HomeMy WebLinkAboutTROUTMAN PUD PHASE TWO REPLAT - Filed E-ELEVATION PLAN - 2002-10-17Page is too large to OCR.
t
ip
L
v
BUILDING — 8
FRONT ELEVATION
EAST ELEVATION
TILE ROOF
SLUMP BLO
_MTL_SERVI(
MTL DOOR
_TILE ROOF --
SLUMP BLOCK
WEST ELEVATION
_ -.. w„—
Y
Tj
l
I
90L.ir : Y60 . r.00
NORTH ELEVATION
SOUTH ELEVATION
`40" 6467FOE LOCATE
-
A* Am u rx etas
TILE ROOF
t--SLUMP BLOCK
NOTES
Buildings 4 - 7 and 8 are depicted on the rendering with harmonious materials. Each of
these buildings will have slump block exterior wall which will have a warm tone tan
coloration throughout. Each building will have the same tile roof material of a red -
earth tone - terracotta that has an interlocking curved form. Window frame and entry
doors and frames are to
be anodized aluminum. Service door and personnel door are to
be metal and painted to match the main body color of the slump block. Glass is to be
i clear in color. These materials match the materials of the existing building of the
first filing for Troutman P.U.D. and are consistent to the previously approved filing
two documentations. Building 7 depicted in the rendering is a future construction and
will match the materials and colors of Buildings 4 and 8.
i
TYPE END ELEVATION.
BUILDING • 4
TROUTMAN P UnDu
N
P)
(Z£l 7f'1