HomeMy WebLinkAboutPARK SOUTH PUD SECOND REPLAT - Filed GC-GENERAL CORRESPONDENCE - 2009-01-05D evelo ent Services
Engineering Department
August 24, 1992
Mr. Mark Middel
1407 South College Avenue
Fort Collins, Colorado 80524
RE: Park South, 1st and 2nd Replat
To Whom It May Concern:
It is standard policy for the City of Fort Collins to accept for perpetual
maintenance those public right-of-way constructions which have been approved by
the City and which have passed all required guarantee periods.
This includes the water main, sanitary sewer mains, storm sewer lines and
facilities, street pavements, street lights, and street signs.
Based upon our limited inspection and to the best of knowledge the subdivision
improvements have also been constructed in accordance to City standards.
Sincerely,
David Stringer
Chief Construction Inspector
DS/ltg
2SI %l ,ith C Avenue • P.O. Bov ;RO • Fort Collin, CO 811122-0S80 • (101) 221-66u=
C_ommt ry Planning and Environmental rvices
Engineering Department
City of Fort Collins
March 27, 199:3
Mr. Mark Middel
1407 South College Avenue
Fort Collins, Colorado
RE: Park South P.U.D. Second Replat, a Replat of Park South P.U.D.
To Whom It May Concern:
It is standard policy for the City of Fort Collins to accept for
Perpetual maintenance those public right-of-way constructions which
have been approved by the City and which have passed all required
guarantee periods.
This includes the water mains, sanitary sewer mains, storm sewer
lines and facilities, street pavements, street lights and street
signs.
Based upon our limited inspection and to the best of our knowledge
the public improvements in the subdivision have been constructed in
accordance to City Standards.
sincerely
David Stringer V
Chief Construction Inspector
281 %orth C'olloge Avenue • P.0 . Box 580 • Fort Collins, CO 80522-0580 • j303) 221-6[,0;