Loading...
HomeMy WebLinkAboutEVERGREEN PARK SECOND - Filed OA-OTHER AGREEMENTS - 2002-12-31Page is too large to OCR. EXHIBIT A Page 1 of 2 Western Area Power Administration Rocky Mountain Customer Service Region NOTE - RIGHT -OF -WAY USE APPLICATION Date: May 1 1998 7'rcmsmission Line: Poudre-Richard's Lake 115-kV A minimum clearance of at least 12 feet from the conductors must be maintained at all times. Description of Proposal (Narrative): 75' foot drainage channel on WAPA easement Location: Section 1 Township 7N. , Range 69W. , 6th P.M. (Meridian) County: Larimer State: Colorado complete if' applicable: Subdivision Evergreen Park Second Filing ,Lot Block City Fort Colli Colorado PROFILE: Show the location, height (feet), and distance (feet) from the nearest transmission line structure. WAPA Structure WAPA Structure No. 20/9---------- > <---------- No. 20/10 See Exhibit A, Page 2 PLAN: Show the location and dimensions (in feet) of the proposed facility in relation to the center conductor of the transmissiion line. ROW--------------------------------- ---------------- - ------------ --------------------------------------ROW -- Transmission Line Transmission Line See Exhibit A, Page 2 Centerline �— WAPA Structure WAPA Structure No change in elevation No.20/9 ---------->----------- No. 20/10 ROW-------------------------------------------- - ROW Show NORTH by arrow at (+) in block nwva nua at left and show approximate location in Section at right. swua seiro Attach other drawings and information as appropriate. R.J. DEVELCO Address: 605 South College Avenue Fort Collins CO 80524 Telephone No.: ( 970 ) CM-5059 Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.