Loading...
HomeMy WebLinkAboutPARK SOUTH PUD SECOND REPLAT - Filed GC-GENERAL CORRESPONDENCE - 2009-01-05D evelo ent Services Engineering Department August 24, 1992 Mr. Mark Middel 1407 South College Avenue Fort Collins, Colorado 80524 RE: Park South, 1st and 2nd Replat To Whom It May Concern: It is standard policy for the City of Fort Collins to accept for perpetual maintenance those public right-of-way constructions which have been approved by the City and which have passed all required guarantee periods. This includes the water main, sanitary sewer mains, storm sewer lines and facilities, street pavements, street lights, and street signs. Based upon our limited inspection and to the best of knowledge the subdivision improvements have also been constructed in accordance to City standards. Sincerely, David Stringer Chief Construction Inspector DS/ltg 2SI %l ,ith C Avenue • P.O. Bov ;RO • Fort Collin, CO 811122-0S80 • (101) 221-66u= C_ommt ry Planning and Environmental rvices Engineering Department City of Fort Collins March 27, 199:3 Mr. Mark Middel 1407 South College Avenue Fort Collins, Colorado RE: Park South P.U.D. Second Replat, a Replat of Park South P.U.D. To Whom It May Concern: It is standard policy for the City of Fort Collins to accept for Perpetual maintenance those public right-of-way constructions which have been approved by the City and which have passed all required guarantee periods. This includes the water mains, sanitary sewer mains, storm sewer lines and facilities, street pavements, street lights and street signs. Based upon our limited inspection and to the best of our knowledge the public improvements in the subdivision have been constructed in accordance to City Standards. sincerely David Stringer V Chief Construction Inspector 281 %orth C'olloge Avenue • P.0 . Box 580 • Fort Collins, CO 80522-0580 • j303) 221-6[,0;