Loading...
HomeMy WebLinkAboutSUNSTONE VILLAGE PUD SECOND - Filed GC-GENERAL CORRESPONDENCE - 2008-08-05w.► CITY OF FORT COLLINS DEVELOPMENT SERVICES — ENGINEERING May 5, 1988 Flatiron Paving Company Attn: Mark Bower P.O. Box 504 Fort Collins, CO 80522 Re: Water Line Repairs - Sunstone Village 1st and 2nd Dear Mark: Several water line repair items in the Sunstone Village 1st and 2nd subdivisions have been brought to my attention by the City Water Department. As there has been some verbal communication with Flatiron Paving Company as to these items, I am now giving you a full listing of items and a time table to complete the repairs. The items are as follows: 1. Raise fire hydrants at 2913 Sunray Court and 2548 Sunstone Drive. 2. Uncover water valve boxes at 2548 Sunstone Drive, south side of street and on Caribou Road between Sunray Court and Flagstone Court. 3. Center valve box over valve at 2455 Sunstone Drive. 4. Turn fire hydrant so it is perpendicular to the street at 2454 Sunstone Dr. 5. Straighten fire hydrant and replace broken weather cap at Caribou Road and Stony Creek Drive. DEVELOPMENT SERVICES 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 2216605 ENGINEERING Deve I o p in enT Services Engineering Department t'ily of Fuit Collins August 7, 1990 The Group, Inc. Attn: Linda Hopkins 401 W. Mulberry Fort Collins, Colorado 80521 Re: Sunstone 2nd Filing Dear Mrs. Hopkins: As you are aware, the concrete curbs and gutters in certain portions of the Sunstone 1st and 2nd filings do not drain properly. Unfortunately, this problem continues to plague us. We have received a citizen complaint about the gutter adjacent to 4137 Sunstone Drive, which allows water to pond and algae to accumulate. When our inspector checked the problem, he found about five feet of gutter with reverse slope, ten feet which is flat and another nine to ten feet that humps up to the radius point of curvature (see enclosed sketch). After reviewing the street profiles on the approved utility plans, I found the gutter was to have been installed at a straight line grade from 147 feet west to the PC, at a grade of 0.4%. It is obvious fran what was constructed in the field that the plan grades were not followed. Under normal circumstances, the City would pursue this matter with the Contractor. However, in this case the Contractor is no longer in business and I am at a loss as to how to get the situation corrected. I would certainly appreciate any input you might have towards this matter. i41 I -Ace nn PA 1, 13'1� 580 • I)II ( ,II l-(1 ,(1;22 1`isl) ('iIISI %r The Group, Inc. Page Two Secondly, late last fall I informed you of my concerns about the drainage on Flagstone Court. If I recall correctly, you were going to have an engineer review the as -built gutter and then get back with me. In searching our records, I cannot find the results of this survey and would appreciate a copy of the engineer's results if you have them. Thank you for your consideration in this matter. Please feel free to contact meat 221-6605. Sincerely, David Stringer Chief Construction Inspector J �.• . � � + POW Flatiron Paving Company May 5, 1988 page 2 Due to the importance of these repairs, we are requiring them to be completed by the end of the work day on May 20, 1988. Failure to have these repairs completed by the 20th of May may affect the release of all Building Permits and Certificates of occupancy on both of the above mentioned subdivisions. Thank you for your timely response on these items. Sincerely, r 'cic Rich ` Construction Inspector CC: D.E. Burns Construction Schmidt Earth Builders Terry Popejoy - Water Department `41 CITY OF FORT COLLINS DEVELOPMENT SERVICES — ENGINEERING August 12, 1988 Flatiron Paving Company Attn: Mark Bower P.O. Box 504 Fort Collins, CO 80522 Re: Repairs at Sunstone Village 2nd Dear Mark: Several repair items in the Sunstone Village 2nd Subdivision have been brought to my attention by the City Water Department, As there has been some verbal communication with Flatiron Paving Company as to these items, I am now giving you a full listing of items and a time table to complete the repairs. The items are as follows: 1. Raise fire hydrants at 2319 Sunray Court, 2321 Flagstone Court, Southwest corner of Sunstone Drive and Caribou, Southwest corner of Suncrest and Stonegate, Northeast corner of Suncrest and Caribou, and 4135 Stonegate Court. 2. Straighten fire hydrant and replace broken weather cap at Caribou Road and Stony Creek Drive. The fire hydrants at 2319 Sunray Court and 4135 Stonegate Court will need to also be set perpendicular to the sidewalk. 3. Also to be repaired are the following: The manholes in Flagstone Court that were damaged by the paving of the street, and the concrete sidewalk at the Northeast corner of Caribou and Timberline Drive, and at Sunstone Drive and Stonegate. '� 14F.�ie; rJ}"rtal.i: fr\077 r"'.,-n' _ -.. 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6605 V Due to the nature of these repairs, we are requiring them to be completed by the end of the work day on August 31, 1988. Failure to have these repairs conpleted by the 31st of August, will affect the release of all Building Permits. Thank you for your timely response on these items. sincerely, Rick Rd t Construction Inspector cc: Don Hahn Construction Terry Popejoy, City of Fort Collins Water Department 41 Dev%.pment Services Engineering Department August 31, 1989 Linda Hopkins The Group, Inc. 375 E. Horsetooth Road Fort Collins, Colorado 80525 Re: Curb and gutter drainage, Sunstone 2nd Dear Ms. Hopkins: Recently I received a complaint call from a Debbie Young at 2320 Flagstone Court stating that the gutter adjacent to her house did not drain properly. After visiting the site and looking at the Engineer's design, I found that the gutter was designed with minimal slope and may or may not be constructed as designed. A survey needs to be performed to determine if a Problem was created during construction. In addition, I noticed that the northwest radius at Flagstone and Caribou holds a substantial amount of water. This radius appears to have been constructed or surveyed incorrectly and does not function until water backs up in the cross pan to a depth of approximately 3 inches. The condition of the radius as it currently exists, will create a hazard to motorist and pedestrian traffic this winter. Therefore, I must request that this condition be corrected. Additionally, I would appreciate it if your surveyor would also check the gutter at 2320 and determine if this section is built according to the Engineer's design. Another item that I noticed, is the gutter area on Caribou throughout the entire Sunstone Development which is holding more water then it should. After accessing the situation, I believe the major problem is the dirt and debris which has accumulated in the gutter. In several areas grass and weeds are growing which create additional blockages at the water flow line. Due to the fact that the continual setting of water on an asphalt pavement causes premature deterioration, I would like the gutters to be thoroughly cleaned as well. ,w LaPorte A%enue • P.O. Box 580 • Fort Collins, CO 80522_07i80 • (303) 221-6605 u Linda Hopkins Page TWo Thank you in advance for your cooperation in this matter. If you have any questions, please call me at 221-6605. Sincerely, David Stringer Chief Construction Inspector 6 0 r\ as ozz r� o _- � Caribou � f � r fJriVc m f Rio SUNSTONE VILLAGE ASSOCIATES NSTONE VILLAGE - SECOND SUB. STONEGATE CT./ STONERIDGE CT./ SUNRAY CT. / FLAGSTONE CT. PLAN / PROFILFS in the September 6, 1989 DID 9rouPo Realtors Mr. David Stringer Chief Construction Inspector Engineering Services P.O. Box 580 Fort Collins, CO 80522 Dear David, inc. I received your letter regarding Sunstone and the apparent drainage problem on Flagstone. I've requested Landmark Survey the area and verify the plans and construction. I also pulled the weeds in the gutter and I'm contracting for street sweeping services to help alleviate some of the problems. I will keep you informed and I'll appreciate your help. Thank you. Sincerely, Linda Hopkins Vice President LH:ka 401 West Mulberry Street Fort Collins. Colorado 80521 Telephone 3031221-0700 9 %W ge TI-IE GROUT' INC. REAUORS May 23, 1990 Mr. Dave Stringer City of Fort Collins Engineering Services P.O. Box 580 Fort Collins, CO 80522 Dear Dave, IM I have enclosed a copy of Landmark's response to my request that they formally answer the inquiry regarding the installation of curb and gutter in Flagstone. The grades in that area have been checked a number of times and the problems seem to have been alleviated in part by the owners cooperation on their landscaping and watering. Super Group, Inc. is planning to do a final sweep and clean up in conjunction with the completion of the Sunstone Fifth project. Thank you for your help. Sincerely, Linda Hopkins President/Super Group, Inc. L1I/ka 401 West Mulberry Sbrel •furl ('ullins, Colorado M1521 • R-lephono 303/221-071M) 175 NO I lorwtoulh Road • Purl Collins, Colmadu W1,25 • Telephone 31131223-071N1