P.O. Box 270855 Fort Collins, CO B0527 Telephone: 970-204-1700 SlgmmrpgY—